HomeMy WebLinkAbout21341 - Planning Comment Response
February 7, 2022
Susana Montana, Senior Planner
City of Bozeman Department of Planning and Community Development
P.O. Box 1230
Bozeman, MT 59771-1230
Re: Bozeman Gateway Site A-The Everhome Building Site Plan
COB#: 21341
MMI#: 3638.009.02
Dear Susana:
This letter is to provide written responses to the comments stated in the DRC review memo dated
September 30, 2021. Below are our responses associated with each comment.
Section 3 – REQUIRED CODE CORRECTIONS
Planning Division, Susana Montana, smontana@bozeman.net, 406-852-2285
1. Project Site
a. This site plan application “Site” shows two buildable lots: (1) a 2.97-acre Lot 1; and (2) a
0.41-ac Lot 2 and three Open Space Lots of The Bozeman Gateway PUD Phase 5
Subdivision Preliminary Plat. It is noted that no development may occur until the Final Plat
is approved and recorded.
Understood. Development will not begin until the Final Plat is approved and recorded.
b. This site plan application details the proposed development of Lot 1, OS-1, OS-1A and OS1-
B, with the development of Lot 2 is labeled “Future Site”. Because Lot 2 is for a later phase
of development of the entire Site, this application must be accompanied by a Master Site
Plan application which must be approved prior to approval of the Lot 1 site Plan per BMC
Section 38.230.020.B. However, if Lot 2 is planned for development within the one year
(and one-year extension with Director approval) that the Lot 1 site plan approval is valid, we
can review the development of Lot 2 within this site plan and a Master Site Plan for both lots
would not be needed. We will need details of the land use and building details for Lot 2 if it
is to be included with the Lot 1 site plan application. If you choose not to include Lot 2
within this application, please submit a Master Plan application per its check list. That
Master Plan application would give basic information about both Lots and their
development. This Lot 1 site plan application, then, would focus on the development
proposed for Lot 2—the hotel and the three open space lots. Please clarify your decision in a
revised narrative submitted with a revised site plan for Lot 1. The Master Plan would need to
be approved before the Lot 1 Site Plan can be approved but they would be reviewed
concurrently. Final approval of those plans would be conditioned on the approval and
recordation of the Final Plat.
We are requesting that we proceed without a master site plan and that Lot 2 be included
with the Lot 1 Site Plan Application. Additional information for Lot 2 is included with this
resubmittal.
c. Many of the exhibits submitted with the current site plan application show Lots 2, OS1,
OS1A and OS 1B. As a condition of the Bozeman Gateway Master Plan and PUD, the Open
Space lots must be developed concurrent with the first phase of this Site. Would the
development of the OS lots be the same Applicant or developer? Those OS lots would be
owned, built, operated and maintained by the Bozeman Gateway property owners
association (POA). Please provide the language in the Bozeman Gateway POA CC&Rs
stating that the open space lots would maintained by the POA.
The development of the OS lots will be developed with the development of Lot 1. The open
space will be maintained per the requirements of the Bozeman Gateway Declaration
(POA).
d. It is noted that the Site contains 0.86-acres of wetlands. Please clearly show the wetlands
area on Lot 1 and label the PUD-mandated 35-foot watercourse setback alignment along that
wetland area.
Wetlands and PUD-mandated 35-foot watercourse setback has been included on the site
plan even though the Corp of Engineers has determined the ditch as non-jurisdictional.
2. Review Standards
a. As you are aware, the Site is zoned B-2, Community Business District and is part of the
Bozeman Gateway PUD, recently amended by the City Commission (Project No. 20051). Per
that approved PUD Modification, this site plan is being reviewed by the current Bozeman
Gateway Development Manual, its recent PUD relaxations, and the Bozeman Municipal
Code (BMC) design and development standards. We note that Section V. Review Procedures.
D.4, City of Bozeman Site Plan Review, of the Bozeman Gateway Development Manual
(BGDM) requires Applicants to submit an approval letter for the project from the Gateway
Review Board (GRB) with the site plan application. The Applicant did not submit such a
letter; please provide one with the revision submittal to demonstrate that the Applicant has
presented the proposed project to the GRB and has received positive feedback from that
group. Moving forward with this proposal without the BGDM approval would be at the
Applicant’s risk of civil litigation by the BGDM and NOT by the City.
An approval letter from the GRB is forthcoming and will be sent to planning when
received.
b. Review Process. The site plan was reviewed by the City’s Development Review Committee
(DRC) on September 22, 2021 and these comments reflect their comments with the exception
of Engineering comments which are presented in a separate Memorandum. Based on these
comments, the application is deemed “inadequate” for further review and public notice.
Understood.
c. Pursuant to the PUD, this project will not be reviewed by the Design Review Board (DRB).
Understood.
d. When the DRC determines that the site plan meets BMC and BGDM design and development
standards and is “adequate” for public notice and comment, a 15-day public notice period will
begin. After public comment, the Director will review the staff report, the DRC comments
and recommendation, and public comment received, and will make an administrative
determination on this project.
Understood.
3. Land Use. The proposed hotel is a principal permitted use in the B-2 zone which the PUD allows as
well.
Understood
4. BMC 38.510.030 (Block Frontage), BMC Table 38.320.050 (Setbacks) and Bozeman Gateway
Development Manual (BGDM) Section V PUD Setback Tables—Phase 5 and Section II PUD Exhibits, F.
Block Frontages. The proposed building location and architectural features do not meet Block Frontage
standards as described below.
a. Site Block Frontages. Section II of the BGDM establishes block frontages subject to the
provisions of the BMC Section 38.510.030. Both the Huffine and Fowler frontages of this
building are designated as “High Visibility Street Corner” Block Frontages (BF). BMC
38.510.020.A states that “high visibility street corner sites” warrant special design treatment;
these standards are described in BMC 38.530.050.C.
We have modified the prototype significantly to promote regionally appropriate
architecture based on human scale with canopies, windows, and a defined base to the
building. We have included durable high-quality materials of stucco and stone, and have
addressed the uniqueness of the site by adding a tower element to the northeast corner of
the building, and material colors typically found within the development. The facades have
been articulated per section 38.530.040 and dimensions have been added to our elevations.
We have enhanced the design to meet the requirements of section 38.510.020 by adding
special design treatments to the areas visible from the corner of Fowler Ave, and Huffine
Ln. including a tower element, entrance vestibule, seating areas, and a fire pit.
Landscaping has also been enhanced along the Huffine frontage. We have addressed
38.530.050 C requirements by accentuating the corner with a tower element and an entry
feature having distinctive façade articulation and detailing.
b. The BMC designates this Site as having a “Gateway” BF along its Huffine frontage and a
“Mixed” BF along its Fowler frontage. For Sites with multiple BF designations, Section
38.510.030.F.2 establishes priorities or precedence of BF designations in which the Gateway
BF takes precedence over any other BF designation. Therefore, the Huffine elevation of the
building must address the design standards of BMC 38.510.030.E and it currently does not.
The Huffine-facing façade does not address the street, it does not have an entrance visible and
directly accessible from the street, and it features blank walls or, rather, a mural that is not
visible from the street. The northeast corner of the building must be brought closer to the
street and the Lot OS-1 property line. Sheet A101 shows the north façade as featuring only
one person-door which leads to a stairwell on the west side of the façade and features a blank
exterior wall or recessed mural with an interior storeroom on the eastern side. It appears to be
a “keyed” door for guests only. This apparently locked person-door facing the street is
connected to a crosswalk and sidewalk which connects to the shared-use path in the abutting
OS-1 lot. That shared-use path connects to the street sidewalk. The connection to the shared-
use path and sidewalk meets the BF standard; however, a locked person-door would not. An
enhanced, public entrance feature is needed to meet this standard.
We have addressed 38.510.030 E by adding an entrance vestibule articulated with a canopy
with a street facing entry to the Huffine elevation. We have also added a tower element
addressing the street and pedestrian connectivity to Huffine. The mural has been changed
to a glass entrance lobby, signifying building entry. We have added windows with
spandrel glazing to address the blank walls on the stair tower facing Huffine. The corner
of the building can not be moved any further to the corner and still allow the required site
circulation and parking required. The pedestrian entrance connected to Huffine has been
changed from a locked person-door to a primary building entrance door. The tower and
lobby meet the enhanced public entrance feature requirement.
c. BMC 38.530.050.C High visibility street corner and Gateway sites. “All development
proposals located at designated high visibility street corners and gateway sites must locate a
building or structure within 20-feet of the street corner and include design features that
accentuate the street corner. Alternatively, the building could be configured with a corner
plaza. Corner design features could include a cropped building corner with an entry feature,
decorative use of building materials at the corner, distinctive façade articulation, a sculptural
architectural element, or other elements that meet the intent of the standards.” Please see
Figure 38.530.050.D for acceptable examples.
The corner of the building has been moved as close as it can to the street corner while still
allowing the required site circulation while meeting the parking requirements. The Tower
element and entry vestibule have been added to address the design feature requirement.
The North elevation/façade of the building does not positively address the Gateway BF or
High Visibility Intersection objectives of providing an attractive landscaped frontage and
architectural treatments along the street-facing façades that accentuate the corner facing this
intersection. The site plan, building elevations and Sheets G002 and 3 do not reveal these
treatments. The stamped sidewalk and blank wall or mural along the north façade does not
adequately meet this objective. Sheet A101 shows the north façade as featuring only one
apparently keyed person-door which leads to a stairwell on the west side of the façade and
features a blank exterior wall or recessed mural with an interior storeroom on the eastern side.
It appears to be a “keyed” door for guests only. Please see Figures 38.530.050.D and F for
examples of proper high visibility building treatments for the north façade.
We have addressed the HIGH VISIBILITY intersection by adding a Tower and an
entrance vestibule articulated with a canopy and a public entry facing Huffine. The art
wall has been removed and replaced with a glass entrance vestibule. Windows with
spandrel glazing have been added to the stair tower to break up the blank walls. Building
elevations and sheets G002 and G003 now show these treatments. Sheet 101 is now a
public entrance door into a large vestibule. An attractive landscape frontage has been
addressed along Huffine, please see revised landscape plan.
d. There is a 50-foot deep Open Space Lot 1 separating the Phase 5, Lot 1 Site from the Huffine
right-of-way (ROW). This OS-1 lot and wetland areas on the northeast corner of the Site
prevents the building from being within 20-feet of the high visibility street corner. However,
moving the building corner closer to the northeast property line of Lot OS-1 and a redesign of
the façade can include design elements and features that accentuate the building’s Huffine
facade and the northeast corner facade. Alternate designs can include accentuated vertical
elements enhancing the corner, an activated corner plaza, an enhanced entry feature,
decorative use of building materials at the corner, distinctive façade articulation, a sculptural
architectural element, or other elements that meet the intent of the standards [38.530.050.C].
Please provide a revised elevation and a narrative describing how you would meet this
standard.
The Huffine façade has been redesigned to include an accentuated vertical element in the
form of a Tower at the corner. The tower becomes the primary focal point viewed from
Huffine. The tower has a unique stone pattern and a sculptural crown at the cornice. The
tower draws your eye to the new 2 story glass vestibule entry feature facing Huffine. The
entrance feature is also accentuated by a canopy, defining building entry. Adjacent to the
entrance vestibule is an outdoor seating area, activating the corner. A revised landscape
plan and building elevations have been provided.
e. As noted above, the Gateway BF requires the building to ‘face” Huffine Lane with an
enhanced public entrance facing the street. Due to the narrowness of the lot along the Huffine
frontage, an alternate design could move the building close to the east side of OS-1, thereby
making the east and longer façade the “front” of the building facing Fowler Avenue. Per the
Gateway BF standards, parking lots should be placed behind the larger orientation of the
building—to the west side of the Site. Please revise the configuration of the building on the
lot to move the east façade closer to the OS-Lot 1 with an entrance feature or some sort of
building embellishment feature facing the corner of Huffine Lane and Fowler Avenue and
architecturally- “announcing” the building to passersby. The parking and vehicular
circulation would be placed to the rear (west) of the building. Please provide details of the
northeast corner facades that positively address these objectives. Please take into account the
proposed landscaping of Lot OS1 to ensure that above or between the plantings, the
accentuated Huffine façade entrance, courtyard and/or architectural features would be visible
from the street corner.
The building footprint has been reconfigured to include a new entrance vestibule and
tower embellishment feature facing the corner of Huffine Lane and Fowler Ave. The
tower has an ornamental crown and signage that architecturally announces the building to
passersby. The elevations and perspectives have been revised to show this design element.
Trees, especially evergreens have been relocated in the OS-Lot 1 to provide better visibility
from the Huffine-Fowler street corner to the accentuated corner entrance. All shrubs and
perennials are low growing (under 3’) to provide visibility of the building.
f. The Fowler frontage is designated a Mixed Block Frontage. Since the building’s “front”
entrance faces Fowler and the OS Lot 1, the BGDM establishes a “front” setback of 10-feet
from the Lot 1 property line to the building façade and a front setback of 5-feet from the
property line to the edge of the parking lot (if a parking lot on the east side of the building is
kept). Please clearly label those dimensions on both the site plan and landscape plan Sheets.
Per the BGDM, the side yard setbacks for the Site are 20-feet each and the rear setback from
the parking lot to the property line is 20-feet; please clearly label those dimensions on both
the site plan and landscape plan Sheets.
Setbacks have been labeled and dimensioned on site plan sheets.
g. The Mixed BF designation of the Fowler frontage requires a 10-foot minimum front setback
from the sidewalk edge. However, due to the separation of the Site Lot 1 from the Fowler
Avenue sidewalk by the 57-plus depth of Lot OS-1, this requirement will be met as measured
from the north/south trail bisecting Lot OS-1. Please label this setback on the site plan and
landscape plan sheets.
This setback has been labeled on the site plan.
h. Table 38.510.030.D, Mixed Block Frontage standards. The Mixed BF requires the ground
floor façade to have at least 25% of the façade covered with windows or clear glass located
between 4- and 8-feet above the ground (grade) and windows must be provided on all
habitable floors of the façade. Vertical species foundation plantings should screen any blank
wall portion of the ground floor and should add visual interest at both the pedestrian and
motorist scale (see also Comments 5.e below).
Ground floor glass calculations have been added to the elevation sheets. In some areas
noted on the elevations, windows with spandrel glass have been added for either privacy,
security, or functionality. Some of these areas include rated stair towers and mechanical
rooms. A foundation landscape bed is provided along the entire east side of the building
with appropriately sized shrub and perennial planting for visual interest.
5. Building Design. BMC 38.530 and BGDM Section IV.
a. 38.530.040.B Façade Articulation. Please label the widths of each façade component
(recessed and projected elements) on Sheets A201, a, b and c and show and describe in the
narrative how the façade includes a minimum of three of the 10 articulation features noted
herein every 60 feet (maximum). Please see the examples in Figure 38.530.040.B.
Widths of façade components, recessed and projected, have been noted with dimensions on
the elevations. We have used a variety of building and massing articulation techniques to
meet the design requirements including 6’-0” building off-sets, windows, entries with
storefront glazing and entrance canopies (weather protection features) changes in roofline
(see elevations for dimensions), vertical change in building material from stucco to stone to
metal panel, the articulation of stucco using varying colors and joints, vertical metal fin
elements, vertical tower element on the corner, building mounted trellis, screen wall with
artwork (still under design to be submitted for Planning review once complete) Vertical
building modulation of parapets of at least 12”. Each façade exceeds the number of
articulation features required.
b. 38.530.040, Building massing and articulation and 38.530.040.E. Maximum façade width.
Please label the façade widths/lengths of each elevation. Please show and describe how the
north and east façades feature at least one of the design options of this subsection to break up
the massing of the building and add visual interest. Please identify/label the 6-feet deep
modulation every 10-feet of length.
We have marked the 6’ building modulation on the elevations.
c. 38.530.050.E and Figure 38.530.040.1. Roofline modulation. Please label the depth of the
change in roof lines over the course of the building length to meet this standard.
We have labeled the depth of the change in roof lines on the elevations.
d. 38.530.050.E and Figure 38.530.050.F. Articulated building entries. The East façade of the
building does not have an entrance facing the street. It has a vestibule with entry doors facing
south to the parking lot. The glass wall of the vestibule, the canopy over this segment of the
façade, the stamped concrete courtyard and foundation landscaping help identify this segment
of the façade as “the entrance” to the building. Please explain why the entrance door does not
face Fowler Avenue which violates the Gateway frontage standard for building entrances
[Table 38.510.030.E, cell 2]. Please label the width of the sidewalk between the parking
spaces and the on-site landscaped courtyard. Please provide a physical glass sample of
glazing used for ground-floor windows.
The doors are on the south side to allow full use of the area inside the vestibule space,
providing guests with more room to enter the hotel with luggage and wheeled carts. The
primary doors to the south alight with the path across the parking lot. Moving the door to
the south helps protect the entry from cold winter winds. The protected canopy extends to
the south to cover the entry doors. The entry canopy extending south, balances the façade
proportions and would not be as aesthetically pleasing if it extended straight out to the east.
The area under the canopy would also be exposed to the cold winter winds if the canopy
extended to the east. By extending the canopy to the south, we have also created an
outdoor protected entry where guests can wait for passenger pick up and drop off. Glass
sample will be delivered for your review once we have received it from the manufacturer.
e. 38.530.070.C. Untreated blank wall treatments. Please label the widths of the east and north
facades with horizontal lengths greater than 15-feet that do not include a transparent window
or door. There are great expanses of the ground-level east façade without these treatments.
An art mural, option 4, as a mitigating treatment must be reviewed and approved by the
Director prior to site plan approval. Please see Figure 38.530.070.C for examples of design
options to avoid blank walls.
We have added windows to eliminate the 15’ blank facades. All elevations are labeled with
dimensions. The artwork on the east side will be submitted for your review once the artist
has completed a preliminary design. The artwork will celebrate the natural environment in
and around Bozeman. The mural screen wall sits out in front of the building façade is an
accent feature for the entry sequence. Behind the mural screen wall is a landscape area
that exceeds the landscape requirements for blank wall treatments. There is also a window
behind the accent wall to the break room. The mural screen wall provides privacy to the
break room. The break room window looks out on to a landscape area.
f. 38.520.070.B. Screening of service equipment. Please label on the elevations the location of
exterior electrical panels and other similar service equipment, if any. Please provide details of
their screening from view from Huffine or Fowler streets or the pedestrian pathways of Lots
OS-1 and OS-2. Mini-splits HVAC elements, if any, must also be screened from view from
public spaces.
All electrical gear will sit inside the electrical room. The gas meter on the southwest stair
will be screened by landscape, RE: landscape plan. A note has been added to the
architectural elevations.
g. If with a reconfiguration of the Site to respond to Block Frontage standards the north fire lane
remains, please indicate on the plan that no parking signs must be posted there along with a
painted red fire lane curb. We expect that with the reconfiguration of the parking lot to the
west side of the building, a hammerhead turnaround would provide egress for a fire engine to
Technology Blvd. West.
Signs have been added to indicate that there is no parking along the painted red fire lane
curb
g. Since the PUD modification sought and was granted a building height exception to allow
85.8-feet height for buildings within the B-2 zone, is there any reason why you are limiting
the building to 4-stories and 48-feet in height? Perhaps a taller building decreases the
footprint to allow more room for circulation.
The prototype from Choice hotels is 4 stories. Based on market and economic analysis the
4-story building is the best solution. The site provides the required circulation and open
space defined in the unified development code. The 85.8 feet height limit allowed us to
create a memorable architectural tower feature at the corner.
6. Parking.
a. As noted above, due to the Gateway BF designation and the narrowness of the Site Lot 1, the
parking and vehicular should be placed west of the building. If for some reason the fire lane
along the Huffine side of the building remains, it should be painted and signed as a fire lane
with no parking allowed.
The fire lane has been noted on C300 and will be painted and signed as “fire lane no
parking” along the curb
b. 38.540.020. Stall, aisle and driveway design. Note that parallel parking spaces are not
permitted within parking lots or garages. You are showing 3 such spaces along the west side
of the building; please remove them.
Understood. These parking spaces have been removed from the site plan.
c. Parking lot lighting must meet the standards of the recently-modified BGDM. Please add a
General Note to Sheet PH-1 stating that the lighting contractor must use fixtures and
luminaires that meet both Bozeman Municipal Code Section 38.570 and the Bozeman
Gateway Design Manual standards.
Understood. The general note has been added to PH-1.
d. Where parking spaces abut internal pedestrian walkways/sidewalks and the sidewalk curb
serves as a wheel stop, an additional 2-feet of sidewalk is required (38.540.020.L).
Understood. All sidewalks around the building are 7 feet. Sidewalks in the parking area are
5 feet in width according to PUD.
e. 38.540.020.M, Snow removal. We are in receipt of the snow storage calculations provided
with the first submittal. However, the area labeled storage area “1” lies outside the property
line of Lot 1 and lies on Lot OS-1. Snow storage for an off-site commercial property is not an
authorized use for open space per the PUD Open Space Master Plan. Please revise the snow
storage calculations without area 1 on Lot OS-1 and revise the snow storage areas on the Site.
A revised snow storage report has been included with this submittal with the snow storage
removed from the open space.
f. Table 38.540.050-3, Parking requirement for hotels. The parking requirement for hotels is 1.1
spaces for each guest room plus 1 space per employee on the maximum shift plus spaces for
restaurant, conference rooms or other public assembly spaces and leasable commercial spaces
such as offices. The first floor office, lounge, meeting room are deemed minor accessory uses
to the hotel use and are not added to the standard parking requirement. The 113-room hotel
would, therefore, require 124 parking spaces plus 1 space per employee. Please provide us
with the number of employees anticipated on the maximum size shift.
The number of anticipated employees is 10 on the maximum size shift which is noted on
the cover sheet. The required parking spaces is 135.
g. The Application narrative indicates that 135 parking spaces would be provided; the Civil
Cover Sheets shows 181 spaces provided; and the Architectural Sheet AS101 shows 175
spaces provided. Please make these numbers consistent throughout. I counted 175 parking
spaces on Lot 1 which is the only lot this site plan is addressing. Parking for the Phase 2 Lot 2
building cannot be shown on this site plan unless you identify the land use of that Lot so we
can calculate the required parking for that use. Also, since that lot is small, most of the excess
parking spaces on the southern portion of Lot 1 cannot be used by the occupant of Lot 2
without a joint use parking agreement approved by the Director.
Lot 1 has a total of 170 parking spaces, and Lot 2 has a total of 5 parking spaces. A joint
use parking agreement is not needed. The PUD provides a non-restrictive access easement
over the entire PUD as stated in the filed Bozeman Gateway Declaration (DOC 2247808).
h. Note that 38.540.050.A.2.b limits parking to 125% of the minimum required number of
spaces. If you want to show parking in excess of that number, you must submit a Master Site
Plan showing the use of Lot 2 and provide a joint use agreement.
We are requesting that we proceed without a master site plan and Lot 2 be included within
this site plan application, A joint use agreement is not needed. The PUD provides a non-
restrictive access easement over the entire PUD as stated in the filed Bozeman Gateway
Declaration (DOC 2247808).
i. For the Master Site Plan for the two buildings, note that for the Huffine (Gateway BF)
frontage, no more than 60% of the street frontage can be devoted to parking.
Understood.
7. Pedestrian circulation.
a. On the Sheet AS101, please label the widths of the sidewalks surrounding the building,
including the widened sidewalk along the east building entrance.
Sidewalk widths have been labeled.
d. Please label the linear feet length of Lot 1’s frontage along Lot OS-1 facing Fowler Avenue
orientation and label its linear feet width along the Lot OS-1 property line along the Huffine
Lane orientation.
These dimensions along Lot OS-1 have been labeled along Fowler Avenue and Huffine
Lane.
e. On Sheet L104 you show the location of the pedestrian crossing on Lot OS-1 connecting to
the building entrance from Fowler Avenue. On a separate sheet, please provide a detail of this
crossing in plan and section showing how it is treated as it crosses the wetlands.
This pedestrian crossing will be standard concrete per civil w/ a culvert underneath. See
sheet L100 and detail 10/L201 for culvert section. Once again, the Corp of Engineers has
determined that the ditch is non-jurisdictional. Therefore no impacts to jurisdictional
wetlands.
f. Please note that the BGDM, Section II.B.3, Walkways, has standards applicable to this
pedestrian crossing.
Noted. See Civil for walkway treatment where walkways cross drives and parking lots.
8. Vehicular Circulation.
a. Technology Boulevard West connects to undeveloped/ agricultural lands to the west. That
land is owned by the Montana State University and the University has a Master Development
Plan for that property. It is expected that it will be developed for University purposes in the
future. Therefore, the east-west drive aisle through Lot 1 should extend to the west property
line to accommodate a future connection to the development on that western land. The Trash
enclosure should be relocated with this site plan to avoid conflicts with a future connection
per 38.520.050.C, Shared Access.
Understood. The trash enclosure has been relocated to the north of this shared access.
b. Please also note that when Lot 2 is proposed for development, a shared access agreement for
the Fowler and Technology West accesses must be recorded.
The PUD provides a non-restrictive access easement over the entire PUD as stated in the
filed Bozeman Gateway Declaration (DOC 2247808) Therefore no access agreement is
needed..
c. The circulation of Lot 2 appears to accommodate a drive-through facility (“drive-in business”
and a “Convenience Use” per Article 7 definitions). These types of facilities are subject to the
design standards of 38.360.110 and 38.520.050.D.3 and 38.540.020.N The current
configuration does not meet these standards.
This parking area has been reconfigured to meet theses standards.
d. Please provide written documentation from the Farmers Canal Company that the changes to
their open irrigation ditch and easements are approved by them. Please begin this process as
soon as possible as it may take some time to work things out.
Written documentation has been included in this submittal.
e. It is expected that Technology Blvd. West will have a 10-foot wide concrete shared use path
on the north or south side of the ROW as part of a major east-west trail through the PUD
community; please work with Engineering and Parks to determine the alignment of that trail.
Noted, the trail has been coordinated with engineering and parks to be located on the north
side of Technology Blvd. West and is part of the Technology West Blvd infrastructure
plans.
9. Commercial Open Space.
a. 38.520.060.C. and D. Pedestrian-oriented open space. Two percent of the land area of the
Site, whether just Lot 1 or both Lots 1 and 2, must be devoted to open space meeting the
standards of these sections. Please see Figure 38.520.060.D-1 for an example of the type of
courtyard open space that meets these standards. Please provide a detail of the courtyard open
spaces shown on the site plan and landscape plan showing the dimensions and square footage
of each of those spaces. Please note that the BGDM has specific design standards for seating,
surface materials, lighting and landscaping of such spaces; please provide a detail sheet of
these elements.
Commercial open space areas are shown on Sheet L100, see Sheet L101 for enlargements
of these areas with more detail. A combination of plazas at the building entries and a plaza
in the open space have been provided to meet this square footage requirement. A variety of
pedestrian seating elements as well as fire pits and landscape beds accentuate these areas.
Site furnishings provided follow the design standards from the BGDM as well as hardscape
treatments. Overall dimensions of these areas are shown on Sheet L101.
10. Landscaping.
a. Pursuant to conditions of approval of the PUD, the OS1, OS-1A and OS-1B lots will be
developed and landscaped concurrent with development of Lot 1 of this site plan. Please
describe how you would reestablish the wetlands upon development of the OS lots.
All wetland and native seeding will be applied by either Hydroseeding with tackifer or drill
seed application (see plan for seeding rates), broadcast seeding is not permitted. Seeding of
these areas shall take place immediately prior to period of maximum precipitation and
after planting of tree and shrub species. All native/wetland seeded areas shall have an
above ground temporary irrigation system installed for the first full growing season to
ensure seed establishment. The seeding area zones shall be tied to the master irrigation
controller and monitored for proper application; spray heads shall be mounted on stakes a
minimum of 18” above grade. Temporary irrigation system may be removed after one full
growing season or 80% seed establishment. A weed maintenance program shall be
implemented for the first two growing seasons to minimize competition with the
native/wetland seed establishment and growth. All trees and shrubs in the native or
wetland areas shall be drip irrigated and mulched and protected from wildlife to assist with
long term plant health. Existing vegetation in all wetland or native areas shall be disturbed
as minimally as possible and protected outside of disturbed areas shown.
b. It is our expectation that the developer of Lot 1 will make all the improvements to Lots OS-1,
OS-1A and the Bozeman Gateway property owners association will maintain them.
This is correct as well as OS-1B.
c. 38.550.050.A. The north and side setbacks must be landscaped; please show this on the
landscape plans for Lot 1.
Noted, this item has been resolved w/ the revised orientation of the building and parking
lot.
d. 38.550.050.C. 2.b, c and e, Parking lot landscaping. With the relocation and redesign of the
parking lot for the hotel, please ensure that the tree types of subsection 2.b are shown on the
plan. Please ensure that a tree lies within 70-linear feet of each parking space. It appears that
the northeast parking row does not meet this standard. Please show the dimensions of the
parking lot islands per subsection 2.E; this may be done with one detail drawing.
Resolved, with reorientation of parking lot. A tree in tree grate has been provided near the
front entry and an additional tree at the southeast parking area to help satisfy this
requirement. See Civil Sheet C300 for parking lot island dimensions.
e. 38.550.050.B, Drought-tolerant species. The plan exceeds the required 75% drought-tolerant
species; thank you.
Understood
f. 38.520.040.D.3, Foundation plantings. It appears that there are sections along the east side
façade and the northwestern façade that omit the required 3-feet depth of foundation plantings
separating the building from the pedestrian walkway; please explain this deficiency or
mitigation or make the correction.
Noted, this item has been resolved w/ the revised orientation of the building and parking
lot. Foundation beds are shown along the entire east façade of the building.
j. Lighting. As noted above in Comment 6.c, please confirm that the lighting plan and fixtures
meet both the BGDM and BMC standards and guidelines. Please add a General Note to Sheet
PH-1 stating that the lighting contractor must use fixtures and luminaires that meet both
Bozeman Municipal Code Section 38.570 and the Bozeman Gateway Design Manual
standards.
Understood. The general note has been added to PH-1.
Associate Planner; Sarah Rosenberg, srosenberg@bozeman.net
· This is encompassed in Code Provision number 8 and 9 as open space is a requirement per their
PUD and subdivision standards. Since it is shown on the plat, it is required to be built as part of it.
The PUD is their master plan and with the initial adoption, the improvements that are part of the
master plan have to be done with their subdivision.
Open space 1B has been included.
Building Division; Ben Abbey, babbey@bozeman.net
My comments as follows:
· The drawings are calling for the Accessible code as the 2017 ICC A117.1 the state of Montana
has not adopted this code yet. The Current adopted code is the 2009 ICC A117.1
· Please provide enlarge drawings for Accessible units and public bathroom at submittal, signage,
reaches, and clearances, etc.
We have corrected the accessible code as the 2009 ICC A117.1 on the drawings. We have
provided enlarged drawings for Accessible units and public bathrooms. We have added sheets
to describe signage, reaches, and clearances, etc.
Solid Waste Devision; Russ Ward, rward@bozeman.net
· Refuse enclosure doors must open a minimum of 180 degrees.
· Refuse enclosure will need to be covered
Refuse enclosure doors will open 180 degrees. Bollards restricting the movement have been
removed. The refuse enclosure has been redesigned to include a cover. See elevation sheets
for design.
NorthWestern Energy; Eric Schon, eric.schon@contractor.northwestern.com
· There is an existing three phase junction can and 2” gas main midway north of the intersection of
Fowler Ave & Technology Blvd West on the east side of Fowler Ave from which gas & electric
power can be extended from. This would require a bore under Fowler Ave which would allow a
junction can be placed and a gas stub at a point on the west side of Fowler Ave from which
electric and gas could be extended to provide power and gas to the future building, shown on the
site plan. Both gas and electric could be extended along the west side of Fowler Ave to the
northwest corner of Fowler Ave & Technology Blvd West where a junction could be installed.
Then gas & electric could be extended along the south side of the site as shown on the Civil Site
Plan to the proposed transformer location. This is a suggestion and the NWE project engineer will
need to determine the best location for the extension of these utilities.
The gas & electric is extended along the south side of the site and the proposed transformer is
located along the western boundary.
· Utility extension & utility easements. Any extension of gas main or electric primary will need to
be installed within an easement. A minimum of a 10-foot easement is required. To establish the
needed internal utility easement locations the NWE project engineer will help to establish these
locations. If an easement shall need to cross property other than the applicants, negotiations and
costs between other landowners for such easements is entirely the applicant’s responsibility.
Understood.
· Transformer location to a structure. If the buildings will be requiring 3 phase power a transformer
pad site should be planned. Typical 3-phase pad is going to be a 7’x7’ pad. For oil filled
transformers a 2-foot clearance is required to non-combustible walls and surfaces that do not have
any openings such as doors, windows, air intake, and fire escapes routes and meets current NEC
or NFPA requirements for non-combustible material. For transformers 750kVA & larger a 3-foot
6-inch clearance is required and 10- feet of clearance is required on the front side of the pad,
where the transformer doors are located. For any combustible surface, not meeting current NEC
or NFPA requirements for non-combustible material, a minimum of a 10-foot clearance is
required between the building or any combustible surface and the transformer. As shown on the
Overall Utility Plan, the transformer will meet or exceed the 10-ft requirement. All distances are
referenced to the edge of the pad. For planting of bushes or shrubs a Minimum Working Space
for a Pad-Mounted Transformer, is 4-feet on the sides and back portion of the concrete pad and
10-feet of clearance on the front side of the pad where the transformer doors are located. Note, all
distances are referenced to the edge of the pad. Due to COVID-19 there has been an impact on
receiving larger three phase and single phase transformers and a longer timeline may be needed to
receive the needed equipment for such services. It is important to submit an application to NWE
and provide the calculated loads as soon as possible to avoid any delays. The NWE project
engineer will help to determine the appropriate location for the transformer.
Understood
· Service & Meter Location. The electric meter & or CT cabinet will need to be installed in the
same general location within 10-feet of the gas meter. NorthWestern Energy reserves the right to
specify the location of our meters. All meters are to be located outdoors on the corner or in a
location on the building closest to the transformer or secondary junction can serving the building
unit. Meter locations will need to be approved by NWE. NWE policy is to maintain a minimum
30-inches wide by 3-feet clear zone between the front of the meter and landscape screening or
wall screening for self-contained meter bases and 48-inches for installations requiring cabinets.
When using a screening wall most commercial applications require the 48-inch clear zone
between the front of the meter and the wall. For this project the 48-inch clear zone, between the
front of the meter and the wall, will apply due to the past history of meter panel installations for
this type of commercial service. Location of the meter(s) shall allow easy access to the meters for
operation and maintenance. This can be determined through the design process after an
application is submitted through NWE and the area project engineer will work through allowable
shrubs and plants for screening and to determine adequate clearances for access to our meters.
Noted, See Sheet L103 for landscape screening
· The following applies to the gas regulator. The gas regulator cannot be placed under a window or
within 3’ of the operable portion of the window. It can be placed under a window/deck on the
second story, provided the “open/operable” portion has at least 6’ of clearance from the regulator.
Ensure that there is 10’ of separation from any mechanical air intake, including air conditioning
units. The regulator will need to be 3’ from the closest corner of any portion of the electric meter
base. Submitting an application to NWE will get the NWE engineer involved and can help with
this process.
Understood – see location of gas regulator in architectural elevations.
· Meter Screening Walls.
o Gas service cannot penetrate foundation walls that are attached to the building foundation
per the International Fuel Code. Gas riser need to penetrate the building above ground.
However, if the foundation is not attached to the building (i.e. the foundation wall is
isolated from the building for just supporting the wall this is acceptable.
o If this is a free standing foundation wall, a knock-out must be provided that is a min of
2’x2’ but may be required that the knockout be larger on the electric service depending
on the meter base amperage. Consult NWE for proper sizing of knock-out
o Contact NWE for placement of knock-out to insure that it lines up properly with the
termination location to prevent bends in the service
o Screening must meet the clear zone requirement of NWE Electric Service Requirements
which typically for commercial application is 48” from the face of the electric meter.
o Gas meter cannot be located in recessed location where it is not open atmosphere above
the meter without approval from NWE.
o Screening cannot consist of rolling doors or other devices that are required to be open to
access the meters.
Gas meter has been located on the east elevation fitness room wall, and meets all the
requirements above. (see elevation) The gas riser will penetrate the building above ground.
The electric meter is located within 10’ of the gas meter.
· For landscaping. No large deep rooted trees or bushes will be allowed within the 10-foot utility
easement. All other approved landscaping will be placed so as not to damage, prevent or hinder
operation and maintenance of NWE utilities.
Noted, no trees or deep rooted shrubs are within the 10 ft utility easements.
· For landscaping, planting of bushes or shrubs a Minimum Working Space for a Pad- Mounted
Transformer is 4-feet on the sides and back portion of the concrete pad and 10-feet of clearance
on the front side of the pad where the transformer doors are located. Note, all distances are
referenced to the edge of the pad.
Noted, clearances have been implemented around the transformer.
· Submit an application online to have the NWE project engineer work with the applicant. Go to
www.northwesternenergy.com/construction to apply online Montana Construction Application,
and access Montana New Service Guide to provide information on electric and gas service
requirements. Once an application is submitted the NWE project engineer will be in contact with
the applicant. Electrical and gas loads will be required for the NWE engineer to size the services
needed.
If you should have any questions regarding these comments, revisions and corrections for the Phase 4
Apartments Site Plan Application Resubmittal don’t hesitate to contact me.
Sincerely,
_____________________________
James A. Ullman, PE
Project Engineer