Loading...
HomeMy WebLinkAboutFIRE CC Letter-The Cottages at Blackwood Groves SP 12-27-2021 December 27, 2021 Matt Hausauer Bridger Land Group 115 W Kagy Blvd, Ste L Bozeman, MT 59715 RE: Concurrent Construction for proposed The Cottages at Blackwood Groves SP #21421. Mr. Hausauer, Per documents uploaded within Project Dox dated November 18, 2021. I approve concurrent construction for The Cottages at Blackwood Groves, Block 10&11 project. The proposed fire hydrant layout and water supply requirements meet city standards. The following requirements must be met for this approval to be binding. 1. 365/24/7 access to working hydrants and acceptable, approved water source 2. Staging plan for location of construction materials, temporary work trailer, and any additional combustible materials 3. Ingress and egress routes for emergency services 4. All weather site access 5. Knox locks for fenced or gated areas Scott Mueller Deputy Chief Fire Marshal 406.582.2353 smueller@bozeman.net