Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
AG000CoverSheet
OWNER Kathleen Brewer Mitchell Development & Investments 2880 Technology Blvd. West Suite #195 Bozeman, MT 59718 VOICE: 406.531.5356 STRUCTURAL Steve Busey BSE Structural Engineers LLC 11320 West 79th Street Lenexa, KS 66214 VOICE: 913.492.7400 CIVIL Jim Ullman, PE Morrison-Maierle 2880 Technology Blvd West Bozeman, MT 59718 VOICE: 406.922.6825 LANDSCAPE Alyssa Ross Red Barn Montana 3084 Thrope Road Belgrade, MT 59714 VOICE: 406.924.8038 ARCHITECT Frank Malek 101 Architecture LLC 8400 E. Crescent Parkway, Suite 160 Greenwood Village, CO 80111 VOICE: 720.881.1600 MECH. & PLUMB. Peter McDonald, PE McDonald Consulting + Design, Inc. 10698 Amesbury Way Highlands Ranch, CO 80126 VOICE: 303.875.9293 ELECTRICAL Sophia Gisin RG Consultants, Inc. 8811 E. Hampden Ave. Suite 208 Denver, CO 80231 VOICE: 303.355.5534 HUFFINE LANE / U.S. HWY 191 FOWLER AVETE CHN OLO G Y BLV D W ES T PROJECT LOCATION HARMON STREAM BLVD.TECHNOLOGY BLVD WEST STREAM / RIVER GRID INDICATOR - EXISTING GRID INDICATOR - NEW BA 2 1 LEVEL 1 100'-0" BUILDING SECTION VERTICAL ELEVATION DATUM RELATIVE TO FIRST LEVEL ROOM TAG FLAGNOTE TAG DOOR TAG WINDOW TAG EXTERIOR ELEVATION INTERIOR ELEVATION DETAIL INDICATOR WALL SECTION FURNITURE, CASEWORK, EQUIPMENT TAG FLOOR FINISH TRANSITION MATERIALS TAG REVISION TAG DETAIL CALLOUT N NORTH ARROW PROJECT NORTH TRUE NORTH A101 1 9 A-3.0 NUMBER ON SHEET SHEET NUMBER ROOM NAME 101 100 S.F. ROOM NUMBER ROOM AREA XXX 1 1 A101 SIM 1 A101 SIM NUMBER ON SHEET NUMBER ON SHEET SHEET NUMBER SHEET NUMBER 1i FINISH 1 FINISH 2 XX XX 1 A101 1 WALL TAGXX F ?XX 1. THE TERM “GC”SHALL MEAN THE GENERAL CONTRACTOR AND HIS SUB- CONTRACTORS. 2. DRAWINGS ARE FOR DESIGN INTENT ONLY THE GC SHALL REVIEW THE CONTRACT DOCUMENTS AND THE SITE. SHOULD THE GC FIND DISCREPANCIES THE GC SHALL REQUEST CLARIFICATION IN WRITING FROM THE ARCHITECT BEFORE COMMENCING WITH THE WORK. 3. SHOULD A CONFLICT OCCUR BETWEEN THE DRAWINGS AND SPECIFICATIONS, THE MOST STRINGENT QUANTITY OR QUALITY SHALL PREVAIL. 4. THE INTENT OF THE CONTRACT DOCUMENTS IS TO PROVIDE A COMPLETE PROJECT. EVERY ITEM MAY NOT BE SHOWN OR CALLED OUT. 5. THE GC IS RESPONSIBLE FOR MEANS AND METHODS OF CONSTRUCTION, COORDINATION OF TRADES, AND SCHEDULING OF WORK. 6. THE GC SHALL NOT REVISE, SUBSTITUTE, OR CHANGE THE WORK WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT. 7. NOT EVERY CONDITION MAY BE DRAWN OR DETAILED. 8. DO NOT SCALE ANY DRAWINGS. 9. PROVIDE NECESSARY BLOCKING IN WALLS, PARTITIONS, AND CEILINGS FOR ALL MOUNTED ITEMS. 10. ALL BUILDING AREAS SHALL BE FULLY SPRINKLERED PER NFPA-13. 11. THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS AT THE JOB SITE RELATING TO THE WORK OF EACH TRADE. 12. ALL WORK PERFORMED BY THE CONTRACTOR SHALL CONFORM TO THE REQUIREMENTS OF MUNICIPAL, LOCAL, OR FEDERAL AND STATE LAWS AS WELL AS ANY OTHER GOVERNING REQUIREMENTS, WHETHER OR NOT SPECIFIED ON THE DRAWINGS. 13. MAINTAIN JOBSITE IN A CLEAN, ORDERLY CONDITION, FREE OF DEBRIS AND LITTER. IMMEDIATELY UPON COMPLETION OF EACH PHASE OF WORK, REMOVE ALL TRASH, DEBRIS. AND WASTE MATERIALS FROM THE JOB SITE AND DISPOSE OF IN ACCORDANCE WITH GOVERNING REGULATIONS. 14. NOTIFY THE OWNER IMMEDIATELY IN WRITING IF ANY AREAS ARE DISCOVERED TO CONTAIN HAZARDOUS MATERIAL WITHIN THE SCOPE OF WORK. 15. REPAIR AT NO COST TO THE OWNER DAMAGE TO (E) CONDITIONS AS A RESULT OF THE WORKPERFORMED UNDER THIS CONTRACT. 16. INSTALL CONSTRUCTION FENCING AT THE PERIMETER OF CONSTRUCTION WORK PERIMETER. THE BUILDING IS TYPE 5A WOOD FRAME CONSTRUCTION. EXTERIOR BUILDING SKIN AS DETAILED IN THIS SET IS FIBER CEMENT PANEL AND SIMULATED STONE. THE PROTOTYPE IS DESIGNED TO BE CONSTRUCTED WITH AN APPROVED AUTOMATIC SPRINKLER SYSTEM. USES FOR THE HOTEL INCLUDE GUESTROOMS, PUBLIC SPACE (LOBBY AND LOUNGE), FRONT OF HOUSE AREA (REGISTRATION DESK, WORK ROOM, OFFICE) AND BACK OF HOUSE AREA (OFFICE, LAUNDRY, ELECTRICAL, MECHANICAL, AND EMPLOYEE BREAK ROOM. STAIR AND SHAFT ENCLOSURES AS DETAILED FOR THE FOUR-STORY PROTOTYPE ARE TWO-HOUR RATED. CODE: INTERNATIONAL BUILDING CODE (2018 EDITION) TYPE OF CONSTRUCTION: -TYPE V-A -PROVIDE FOR SUPERVISED AUTOMATIC SPRINKLER SYSTEM PER SECTION 903.3.1.1 OCCUPANCY CLASSIFICATIONS: -R-1 RESIDENTIAL (TRANSIENT HOTEL) -A-2 ASSEMBLY (FOOD AND DRINK) -B BUSINESS (OFFICE AND BACK OF HOUSE) SECTION 504.3 & 504.4 ALLOWABLE BUILDING HEIGHT AND AREA: -R-1: 4 STORIES ABOVE GRADE AND 70' IN HEIGHT; 36,000 SF -A-2: 3 STORIES ABOVE GRADE AND 70' IN HEIGHT; 34,500 SF -B: 4 STORIES ABOVE GRADE AND 70' IN HEIGHT; 54,000 SF THE BUILDING CONTAINS MIXED-OCCUPANCY GROUP CLASSIFICATIONS WITH “SEPARATED OCCUPANCIES”AS DEFINED BY SECTION 508.4 THE FIRST FLOOR A-2 OCCUPANCY GROUP INCLUDES ALL FIRST FLOOR CORRIDORS . THE FIRST FLOOR B OCCUPANCY GROUP INCLUDES THE BREAK ROOM, LINEN, LAUNDRY, PBX, WORK ROOM, AND OFFICE. THE FIRST FLOOR R-1 OCCUPANCY GROUP INCLUDES GUESTROOMS, STAIRS, ELEVATOR, ELEV. EQUIP AND ELECTRICAL ROOMS. OCCUPANCY SEPARATION IS TO BE MAINTAINED ALONG GUESTROOM CORRIDOR WALLS. MAINTAIN SEPARATION CONSTRUCTION IN ACCORDANCE WITH SECTIONS 707 AND 711 SO AS TO COMPLETELY SEPARATE ADJACENT OCCUPANCIES. MIXED-OCCUPANCY, MULTISTORY BUILDINGS ACTUAL AREAS: LEVEL 1 -R-1: 10,807 SF A-2: 810 SF B: 2,081 SF LEVEL 2 -R-1: 15,489 SF LEVEL 3 -R-1: 15,631 SF LEVEL 4 -R-1: 15,442 SF SECTION 506.2.4, AGGREGATE SUM OF THE ACTUAL AREA OF EACH STORY DIVIDED BY ALLOWABLE AREA OF SUCH STORY SHALL NOT EXCEED 3. THE SUM OF THE SAID RATIO (NOT INCLUDING FRONTAGE INCREASE) FOR EACH STORY IS: LEVEL 1 -0.422 LEVEL 2 -0.425 LEVEL 3 -0.425 LEVEL 4 -0.425 THE AGGREGATE SUM OF RATIO OF EACH STORY IS 1.695 AND <3. SECTION 508.4.2, IN EACH STORY, THE BUILDING AREA SHALL BE SUCH THAT THE SUM OF THE RATIO OF THE ACTUAL BUILDING AREA OF EACH OCCUPANCY DIVIDED BY THE ALLOWABLE BUILDING AREA OF EACH OCCUPANCY SHALL NOT EXCEED 1. THE SUM OF SAID RATIOS ON EACH FLOOR IS: LEVEL 1 -0.422 < 1 LEVEL 2 -0.425 < 1 LEVEL 3 -0.425 < 1 LEVEL 4 -0.425 < 1 FIRE RESISTANCE: -FIRE BARRIERS SEPARATING OCCUPANCIES (FIRE-RESISTANCE RATING OF 1 HOUR) -CORRIDORS (FIRE-RESISTANCE RATING OF 1 HOUR) -STAIRS (FIRE-RESISTANCE RATING OF 2 HOUR) -GUESTROOM SEPARATION (FIRE-RESISTANCE RATING OF 1 HOUR) -SHAFTS (FIRE-RESISTANCE RATING OF 2 HOUR) INCIDENTAL USE AREA: -MECHANICAL AREA (+100 SF = 1 HOUR SEPARATION) -LAUNDRY ROOMS (+100 SF = 1 HOUR SEPARATION) EGRESS COMPONENTS: -STAIRS AT 0.3" PER LOAD OR MIN. OF 44" -OTHER AT 0.2" PER LOAD OR MIN. OF 32" MAXIMUM AREA OF EXTERIOR WALL OPENING: -SECTION 705.8: SEPARATION DISTANCE UNPROTECTED, SPRINKLERED -20' OR GREATER = NO LIMIT FOR ALLOWABLE OPENING MEANS OF EGRESS: -NUMBER OF EXITS: 2 MIN PER FLOOR -TRAVEL DISTANCE: 250’-0”MAX. -DEAD END CORRIDOR: 50’-0” -CORRIDOR WIDTH: 44”MIN. -COMMON PATH OF TRAVEL: 75'-0" ACCESSIBLE ROOMS: -ACCESSIBLE UNITS REQUIRED: 7 -UNITS FOR PERSONS WITH HEARING IMPAIRMENTS (2010 ADA STANDARDS FOR ACCESSIBLE DESIGN): 12 SHEET NO. PROJECT NO. SHEET TITLE: REVISIONS / ISSUES DRAWN BY: PROFESSIONAL SEAL DATE: CHECKED BY: PROJECT: PROJECT ADDRESS COPYRIGHT AND OWNERSHIP OF DOCUMENTS NOTICE CONSULTANTS ARCHITECT OF RECORD: 8400 E. CRESCENT PARKWAY, SUITE 160 GREENWOOD VILLAGE, CO 80111 Tel: 720-881-1600 WWW.101ARCHITECTURE.COM ARCHITECTURE PLANNING INTERIOR DESIGN THIS DRAWING WAS PREPARED FOR A SPECIFIC USE ON A SPECIFIC SITE CONTEMPORANEOUSLY WITH ITS ISSUE DATE AND IT IS NOT TO BE USED ON A DIFFERENT PROJECT. THIS DRAWING IS AN INSTRUMENT OF PROFESSIONAL SERVICE AND IS PROTECTED BY COMMON LAW, STATUTORY AND OTHER RESERVED RIGHTS INCLUDING COPYRIGHT. IT MAY NOT BE REPRODUCED OR USED FOR ANY PURPOSE WITHOUT THE WRITTEN CONSENT OF THE DESIGN PROFESSIONAL©2020 COVER SHEET G-000 21-101A014 01/24/2022 EVERHOME SUITES - BOZEMAN 959 FOWLER AVENUE BOZEMAN, MT 59718 BG FM SITE PLAN PACKAGE EVERHOME SUITES - BOZEMAN SITE PLAN PACKAGE 01/24/2022 959 FOWLER AVENUE BOZEMAN, MT 59718 PSF POUNDS PER SQUARE FOOT PSI POUNDS PER SQUARE INCH PT POST TENSIONED or PORCELAIN TILE PT POINT OF TANGENCY PTD PAPER TOWEL DISPENSER PTDR PAPER TOWEL DISPENSER AND RECEPTACLE PTN PARTITION PTR PAPER TOWEL RECEPTACLE PVC POLYVINYL CHLORIDE PVMT PAVEMENT QT QUARRY TILE QTY QUANTITY (R) REMOVE R RISER RAD RADIUS RB RUBBER BASE RBC RUBBER BASE COVE RBS RUBBER BASE STRAIGHT RBT RUBBER TILE RD ROOF DRAIN or ROAD RE REFER TO or REFERENCE REC RECESS(ED) RECPT RECEPTACLE REF REFRIGERATOR or REFRIGERATED REINF REINFORCED REQD REQUIRED RESIL RESILIENT REV REVISE, REVISED or REVISION(S) RF RESILIENT FLOORING RFG ROOFING RFL REFLECTED RH RIGHT HAND RL RAIN LEADER RM ROOM RO ROUGH OPENING ROD ROOF OVERFLOW DRAIN ROW RIGHT OF WAY RPM REVOLUTIONS PER MINUTE RVS REVERSE (SIDE) RWC RAIN WATER CONDUCTOR S SOUTH or SEALED SC SOLID CORE SCD SEAT COVER DISPENSER SCHED SCHEDULE SD SOAP DISPENSER SEC SECTION SF SQUARE FEET SHT SHEET SHTG SHEATHING SHWR SHOWER SIM SIMILAR SNC SANITARY NAPKIN CABINET SND SANITARY NAPKIN DISPENSER SNR SANITARY NAPKIN RECEPTACLE SOFF SOFFIT SPECS SPECIFICATION(S) SPKL SPRINKLER SPKR SPEAKER SPRT SUPPORT SQ SQUARE SR SINK RECEPTACLE SS STAINLESS STEEL or SOLID SURFACE SSK SERVICE SINK STA STATION STD STANDARD STL STEEL STOR STORAGE STRUCT STRUCTURE or STRUCTURAL SUSP SUSPEND(ED) SYM SYMMETRICAL SYS SYSTEM T TREAD T&B TOP AND BOTTOM T&G TONGUE AND GROOVE TB TOWEL BAR TBC TOP OF BACK OF CURB TELE TELEPHONE TEMP TEMPORARY or TEMPERATURE TG TEMPERED GLASS THERM THERMOSTAT THK THICK or THICKNESS THLD THRESHOLD TO TOP OF TOC TOP OF CONCRETE TOS TOP OF STEEL TOW TOP OF WALL TPD TOILET PAPER DISPENSER TPTN TOILET PARTITION TS TUBE STEEL TV TELEVISION TYP TYPICAL UL UNDERWRITER'S LABORATORY UNFIN UNFINISHED UNO UNLESS NOTED OTHERWISE UOS UNLESS OTHERWISE SPECIFIED UR. URINAL USGS U.S. GEOLOGICAL SURVEY V VOLT VAR VARY or VARIES VB VAPOR BARRIER VCT VINYL COMPOSITION TILE VENT VENTILATION VER VERIFY VERT VERTICAL VEST VESTIBULE VIF VERIFY IN FIELD VIN VINYL or SHEET VINYL VOL VOLUME VTR VENT THROUGH ROOF VWC VINYL WALL COVERING W WEST or WIDE W.O. WHERE OCCURS W/ WITH W/C WATER CLOSET W/O WITHOUT W/R WATER RESISTANT WC WALL COVERING WD WOOD WDO WINDOW WF. WIDE FLANGE or WOOD FLOORING WGL WIRE GLASS WP WATERPROOF(ING) WPT WORKING POINT WSCT WAINSCOT WT WEIGHT WWF WELDED WIRE FABRIC YD YARD FOC FACE OF CONCRETE FOF FACE OF FINISH FOM FACE OF MASONRY FOS FACE OF STUD FR FIRE RESISTIVE or FIRE RATED FRP FIBERGLASS REINFORCED PANEL(ING FRT FIRE RETARDANT TREATED FT FOOT (FEET) FTG FOOTING FURN FURNISH(ED) FURR FURRED or FURRING FUT FUTURE FVC FIRE VALVE CABINET GA GAUGE GALV GALVANIZED GB GRAB BAR GC GENERAL CONTRACTOR GCMU GLAZED CONCRETE MASONRY UNIT(S) GI GALVANIZED IRON GL GLASS or GLAZING GND GROUND GR GRADE GRT GROUT GT GLASS TILE GWB GYPSUM WALLBOARD GYP GYPSUM GYP. BD. GYPSUM BOARD HAS HEADED ANCHOR STUD HB HOSE BIB HC HOLLOW CORE or HANDICAPPED HDAS HEADED DEFORMED ANCHOR STUD HDR HEADER HDWR HARDWARE HM HOLLOW METAL HORIZ HORIZONTAL HR HOUR HT HEIGHT HTR HEATER HVAC HEATING, VENTILATION and AIR CONDITIONING HW HOT WATER HWH HOT WATER HEATER HWY HIGHWAY IBC INTERNATIONAL BUILDING CODE or INSTALLED BY CONTRACTOR ID INSIDE DIAMETER IN INCH(ES) INCAND INCANDESCENT INCL INCLUD(ED) INFO INFORMATION INSUL INSULATION or INSULATED INT INTERIOR INTMED INTERMEDIATE INV INVERT JC JANITOR CLOSET JST JOIST JT JOINT KD KNOCKDOWN KIT KITCHEN KO KNOCKOUT KP KICK PLATE LAB LABORATORY LAM LAMINATE LAV LAVATORY LBL LABEL LDR LEADER LH LEFT HAND LKR LOCKER LLH LONG LEG HORIZONTAL LLV LONG LEG VERTICAL LP LIGHTING PANEL or LIGHT PROOF LT LIGHT LTL LINTEL LVR LOUVER MACH MACHINERY MAG MAGNETIC MAS MASONRY MATL MATERIAL MAX MAXIMUM MB MOISTURE BARRIER MECH MECHANICAL MED MEDIUM MEMB MEMBRANE MEP MECHANICAL, ELECTRICAL and PLUMBING MEZZ MEZZANINE MFR MANUFACTURER MH MANHOLE MIN MINIMUM MIRR MIRROR MISC MISCELLANEOUS MM MILLIMETERS MO MASONRY OPENING MTD MOUNT(ED) MTL METAL MUL MULLION (N) NEW N NORTH NIC NOT IN CONTRACT NO NUMBER NOM NOMINAL NRC NOISE REDUCTION COEFFICIENT NTS NOT TO SCALE OA OVERALL OC ON CENTER OD OUTSIDE DIAMETER OF OUTSIDE FACE OFF OFFICE OH OPPOSITE HAND OPNG OPENING OPP OPPOSITE OTO OUTSIDE-TO-OUTSIDE P PAINT(ED) P/L PROPERTY LINE PAC PREVIOUSLY AWARDED CONTRACT PAR PARALLEL PBO PROVIDED BY OTHERS PC PRECAST PERF PERFORATED PERIM PERIMETER PKG PARKING PL PLATE PLAM PLASTIC LAMINATE PLAS PLASTER PLBG PLUMBING PLYWD PLYWOOD PNL PANEL POL POLISHED PR PAIR or PROPOSAL REQUEST PREFAB PREFABRICATED PREFIN PREFINISHED PRESTR PRESTRESSED PRIM PRIMARY PROJ PROJECT # POUND(S) OR NUMBER & AND < ANGLE @ AT A/V AUDIO/VISUAL AB ANCHOR BOLT ABV ABOVE ACOUS ACCOUSTICAL ACT ACCOUSTICAL CEILING TILE AD AREA DRAIN or ACCESS DOOR ADD ADDENDUM ADJ ADJACENT or ADJUSTABLE AFF ABOVE FINISHED FLOOR AGG AGGREGATE AHU AIR HANDLING UNIT ALT ALTERNATE ALUM ALUMINUM ANOD ANODIZED APPROX APPROXIMATE ARCH ARCHITECTURAL ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS ASPH ASPHALT AUTO AUTOMATIC AVE AVENUE AVG AVERAGE AWP ACOUSTICAL WALL PANEL B BASE B.O. BY OWNER B.O.F. BY OWNER, FUTURE BD BOARD BIT BITUMINOUS BLDG BUILDING BLKG BLOCKING BM BEAM or BENCH MARK BOT BOTTOM BRG BEARNING BSMT BASEMENT C CAULKING C.L. CENTERLINE CAB CABINET CATV CABLE TELEVISION CCD CONSTRUCTION CHANGE DIRECTIVE CCTV CLOSED CIRCUIT TELEVISION CDOT COLORADO DEPARTMENT OF TRANSPORTATION CEM CEMENTITIOUS CFL COUNTERFLASHING CG CORNER GUARD CIP CAST IN PLACE CIRC CIRCUMFERENCE CJ CONTROL JOINT CK CORK TILE CL COLUMN LINE CLG CEILING CLOS CLOSET CLR CLEAR CM CENTIMETERS CMU CONCRETE MASONRY UNIT CO CHANGE ORDER or CLEANOUT COL COLUMN CONC CONCRETE CONF CONFERENCE CONN CONNECTION CONSTR CONSTRUCTION CONT CONTINUOUS CONTR CONTRACTOR CORR CORRIDOR or CORRUGATED CPT CARPET CT CERAMIC TILE CTR COUNTER CU CUBIC CY CUBIC YARD DAMP DAMPROOFING DBL DOUBLE DEG DEGREE DEMO DEMOLISH or DEMOLITION DEPT DEPARTMENT DF DRINKING FOUNTAIN DIA DIAMETER DIAG DIAGONAL DIM DIMENSION DISP DISPENSER DIV DIVISION DN DOWN DR DOOR DS DOWNSPOUT DTL DETAIL DWG DRAWING DWR DRAWER (E) EXISTING E EAST EA EACH EB EXPANSION BOLT ED EXHAUST DUCT EF EXHAUST FAN or EACH FACE EJ EXPANSION JOINT EL ELEVATION ELEC ELECTRICAL ELEV ELEVATOR EMER EMERGENCY ENGR ENGINEER EOS EDGE OF SLAB EQ EQUAL EQUIP EQUIPMENT ES EACH SIDE EST ESTIMATE EW EACH WAY EWC ELECTRIC WATER COOLER EWH ELECTRIC WATER HEATER EXT EXTERIOR F FARENHEIT FA FIRE ALARM FAC FIRE ALARM CABINET FACP FIRE ALARM CONTROL PANEL FBO FURNISHED BY OTHER(S) FD FLOOR DRAIN or FIRE DAMPER FDN FOUNDATION FE FIRE EXTINGUISHER FEC FIRE EXTINGUISHER CABINET FF FINISHED FLOOR FFL FINISHED FLOOR LINE FH FIRE HYDRANT FHC FIRE HOSE CABINET FHMS FLAT HEAD MACHINE SCREW FHV FIRE HOSE VALVE FHWS FLAT HEAD WOOD SCREW FIN FINISH(ED) FIXT FIXTURE FLG FLASHING FLR FLOOR(ING) FLUOR FLUORESCENT TRUE NORTH ABBREVIATIONS GRAPHIC STANDARDS PROJECT TEAM VICINITY MAP DRAWING INDEX GENERAL NOTES BUILDING DESCRIPTION CODE INFORMATION NO. DESCRIPTION DATE GENERAL G-000 COVER SHEET G-001 INDEX & PROJECT INFORMATION G-002 3D VIEWS G-003 COLORED ELEVATIONS G-004 EXTERIOR MATERIALS G-101 BUILDING AREA PLANS G-102 BUILDING AREA PLANS G-200 ADA INTERIOR DETAILS G-210 SIGN TYPES G-401 TYPICAL MOUNTING HEIGHTS G-402 TYPICAL FF&E MOUNTING AS-101 ARCHITECTURAL SITE PLAN ARCHITECTURE A-101 LEVEL 1 FLOOR PLAN A-102 LEVEL 2 FLOOR PLAN A-103 LEVEL 3-4 FLOOR PLAN A-104 ROOF PLAN A-201.a ELEVATIONS - FRONT & REAR A-201.b ELEVATIONS - LEFT & RIGHT A-201.c ENLARGED ELEVATIONS A-301 BUILDING SECTIONS A-302 BUILDING SECTIONS A-511 ACC KING SUITE 1 A-512 ACC KING SUITE 2 A-514 ACC DOUBLE QUEEN SUITE A-516 ACC 1-BEDROOM SUITE A-520 GUESTROOM BATHROOMS A-521 GUESTROOM KITCHENS A-522 PUBLIC SPACE RESTROOM PLANS & ELEVATIONS SC-101 SIGNAGE PLAN SC-201 SIGNAGE ELEVATIONS