Martina Parrish
From:Garrett Schultz <gschultz@headwatersmt.net>
Sent:Tuesday, November 9, 2021 11:23 AM
To:Martina Parrish; Jeff Lusin; Jeremy May
Subject:Fwd: The Ridge Lot 6: Traffic Study Waiver
Attachments:Traffic Study Waiver Approval_Lot 6 and Lot 7A.pdf
Martina--please see the attached City of Bozeman approval of the traffic impact study waiver requests for both Lot 6
and Lot 7A . I will include this in the Civil Document I send you later today for Lot 6 also.
Thanks,
---------- Forwarded message ---------
From: Cody Flammond <CFlammond@bozeman.net >
Date: Tue, Nov 9, 2021 at 10:07 AM
Subject: RE: The Ridge Lot 6: Traffic Study Waiver
To: Garrett Schultz < gschultz@headwatersmt.net >
Garrett,
I apologize for not getting back to you sooner. Given the size and proposed intensity of the projects, traffic impact
studies will not be required for The Ridge Lot 6 and The Ridge Lot 7A site plan applications. A summary of the provided
trip estimates are below.
The Ridge Lot 6- 119 average daily trips and 14 peak hour trips.
The Ridge Lot 7A – 66 average daily trips and 9 peak hour trips.
Please provide this email as the official TIS waiver with the site plan applications.
Regards,
City of Bozeman MT
Cody Flammond, PE | Engineering Division
2
O: 406.582.2287
C: 406.599.1123
cflammond@bozeman.net
From: Garrett Schultz < gschultz@headwatersmt.net >
Sent: Tuesday, November 2, 2021 9:54 AM
To: Cody Flammond < CFlammond@BOZEMAN.NET >
Subject: The Ridge Lot 6: Traffic Study Waiver
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the
sender and know the content is safe.
Cody,
Please see the attached Traffic Study Waiver Request for The Ridge Lot 6 Site Plan submittal. The Site Plan has not been
submitted to the City yet.
Please let me know if you have any questions.
Also, can you give me an update on the status of the Traffic Study Waiver Request for The Ridge Lot 7A?
Thanks,
--
Garrett Schultz, P.E.
Headwaters Engineering, Inc.
190 Northstar Lane
Bozeman, MT 59718
3
gschultz@headwatersmt.net
406-570-3676
City of Bozeman emails are subject to the Right to Know provisions of Montana’s Constitution (Art. II, Sect. 9) and may
be considered a “public record” pursuant to Title 2, Chpt. 6, Montana Code Annotated. As such, this email, its sender
and receiver, and the contents may be available for public disclosure and will be retained pursuant to the City’s record
retention policies. Emails that contain confidential information such as information related to individual privacy may be
protected from disclosure under law.
--
Garrett Schultz, P.E.
Headwaters Engineering, Inc.
190 Northstar Lane
Bozeman, MT 59718
gschultz@headwatersmt.net
406-570-3676
This communication is the property of Headwaters Engineering, Inc. and may contain confidential or privileged information.
If you have received this communication in error, please notify the sender and delete the communication.