Loading...
HomeMy WebLinkAbout005 Griffin Correspondance1 Celine Saucier From:Celine Saucier Sent:Wednesday, March 23, 2022 4:09 PM To:Griffin Nielsen Cc:James (Jim) A. Ullman Subject:CILWR Bozeman Gateway Site A - Everhome Hotel (#20138) Attachments:DNRC Water Rights Inquiry.pdf; L105 Overall Open Space Landscape Plan-Bozeman Everhome_ 22-02-07.pdf; Site A_C300 Overall Site Plan 2022-02-07.pdf; Site A_C301 Overall Site Plan 2022-02-07.pdf Griffin – Just wanted to follow up with you on this CILWR for Everhome and see if you’ve had a chance to put together a cost for this and if there’s anything else you need on our end. Thank you, Celine Saucier, PE Civil Engineer, Morrison-Maierle +14069226822 From: Celine Saucier Sent: Sunday, March 13, 2022 9:23 AM To: Griffin Nielsen <GNielsen@BOZEMAN.NET> Subject: RE: CILWR Bozeman Gateway Site A - Everhome Hotel (#20138) Griffin – We received the predetermination from the DNRC to remove the irrigation demand from the CILWR fee determination (attached). From your previous email, we will go with Option 2 for the CILWR and we will defer until site plan: Final Plat Phase 5: - Irrigation demand for Phase 5 Open Space (see L105): 68,453 Gallons per Month - Source (see C300&C301 attached): GWIC ID 231832 (irrigation to Lot 1) and new well in Open Space 1A to provide irrigation to open space and Lot 2 Site A Hotel: - Four Story, 113 rooms - The hotel does not have a pool or restaurant Let me know if you need any additional information, thanks! Celine Saucier, PE Civil Engineer, Morrison-Maierle +14069226822 From: Griffin Nielsen <GNielsen@BOZEMAN.NET> Sent: Thursday, January 6, 2022 11:07 AM To: Celine Saucier <csaucier@m-m.net> Subject: RE: CILWR Bozeman Gateway Site A - Everhome Hotel (#20138) 2 ***This message originated from an External Source.*** Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. Hi Celine, We can approach the CILWR determination for these projects in two ways. Opt 1 we can perform the determination for the subdivision including the hotel and restaurant on Lots 1 and 2 with the final plat. Opt 2 the CILWR for Lots 1 and 2 is deferred until site plan and we only look at the open space irrigation demand with the final plat. The benefit of opt 1 is it locks in the volume of water credited to the lots in case the City’s CILWR fee increase. For the Phase 5 final plat I’ll need the irrigation demand from the landscape architect for the open space and details on the supply source. If an exempt well is proposed I’ll need a the predetermination from the DNRC as with Phase 4 and plans showing the well location and pump details. For the hotel looking back at the concept application it sounds like the scale of the project has been reduced (6-floors to 4). Can you provide the number of rooms, a description of any amenities in the hotel (pool, bar, restaurant, etc.) and their approximant size (SF)? Let me know if you have any questions. Thanks, City of Bozeman MT Griffin Nielsen, PE| Engineering Department 406.582.2280 gnielsen@bozeman.net From: Celine Saucier <csaucier@m-m.net> Sent: Thursday, December 30, 2021 1:48 PM To: Griffin Nielsen <GNielsen@BOZEMAN.NET> Subject: FW: CILWR Bozeman Gateway Site A - Everhome Hotel (#20138) CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Griffin – Just wanted to follow up with this CILWR request as we are looking to submit the final Plat for Phase 5 of the Bozeman Gateway which will include the proposed 4-floor Everhome Hotel and a future small restaurant in Lot 2. Let me know if you need any additional information to help you with this, thanks - Celine Saucier, PE Civil Engineer, Morrison-Maierle +14069226822 From: Celine Saucier Sent: Thursday, August 12, 2021 7:06 AM 3 To: Griffin Nielsen <GNielsen@BOZEMAN.NET> Subject: CILWR Bozeman Gateway Site A - Everhome Hotel (#20138) Griffin – I’m working on the Bozeman Gateway Site A Everhome Hotel Site Plan Application (#20138). We were advised to contact you per the site plan checklist in regards to the CILWR. The proposed Everhome (attached) will consist of a 4 floor hotel with an approximate gross floor area of 62,108SF. Was hoping you can provided a CIL number based on this information. Let me know if there is anything additional I can provide for you to determine the CILWR number, thanks! Celine Saucier, PE Civil Engineer, Morrison-Maierle +14069226822 2880 Technology Blvd W, Bozeman, MT 59718