Loading...
HomeMy WebLinkAboutSewerCapacityResponse      190 NORTHSTAR LANE  BOZEMAN, MT  59718   406‐581‐5730  www.headwatersmt.net                                                                Page 1 of 2    January 28, 2022    City of Bozeman Community Development  Attn: Cody Flammond  20 East Olive Street  Bozeman, MT 59771    Re:  The Ridge Lot 7A  Site Plan Submittal   Sewer Capacity Response    Cody,    In response to Comment #6 on The Ridge Lot 7A Site Plan DRC Review, dated 1/27/22, please consider the  following:    The subject property falls within the 135‐acre area described as “Bozeman Athletic Club West Annexation” in  the Valley West Trunk Main Report, dated 1998 (Report). The sewer demand for the property is detailed in  the Report as follows:     On Page 3 of the Report, 13.3 persons per acre was used to estimate the future population   On Page 4, 117 gallons per day per person was used to estimate wastewater by future  developments   On Page 4, 150 gallons per acre per day was assumed for infiltration of groundwater    135 acres x 13.3 persons per acre x 117 gallons per day = 210,132 gallons per day of  wastewater generated by the 135‐acre site    Pro‐rating the sewer demand based on the size of the subject property, compared to the entire 135‐acre  parcel in the report is detailed below:     The subject property makes up 0.264 acres, or .2% of the 135‐acre site   0.2% x 210,132 gpd = 399 gpd wastewater demand allocated   According to page 8 of the Report, a peak flow of 2252.9 gpm (including infiltration) was  allocated.   0.2% x 2,252.9 = 4.5 gpm peak flow rate allocated for Lot 7A    A comparison of the development’s estimated demand versus the demand allocated in the design report is  below:   The Ridge Lot 7A Site Plan includes 6,000 SF of commercial space on 0.264 acres   The calculated average daily sewer flow rate is 316.8 gpd   The calculated peak hourly sewer flow rate is 1,740 gpd, or 1.2 gpm    Based on the provided calculations, the amounts allocated to the subject property for average daily sewer  flow and peak hourly sewer rate are greater than the estimated demand of the development.  190 Northstar Lane, Bozeman, MT 59718                  (406) 581‐5730                 www.headwatersmt.net                         Page 2 of 2  Detailed calculations for the development, as well as the Valley West Trunk Main Design Report are included  with this letter.    If you should have any questions, please do not hesitate to contact me at 406‐570‐3676      Sincerely,     ________________                                                    _                                              Garrett Schultz, P.E.                                                       Headwaters Engineering, Inc.                                              H:\1086\018\DOCS\Site Plan\Resubmittal\Sewer Capacity Response.docx