HomeMy WebLinkAbout06-02-22 Midtown Urban Renewal Board Agenda & Packet MaterialsA.Call meeting to order at 4:30
Via Webex:
https://cityofbozeman.webex.com/cityofbozeman/onstage/g.php?MTID=e94850cc2782a1631e4c8ee5c761c9839
Click the Register link, enter the required information, and click submit.
Click Join Now to enter the meeting
Via Phone:
This is for listening only if you cannot watch the stream or channel 190
• Call-in toll number (US/Canada): 1-650-479-3208
• Access code: 2558 627 0613
B.Disclosures
C.Changes to the Agenda
D.Public Comment
Please state your name and address in an audible tone of voice for the record. This is the time for
individuals to comment on matters falling within the purview of the Committee. There will also be
an opportunity in conjunction with each action item for comments pertaining to that item. Please
limit your comments to three minutes.
E.Action Items
E.1 FY2023 Midtown Work Plan and Budget(Fine)
F.FYI/Discussion
G.Adjournment
THE MIDTOWN URBAN RENEWAL BOARD OF BOZEMAN, MONTANA
MURB AGENDA
Thursday, June 2, 2022
For more information please contact David Fine (dfine@bozeman.net)
This board generally meets the 1st Thursday of the month from 4:30pm to 6:30pm
Committee meetings are open to all members of the public. If you have a disability and require
assistance, please contact our ADA coordinator, Mike Gray at 582-3232 (TDD 582-2301).
In order for this Board to receive all relevant public comment in time for this meeting, please submit via
the Commission Comment Page or by emailing agenda@bozeman.net no later than 12:00 PM on the
day of the meeting. Public comment may be made in person at the meeting as well.
1
Memorandum
REPORT TO:Midtown Urban Renewal Board
FROM:David Fine, Economic Development Program Manager
SUBJECT:FY2023 Midtown Work Plan and Budget
MEETING DATE:June 2, 2022
AGENDA ITEM TYPE:Citizen Advisory Board/Commission
RECOMMENDATION:I move to approve FY2023 Midtown Work Plan and Budget
STRATEGIC PLAN:2.2 Infrastructure Investments: Strategically invest in infrastructure as a
mechanism to encourage economic development.
BACKGROUND:The Midtown Urban Renewal Board provided recommendations to staff
regarding their work plan and budget priorities at their regularly scheduled
April 7, 2022 meeting. The proposed work plan and budget represents staff's
best attempt to capture these priorities. The goal of this action item is to
vote on a Board recommended work plan and budget for Fiscal Year 2023 to
be shared with the City Commission at their June 14, 2022 meeting.
UNRESOLVED ISSUES:None at this time.
ALTERNATIVES:As suggested by the Board.
FISCAL EFFECTS:The proposed Work Plan and Budget for Fiscal Year 2023 includes
$4,489,541 in requested appropriations from the Midtown Urban Renewal
District tax increment fund.
Attachments:
Midtown Budget FY 2023 draft.pdf
Fiscal Year 2023 Midtown Work Plan and Budget and Annual
Report draft 2.docx
Report compiled on: May 27, 2022
2
Bozeman Midtown Urban Renewal Board Fiscal Year 2023 Work Plan and Budget
Revenue and Reserves
Undesignated Fund Balance $3,026,064
Estimated FY22 Ending Balance $448,000
Estimated FY23 Revenue $1,076,082
Total Cash and Reserves $4,550,146
Infrastructure Investments
Westlake BMX Park Improvements $293,641
Codify Design Standards for N. 7th Avenue Streetscape $50,000
5th Ave Trail $191,000
Festival Street Lighting extensions, fabrication and installation $100,000
Bond Repayment
Series 2020 $410,000
Professional Services and Outside Legal Counsel
Outside Legal Counsel for Bonding and Redevelopment Agreements $60,000
Contracted Professional Services $60,000
Redevelopment Incentive Programs
Technical Assistance Grants 1:1 match [2 grants]$15,000
Direct Incentives - Midtown TIF Assistance Program $100,000
City Fiber Conduit Connection Incentive Program $20,000
Outreach and Marketing
Outreach Engagement and Mailing $10,000
Midtown Marketing and Recruitment $10,000
District Operations
Payroll $97,900
Training $12,000
General Administrative Costs $20,000
Approved Grants and Direct Incentives
Workforce Housing Project (9TEN)$3,000,000
El Mercadito $40,000
TOTAL EXPENDITURES $4,489,541
Year End Balance $60,605
3
Bozeman Midtown Urban Renewal District
An Urban Renewal District with a Tax Increment Financing (TIF) Program
Midtown Urban Renewal Board Annual Work Plan and Budget FY2023 Page 1 of 9
MIDTOWN URBAN RENEWAL DISTRICT
FY2022 ANNUAL REPORT
and
FY2023 WORK PLAN AND BUDGET
The City Commission passed Ordinance No. 1685, “Adopting an Urban Renewal
Plan for the North Seventh Avenue Corridor and Adjacent Properties”, on November 27,
2006. On December 16, 2015, the City Commission passed Ordinance No. 1925, which
adopted a new urban renewal plan, expanded the boundaries of the original district, and
renamed the North Seventh Urban Renewal District the Bozeman Midtown Urban Renewal
District.
The 2015 Midtown Urban Renewal Plan provides for the remediation of blighted
conditions within the urban renewal area by advancing five broad goals through a series of
implementing activities and strategies. The five goals include the following items:
1. Promote Economic Development
Rationale: Economic vitality strengthens the community, provides for physical
needs of the citizens, opens reinvestment opportunities, and helps to
eliminate the conditions that contribute to blight.
2. Improve Multimodal Transportation
Rationale: Increasing travel options supports public health, reduces resource
demand, increases efficiency and reduces costs, improving the quality of life
and making the community a better place to live and work, helping to
eliminate conditions that contribute to blight.
3. Improve, Maintain and Support Innovation Infrastructure
Rationale: Infrastructure is the backbone of the community. Private
development typically requires a corresponding public investment in
infrastructure. Therefore, capital improvements in the district will help achieve
economic vitality and address conditions that contribute to blight.
4. Promote Unified, Human Scale Urban Design
Rationale: Protecting and building upon existing physical assets increases
vitality, desirability and leverages economic development, strengthening
community values and mutual support helping to eliminate the conditions that
contribute to blight.
5. Support Compatible Urban Density Mixed Land Uses
Rationale: A sense of place is strengthened by a strong core identity.
Increasing live-work opportunities and community interaction, ensures that
the North 7th Avenue area remains a great place to live, work, operate a
business, and play, and helps to eliminate conditions that contribute to blight.
4
Bozeman Midtown Urban Renewal District
An Urban Renewal District with a Tax Increment Financing (TIF) Program
Midtown Urban Renewal Board Annual Work Plan and Budget FY2023 Page 2 of 9
The City Commission approved the Midtown Action Plan in 2017, which charted a
new direction in pairing infrastructure spending and blight remediation with proposed private
investment. The intent of the Action Plan is to, “attract targeted private investment by
leveraging the market potential of the Midtown District and removing barriers to
redevelopment through strategic infrastructure investments and incentives.” The Annual
Report and the recommended Work Plan and Budget reflect this specific strategy and
approach to using private investment to propel blight remediation and urban renewal.
The Midtown Action Plan proposes targeting future development that includes the
following elements:
Infill.The intent of urban renewal is to remove blight to improve an area for the
entire community benefit. Remodeling of existing structures or infill of
underutilized lots is the priority of this Plan. As discussed, infill development is
more challenging than vacant greenfield development and warrants focused
investment of staff time and resources.
Increased building density.Increased building density increases the number
of people in the District, which helps create the desired active pedestrian
environment. More density of buildings grouped together in districts is
especially desired to encourage pedestrians to explore adjacent buildings.
Buildings that are separated by large parking area or vacant lots will impede
pedestrian movement.
Encourages multimodal transportation.New projects should provide
amenities such as adequate bike parking or bus schedule real time monitors in
lobbies. At the same time, the Urban Renewal District should invest in
infrastructure projects such as bike lanes and signals or covered bus stops to
make alternative transportation options visible, safe, and desirable.
Retail that serves surrounding residents.To achieve a more vibrant
pedestrian-oriented environment the District must consist of uses that are a
frequent destination by residents. Retail amenities that are experience based
such as restaurants or ice creams shops are desired because they generate
activity and are more resilient to emerging ecommerce trends. Such amenities
will also attract more housing investment.
Housing.Bozeman is in significant need of all types of housing, therefore it is
called out as a specific use that is desired. The Midtown District zoning is
intended to accommodate more dense housing projects with potential access
to retail amenities nearby.
The City Commission funded a package of several major infrastructure improvements
in the District through the approval of $6,500,000 in bonds with a 25 year term on July 6,
2020. The infrastructure improvements include the streetscape infrastructure on N. 7th Ave.
that enhances the walkability, aesthetics, and investment potential of the District as a whole,
along with improvements to Aspen St. and N. 5th Ave. that will accelerate ongoing private
investment in this emerging node of commercial activity.
The District is also focused on investing in public infrastructure that removes barriers
to specific private investments. These incentives primarily pay for the costs of public
infrastructure associated with the private projects, as well as demolition costs and the cost of
5
Bozeman Midtown Urban Renewal District
An Urban Renewal District with a Tax Increment Financing (TIF) Program
Midtown Urban Renewal Board Annual Work Plan and Budget FY2023 Page 3 of 9
various system development charges, such as impact fees. These early investments in
projects will create new incremental taxable value that will allow for greater blight remediation
throughout the District in the coming years. Over time, these increases in taxable value will
benefit the broader community by increasing the overall tax base through productive infill
development.
The remediation of blighted conditions in the District and its ongoing redevelopment
will take many years. Bozeman has 23 more years to focus on redevelopment of the Midtown
area. As instructed by Commission adopted policy documents, the District will continue to
focus on remediating blight, by attracting targeted private investment and growing the tax
base.
6
Bozeman Midtown Urban Renewal District
An Urban Renewal District with a Tax Increment Financing (TIF) Program
Midtown Urban Renewal Board Annual Work Plan and Budget FY2023 Page 4 of 9
Midtown Urban Renewal District (MURD)
FY2022 Annual Report (July 1, 2021 to June 30, 2022)
Highlights of investments over $15,000 are documented below.
Series 2020 Bond Payment $410,000
The City Commission approved the first series of bonds for the district for $6,500,000.
The proceeds of the bonds were to pay for the N. 7th Ave. Streetscape Project and the Aspen
and 5th Improvements Project. The term of the bonds is 25 years.
Midtown Infrastructure Improvements Urban Renewal Project $358,917
The Midtown Infrastructure Improvements Project includes several sets of public
infrastructure improvements throughout the District. Expenditures on this project in Fiscal
Year 2022 included completion of the N. 7th Streetscape Project between Durston Rd. and
Mendenhall St. and the reconstruction of Short St., adjacent to the ELM event center to
address stormwater, and ADA issues. In addition, this project included upgrades to the
streetscape along N. 7th Ave., adjacent to the Ruh Building to ensure the streetscape matched
the style of the recently installed elements.
The Ruh Building (encumbered from FY21)$ 747,500
The Ruh Building is proposed as a 34,066 SF, 3-story, mixed-use building with
restaurant/retail uses on the ground floor and 16 residential units on the upper floors. The
project is located at the northwest corner of N. 7th Ave. and Durston Rd. The City Commission
approved the project as an urban renewal project pursuant to Resolution 4991 following a
public hearing at its February 11, 2019 meeting. The project represents a $6,676,667
investment in the District.
The Ruh Building Streetscape $ 103,737
The Board recommends approval of a forthcoming amendment to the existing grant
agreement for The Ruh Building. At staff’s urging, the Developer modified their site plan to
make sure the streetscape elements matched those on the remainder of the corridor. In
addition the Montana Department of Transportation (MDT) is widening the intersection of N.
7th Ave and Durston Rd. and the new design is configured to be able to remain in place with
the widening project.
Aspen Crossing (encumbered from FY21)$ 849,959
Aspen Crossing is a 65,000 square foot, 3-story, mixed-use building with
restaurant/retail uses on the ground floor, second floor offices, and 25 residential units on
the upper floor. The project represents at least a $13,029,045 in the District.
Zambon Building (encumbered from FY21) $ 45,000
The project represents a $2,941,000 investment in the District and approximately
10,000 SF of commercial space. Staff expects this item will be requested for payment before
the end of FY 2022, but may also occur in early 2023.
7
Bozeman Midtown Urban Renewal District
An Urban Renewal District with a Tax Increment Financing (TIF) Program
Midtown Urban Renewal Board Annual Work Plan and Budget FY2023 Page 5 of 9
West Peach Condos (encumbered from FY21) $ 256,355
The West Peach Condos project is comprised of 17 two bedroom, one office, three
bathroom, and two car garage, townhouse-style condominium units. The project is located at
the northwest corner of N. 3rd Ave. and W. Peach St. The City Commission approved the
project as an urban renewal project pursuant to Resolution 5046 following a public hearing at
its May 20, 2019 meeting. The project represents a $7,656,246 investment in the District.
El Mercadito $40,000
Through adaptive reuse of an existing vacant structure at 511 W. Mendenhall St., El
Mercadito proposes renovations to the interior of the building, to the exterior façade, the
addition of landscaping, outdoor seating, and electrical utility upgrades. The building will
house a Hispanic food market and fast-casual dining space and second location for El
Mercadito LLC., whose business in Four Corners has grown and is expected to continue to
thrive in a more urban, pedestrian-oriented location. The grant funds three blocks of
neighborhood electrical infrastructure upgrades that were necessary to allow for a
commercial kitchen in this commercially-zoned location. Staff expects this project could
receive reimbursement this fiscal year, but the project could extend into FY 2023.
Westlake Park Improvements $39,359
The Parks Department oversaw completion of a new start gate and associated
concrete work for the BMX track at the park. The new gate is expected to reduce noise and
increase safety for races. Relocation and reconstruction of the mountain bike course is
expected to be completed in FY 2023.
Streetscape Operations and Maintenance Manual $8,000
The new streetscape will require regular maintenance. This item would allow the
designer to create a manual to make sure long-term care and maintenance of the recently
installed facilities is properly documented.
Expenditures Compiled May 16, 2022
8
Bozeman Midtown Urban Renewal District
An Urban Renewal District with a Tax Increment Financing (TIF) Program
Midtown Urban Renewal Board Annual Work Plan and Budget FY2023 Page 6 of 9
Midtown Urban Renewal District (MURD)
FY2023 Work Plan (July 1, 2022 to June 30, 2023)
Midtown Infrastructure Improvements
Westlake Park Improvements $318,641
The District paid to add back-in angle parking to serve as parking for Westlake Park
as part of last year’s improvements to N. 5th Ave. The project significantly impacted the
mountain bike facilities manage by Southwest Montana Mountain Bike Association
(SWMMBA). A recently update park master plan calls for relocating the mountain bike
facilities and building an entrance plaza near the intersection of N. 5th Ave. and the recently
complete Aspen Festival Street. The improvements would also include a new, quiet electric
start gate for the BMX course, which will allow for much quieter operations and an improved
racing experience. The District spent $39,359 on BMX track related elements of this project
in FY 2022.
Codify Design Standards for N. 7th Ave. Streetscape $50,000
Recent improvements to the N. 7th Ave. streetscape are not currently required for
redevelopment projects on the corridor. In order to protect the public investments already
made and to ensure design continuity for the corridor, codifying the streetscape design is
necessary for the future development of the corridor. This project is continuing FY 2023.
N. 5th Ave. Multi-Use Path $200,000
Staff obtained an easement to install a 10ft paved multi-use path along the N. 5th Ave.
right-of-way to connect the path on Oak St. to Westlake Park and to provide bike and
pedestrian connectivity where N. 5th Ave. does not currently exist.
Festival Street Lighting extensions $ 100,000
This project adapts the recently installed light poles and string lights on W. Aspen St.
to make them compliant with the National Electrical Code and “Night Skies” ordinance.
Bond Repayment
Series 2020 $ 410,000
The City Commission approved the Series 2020 bonds for a 25 year term that ends
2045. $410,000 is the annual payment on the $6,500,000 in debt issued to finance the cost
of the N. 7th Ave. Streetscape Project, and the Aspen and N. 5th Ave. Improvements Project.
Professional Services and Outside Legal Counsel
Contracted Professional Services $ 60,000
9
Bozeman Midtown Urban Renewal District
An Urban Renewal District with a Tax Increment Financing (TIF) Program
Midtown Urban Renewal Board Annual Work Plan and Budget FY2023 Page 7 of 9
To assist with district management and implementation of the work plan and budget,
as well as responding to new opportunities, Staff will contract for services on an as-needed
basis.
Outside Legal Counsel $ 60,000
The Midtown Urban Renewal District continues to see strong interest in redevelopment. This
interest will necessitate work on development agreements under the Midtown TIF Assistance
Program, and depending on the scope of the projects, the need to issue additional bonds.
Redevelopment Incentive Programs
The Midtown Urban Renewal District’s redevelopment incentive programs are based on
criteria included in the 2015 Midtown Urban Renewal District Plan and the 2017 Midtown
Action Plan.
Technical Assistance Grants (TAG)$ 15,000
This program is to provide technical assistance funding to encourage developers to
build on parcels along the N. 7th Avenue corridor, or rehabilitate existing structures. It
recognizes the complexities of redeveloping parcels which have existing substandard
buildings and infrastructure; it was created to offset the costs of those complexities with grants
for those proposing work which eliminates blight and advances the implementation of the
District Plan. The program was approved by Resolution 4777 and is administered by the
MURB. The maximum grant amount for the program is $7,500 and requires a 1:1 match.
Midtown Tax Increment Finance Assistance Program –
Direct Incentives $ 100,000
The City Commission approved an incentive program, the Midtown TIF Assistance
Program pursuant to Resolution 4770 in 2017. Resolution 5087 reauthorized and updated
the Program in 2019. Awards will be based on the quality of projects and their support of the
Midtown Urban Renewal Plan. Projects of a larger magnitude may require the issuance of tax
increment revenue bonds. Projects $50,000 and under may be awarded by the Board and
sent to the City Commission as Consent Items. Projects over $50,000 require the approval of
the City Commission.
Fiber Conduit Connection Incentive Program $ 20,000
The District has made significant investments in facilitating competitive
telecommunications options through the provision of public conduit. This program, modeled
on a program created by the Downtown URD provides matching grants of up to $2,500 to
connect buildings to the City conduit system. The program facilitates connections to
infrastructure and the utilization of the existing conduit investment.
10
Bozeman Midtown Urban Renewal District
An Urban Renewal District with a Tax Increment Financing (TIF) Program
Midtown Urban Renewal Board Annual Work Plan and Budget FY2023 Page 8 of 9
Outreach and Marketing
Outreach and Mailing $ 10,000
The Board has requested money for public noticing and outreach activities in the
District. The purpose of these outreach activities is to inform and engage property owners
and the public in the implementation of the Midtown Urban Renewal Plan.
Midtown Marketing and Recruitment $ 10,000
This item includes maintenance of the District website, midtownbozeman.org, as well
as programs like the banner program to drive traffic to the website. The District uses the
website to communicate effectively with property owners, developers, and the public and “to
disseminate blight clearance and urban renewal information.” In addition, the board and staff
continue to actively recruit development projects in the district that are in support of the urban
renewal plan.
District Operations
Payroll $ 97,900
The City’s Economic Development Department manages the Bozeman Urban
Renewal District in response to City Commission and the Midtown Urban Renewal Board
work plans and policy guidance. 1.5 FTE are dedicated to staffing the Bozeman Urban
Renewal Program as a whole, of which the Midtown URD contributes a proportionate share
of funding.
Training $ 12,000
Strong professional development drives the success of the urban renewal program.
Staff plans to participate in the National Development Council’s Economic Development
Finance Professional (EDFP) Certification Program and the International Economic
Development Council’s (IEDC) certified economic developer course series over a number of
years
General Administrative Costs $ 20,000
This line item provides funding for the general and ordinary cost of running a
successful program and allows the program to respond to opportunities and challenges during
the year.
11
Bozeman Midtown Urban Renewal District
An Urban Renewal District with a Tax Increment Financing (TIF) Program
Midtown Urban Renewal Board Annual Work Plan and Budget FY2023 Page 9 of 9
Midtown Tax Increment Finance Assistance Program
Approved Grants and Direct Incentives
Workforce Housing (9TEN)$ 3,000,000
The project, as currently proposed, includes 100 units of housing. Forty units are deed
restricted for at least 30 years and limited to prices that are affordable to households making
120% of the area median income (AMI). Forty units will be sold at prices that are affordable
to households making 120% of the area median income (AMI), but will not be deed restricted
beyond initial sale. The remaining 20 units will be offered at the market rate. The project also
features 3000 SF of ground floor commercial space double fronting the corner of W. Aspen
St. and N. 8th Ave. This project is currently on hold and the board would like to be able to use
these funds on similar projects that would provide workforce housing within the District.