Loading...
HomeMy WebLinkAboutDesignReportValleyWestSewerTrunkLine DESIGN REPORT FOR VALLEY WEST SEWER TRUNK LINE :f BOZEMAN, MONTANA Prepared By: Morrison-Maierle, Inc. 901 Technology Boulevard P.O. Box 1113 <$ Bozeman, Montana 59771-1113 iX Prepared by: Jack R. Schunke Glenn A. Wood Morrison-Maierle, Inc. No. 2885.004.040.0310 w ' C" 7.4 : FL ar 0 9 1998, VALLEY WEST TRUNK LINE TABLE OF CONTENTS 1.0 Executive Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Pagel 2.0 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Pagel 3.0 Existing Valley Unit Sewer Trunk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 2 4.0 Proposed Service Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 2 5.0 Predicted Population . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 3 6.0 Predicted Wastewater Generation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 4 7.0 Peaking Factor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 5 8.0 Sewer Trunk Line Sizing by Drainage Zone . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 6 9.0 Valley West Trunk Line . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 9 10.0 Conclusion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page10 LIST OF TABLES Table 4.1 Proposed Service Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 3 Table 5.1 Predicted Population . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 4 Table 6.1 Predicted Wastewater Generation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 5 Table 8.1 Trunk Line Computation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 7 Table 9.1 Valley West Project Percent of Total Flow . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 9 Table 9.2 Required Line Size for Valley West Project Only . . . . . . . . . . . . . . . . . . . . . . . Page 10 LIST OF FIGURES Figure 1.1 Service Area 1.2 Valley West Sewer Trunk 8.1 Valley West Sewer Trunk Drainage Zones Page 1 LIST OF APPENDICES Appendix A Line Calculations LIST OF REFERENCES Wastewater Facility Plan Bozeman, Montana -May 1997 -pp 83-87. Metcalf and Eddy 3`d Edition Wastewater Engineering, Table 2-5 pp 20, Table 2-11 pp 28. Page 2 VALLEY WEST SEWER TRUNK DESIGN REPORT 1.0 Executive Summary The 360 Ranch Corporation proposes to develop a 404 acre tract west of Ferguson Avenue and south of Durston Road to be called Valley West. At this time, this area is without sewer service, therefore the Valley West Sewer Trunk Line will be built and will serve those areas included in the Valley West Annexation, which includes the Valley West Project, Bozeman Athletic Club West Annexation and that area 300 feet north of Durston Road beginning 1,320 feet west of the proposed alignment for Cottonwood Road eastward along Durston to Flanders Mill Road and that area between Flanders Mill Road, from 400 feet north of the proposed trunk line south to Durston Road, and the connection to the City's existing wastewater system. Total area to be served is 726 acres. (See Service Area Figure 1.1). The proposed trunk line will consist of approximately 16,500 feet of eight inch,ten inch, twelve inch, eighteen inch and twenty-one inch PVC pipe. (See Valley West Trunk Line Figure 1.2). Predicted wastewater generation for the 726 acres to be served by the trunk line is 1,031,160 gpd. The entire area is subject to high groundwater therefore infiltration(I/I)will be included with the wastewater flows predicted. (I/1) into the new line is based on Bozeman's May 1997 Wastewater Facilities Plan suggestion, (150 gpd per acre), for newly constructed sewer mains or 108,900 gpd for this project. Due to the topography of the area,the trunk line will be laid at nearly minimum grade from the connection to Bozeman's sewer system westward to the future intersection of Durston Road and Cottonwood Road. Hydraulic analysis completed during the design of the trunk line indicates that each line will flow the predicted peak flows with used capacity ranging from 13%to 98%of full flow capacity. 2.0 Introduction The proposed Valley West Sewer Trunk will connect to the City's existing wastewater system's Valley Unit Trunk Line at Manhole #946, approximately 3,850 feet northeast of the intersection of Durston Road and Flanders Mill Road, and extend west and south along the future extension of Cottonwood Road to a point approximately 400 feet north of Huffine Lane. The trunk line will follow the alignment of Cottonwood Road, Durston Road and Flanders Mill Road where possible and will be centered in a 30 foot utility easement in those areas where the trunk line crosses private property. Valley West Sewer Trunk Line Design Report Page 1 3.0 Existing Valley Unit Sewer Trunk The Valley Unit Sewer Trunk,an existing 18-inch line,extends 2,640 feet north from Durston Road, approximately 2,800 feet east of Ferguson Road, to Manhole #946, the proposed point of connection. At Manhole #946, the existing trunk line increases in size from an 18-inch line to a 20-inch line. 4.0 Proposed Service Area The service are for the proposed trunk line will consist of the Valley West Annexation, the Bozeman Athletic Club West Annexation, and those properties lying 300 feet north of Durston Road beginning 1,320 feet west of the proposed alignment for Cottonwood Road, eastward along Durston to Flanders Mill Road, and that area between Flanders Mill Road from 400 feet north of the proposed trunk line south to Durston Road, and the connection to the City's existing wastewater system. (See Table 4.1). Valley West Sewer Trunk Line Design Report Page 2 Table 4.1 Proposed Service Area Area Served Area(Ac) Valley West Annexation 0 Valley West 344.5 ® Billion Auto Plaza Subdivision 19.5 e Norton Ranch Inc. 40.0 Bozeman Athletic Club West Annexation 135.0 Christian Heritage School 13.0 Area North of Durston Road • Cannon/White 6.0 • Swenson 10.0 • Tom Lane 0.5 6 Mengel Trust 4.0 ® Hanson Trust 4.5 6 Anderson/Nelson 10.0 • Metcalf 2.0 i Douglas Smith 72.0 • Douglas Smith 20.0 • Joan Lewis/MacDonald 45.0 Total 726.0 5.0 Predicted Population Population density for this report will be based on findings detailed in the Bozeman May 1997 Wastewater Facility Plan, page 87. The plan indicates that an overall density prediction of 13.3 persons per acre should be used for new development. Valley West Sewer Trunk Line Design Report Page 3 Exceptions to the plan's recommendations are: the Christian Heritage School in which the population is known. Bronken Park in which it is assumed maximum event attendance would be 1500 people. The exclusion of the 10 acre lake being constructed in the western section of Valley West. Infiltration (I/I) allowance of 150 gallons per acre per day will be assumed corresponding to the City of Bozeman's "Wastewater Facility Plan" page 87. This is equivalent to 1.3 persons per acre of wastewater generation. (See Table 5.1) Table 5.1 Predicted Population Service Area Area(Ac) Population (I/1) (Person) Persons Valley West Annexation • Valley West 292.5* 3891 381 • Billion Auto Plaza Sub. 19.5 260 25 • Norton Ranch Inc. 40.0 532 52 Bozeman Athletic Club Annexation 135.0 1796 176 Area North of Durston Road 174.0 2315 227 Christian Heritage School 13 98 students 17 8 staff Total 674 Acres F 8898 1 878 * Less area for Bronken Park and proposed lake in western part of project. 6.0 Predicted Wastewater Generation Wastewater generation predicted in this report is based on findings detailed in the Bozeman May 1997, Wastewater Facility Plan, page 87. The plan indicates that an overall wastewater flow of 117 gpd per person should be used for new development. Wastewater generation for Bronken Park is based on 8 gpd/visitor. This information is based on Metcalf and Eddy 3`a Edition, Wastewater Engineering Table 2.5, page 20. Wastewater generation for the Christian Heritage School is 16 gpd/staff and 25 Valley West Sewer Trunk Line Design Report Page 4 gpd/student. This information is based on Metcalf and Eddy, 311 Edition, "Wastewater Engineering", Table 2-11,page 28 (See Table 6.1 for predicted wastewater generation). Table 6.1 Predicted Wastewater Generation Service Area Wastewater I/I (gpd) Generation (gpd) Valley West Annexation • Valley West 455,247 44,577 • Bronken Park 12,000 ® Billion Auto Plaza Sub. 30,420 2,925 ('2124� �3.0 -t (ajp<��,� A Norton Ranch Inc. 62,244 6,084 q,n r Bozeman Athletic Club West Annex. 210,132 20,592 Area North of Durston Road 270,855 26,559 Christian Heritage School 2,578 1,989 Subtotal 1,043,476 gpd 102,726 gpd Total 1,146,202 7.0 Peaking Factor Peaking factors will be determined using the following formula: Q (Peak/hourly)/Q (Design ave.) = 18 +IP - 4 +,rP Where Q =Flow P =Population in thousands Note: (Population will consist of predicted residential and commercial population based on 13.3 persons/acre). Valley West Sewer Trunk Line Design Report Page 5 8.0 Sewer Trunk Line Sizing by Drainage Zone Figure 8.1 "Valley West Sewer Trunk Line Drainage Zones", graphically details each drainage zone and section of sewer trunk line used in the "Trunk Line Computation Table", Table 8.1. Appendix A, Line Calculations contains the flow calculations for each of the 11 lines which make up the trunk line. Y Valley West Server Trunk Line Design Report Page 6 00 00 O N N 00 00 N c a C �Y 00 cr1 c*1 l� GO O ra 06 cl� GC�'� [r- E CO ►. 3, 00 M to to 00 116,° m 0000 O n cn d 00 N d .- E a. C:. cA cf, N O o d ri cn M M ri �Y N cz Q bA � 00 to M M to to d E o '-• N M d 0 cT lD cM fl Vr \10 M -- 06 .-, ., x0 .- a \0 N M O N G1 M �U rV �D �O C� M r- M C1 N N to [- to to M 00 ci to to O O O O O 00 O O m m O O N to C c.!: hL L LJ Q -- N M d to 00 G1 O r M et N cc c y ct N o N cn 00 00 cl� L E- E L - N m C- 00 cz V� L x 3 � •- N cf) It to t- 00 �, c O0 00 N_ c C � ... C t� cy O o, 'o CND h Ln a a w ^ w o 0 00 � M rn � r-• r -� >0. Gq 7-7 c U > ca. 00 00 Q tw M cn M N ;3 cn cn U>a, 00 N �t cn I-D In O oo w �t 00 > 0 bA <C ci cz cn O cn M 110 r- p O N 110 00 01 �10 110 00 �10 \O LD .. 00N n. a cn cn I'D O O O to ca y L L Q ai cn r- 00 C7� O N M t to 110 � — — — .-� — N N N N N N N C •cd C N CST M 00 .a U � cn � C � L [z y �_ ,� •-• ,-• as to 9.0 Valley West Trunk Line The Valley West trunk line is designed with sufficient capacity to serve areas outside the Valley West project. The flows predicted for the additional areas require that the trunk line size be increased beyond what is necessary to carry the predicted flows for the Valley West project in some portions of the trunk line. Two approaches are used to illustrate the oversizing of the trunk line. Approach number one compares the overall flow predicted for the Valley West project as a percentage of the total flow predicted. (See Table 9.1). Table 9.1 Valley West Project Percent of Total Flow Service Area Area Valley West 292.5 acres 455,160 gpd Subtotal 455,160 gpd Billion Auto Plaza Sub. 19.5 acres 30,344 gpd Norton Ranch Inc. 40.0 acres 62,244 gpd Bozeman Athletic Club West Annexation 135.0 acres 210,074 gpd Christian Heritage School 13.0 acres 2,578 gpd Area North of Durston Road 174.0 acres 270,761 gpd Subtotal 576,001 gpd Total 1,031,160 gpd Valley West contribution to the total flout 44.1%. In approach number two, each line component of the trunk line is sized to carry flow predicted for Valley West. (See Table 9.2). Valley West Sewer Trunk Line Design Report Page 9 Table 9.2 Required Line Size for Valley West Project Only Line Number Line Size Designed Line Size Designed for Valley West Trunk for Valley West Project Only 1 8" 8" 2 8" 8" 3 10" Not Required 4 12" 8" 5 12" 10" 6 18" 15" 7 18" 15" 8 18" 15" 9 18" 15" 10 21" 15" 11 21" 15" 10.0 Conclusion Using the Bozeman May 1997 Wastewater Facility Plan as a guide,the Valley West Trunk Line is designed to serve the 726 acres described in this report. At full buildout of the described area, it is predicted that up to 98% of the full flow capacity of the trunk line in several areas will be utilized. Construction of the project is expected to begin in the spring of 1998, and be completed by mid-summer of that year. The trunk line will be constructed in accordance with Montana Public Works(MPW) Fourth Edition,January, 1996, Standard Specifications in conjunction with City of Bozeman Modifications to MPW Standard Specifications prepared May, 1997. Valley West Sewer Trunk Line Design Report Page 10 FIGURE 8. 1 VALLEY WEST SEWER TRUNK LINE DRAINAGE ZONES ;I I II 1 II CK II I 2' I I I I 24 ;I I I� I 21 EXISTING MH Lu I 1 12 j 2 25 I I I� 18", t5l ! o I j I I i 3 i Fpp 19 j. 21 <`I 3 I I z 18 o c3 " DURSTON RD77 __ _ ___ _-____ _ -_ I 15 I � 1 o lI o �jQ'I LL j 13 I, Vi o l 0 .BAB000K RD� e 7- I '1 Il LEGEND: DRAINAGE ZONE NUMBER 4 I 1 ,I I i ' I i I CITY OF BOZEMAN j e a I 1 HUFFINE 'LAN ;I US HWY 191 r --------------- L__—__ ------- .. , --------------- - -------------- CITY LIMITS I I I 1 I I I I I I 1 I 'I � I FIGURE 1 . 1 VALLEY WEST SEWER TRUNK LINE SERVICE AREA I� I I� I 1 21 !EXISTING MH #946 ' W 1 -------------------------- ;I� i ;i w Q II i i 21» I i I18„ 18„i i i 11 I i L i ,I 11 I� �1 1� o 0 DURSTON RD n ; „ i „ ^ ; ---------------- ----------------- -- ------ -- ---"-- - - ------- -"- --------- -----_------- .-, ------- ------- I i------- __-_-----__-_--__--_--_-__-_•-J 1 , II I , I 1 1 oil x I I CVi o I ' 1 i I o 1 0» BABCOCK RD; 10 ''I - ✓„ -- ---------------- 1 I i I I I i i it i I� - 1 ,I � CITY OF BOZEMAN g' I HUFF LAN I US HWY 191 _ ------------ L__ ------- — ---------- ----- -------------- --------------- --- ------------ -------- -- - CITY LIMITS I 1 I I I 'I I ' I I I1 I I -------------- - ------------ I 'I 1 1