HomeMy WebLinkAbout20138 - Engineering Comments - Response MEMORANDUM ------------------------------------------------------------------------------------------------------------ TO: Sarah Rosenberg, Planner II FROM: Anna Russell, Engineer II RE: Bozeman Gateway Site A Concept Review Application No. 20138 DATE: June 10, 2020 ----------------------------------------------------------------------------------------------------------- Engineering Comments Transportation 1. BMC 38.400.080. The sidewalk needs to be installed per the standard street section, where possible. The pedestrian crossing on the proposed access of Fowler needs to be located at the ROW and cross at the intersection. One possible alignment for the sidewalk is shown in red below. The site plan has been revised to show this sidewalk alignment. Wastewater 2. Engineering recommends the sewer service line tie into the existing sewer manhole on Fowler. Understood Water 3. DSSP V.D. The water main in Technology Boulevard W must be extended to the edge of the western roadway boundary. Understood 4. The applicant is advised to review the attached water line lay lengths exhibits to ensure the mechanical rooms are large enough to install the water service per the City standard. Understood. The water line lay lengths as well as mechanical room size are shown in the utility plan. Easements 5. 38.410.060 Easements. A 10 foot utility easement will be required for the electrical line from Technology Boulevard West to a new transformer. Coordinate with Northwestern Energy on transformer location (at least 10 feet from the building). Understood 6. A public access easement is required for the proposed sidewalk outside the right-of-way on the west side of Fowler Ave. Understood