HomeMy WebLinkAboutCILWR_Lot7A1
Martina Parrish
From:Garrett Schultz <gschultz@headwatersmt.net>
Sent:Tuesday, October 19, 2021 6:08 PM
To:Martina Parrish
Cc:Jeremy May
Subject:Fwd: CIL Water Rights Confirmation: The Ridge Lot 7A
Attachments:Ph 2B, 2C, 2D.pdf; CILWR_21400 The Ridge Lot7A SP_101921.xlsx
Follow Up Flag:Follow up
Flag Status:Flagged
Martina--this email and attachments should suffice to respond to Danielle's Comment #4.
I'll have a response for the remaining civil items tomorrow, with the exception that the Traffic Study waiver is reliant on
City Engineering response timeline (I submitted that request today).
For the location of the bike rack, are you taking that, or are you looking for input?
Thanks,
---------- Forwarded message ---------
From: Griffin Nielsen <GNielsen@bozeman.net >
Date: Tue, Oct 19, 2021 at 4:37 PM
Subject: RE: CIL Water Rights Confirmation: The Ridge Lot 7A
To: Garrett Schultz < gschultz@headwatersmt.net >
Cc: Danielle Garber < DGarber@bozeman.net >, Martina Parrish < mparrish@45arch.com >, Jeremy May
<jmay@headwatersmt.net >
Garrett,
Attached is the preliminary CILWR determination for the project as well as the existing credit documentation. As
presented no CILWR fee is required as the existing credit associated with Lot 7A covers the proposed demands. Let me
know when the project has received adequacy and I’ll finalize the determination.
Regards,
City of Bozeman MT
Griffin Nielsen, PE | Engineering Department
406.582.2280
gnielsen@bozeman.net
2
From: Griffin Nielsen
Sent: Tuesday, October 19, 2021 8:34 AM
To: Garrett Schultz < gschultz@headwatersmt.net >
Cc: Danielle Garber < DGarber@BOZEMAN.NET >; Martina Parrish < mparrish@45arch.com >; Jeremy May
<jmay@headwatersmt.net >
Subject: RE: CIL Water Rights Confirmation: The Ridge Lot 7A
Hi Garrett,
Just confirming receipt of your request and of our conversation from 9/17. The CILWR review is in my queue and will be
completed here shortly.
Thanks,
City of Bozeman MT
Griffin Nielsen, PE | Engineering Department
406.582.2280
gnielsen@bozeman.net
From: Garrett Schultz < gschultz@headwatersmt.net >
Sent: Tuesday, October 19, 2021 7:53 AM
To: Griffin Nielsen < GNielsen@BOZEMAN.NET >
Cc: Danielle Garber < DGarber@BOZEMAN.NET >; Martina Parrish < mparrish@45arch.com >; Jeremy May
<jmay@headwatersmt.net >
Subject: Re: CIL Water Rights Confirmation: The Ridge Lot 7A
3
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the
sender and know the content is safe.
Good Morning Griffin,
The Site Plan for The Ridge Lot 7A (#21400) has been submitted and reviewed for completeness. I had emailed you on
September 1st requesting confirmation of Cash-in-lieu of water rights. I had not gotten a response, and followed up with
a phone call on or around September 17th, when we discussed the project. I provided you with our estimated CILWR,
and you said to include my email to you in our Site Plan submittal, and you would follow up with a confirmation.
During the Completeness Review, Danielle commented on the Site Plan that CILWR needs to be confirmed to continue
the review. Can you please provide that confirmation?
Thanks,
On Fri, Sep 17, 2021 at 1:42 PM Garrett Schultz < gschultz@headwatersmt.net > wrote:
Hi Griffin. It's been a couple weeks, so I wanted to reach back out and see if we could discuss water rights/CIL for Ridge
Subdivision Lot 7A.
Thanks,
On Wed, Sep 1, 2021 at 9:18 AM Garrett Schultz < gschultz@headwatersmt.net > wrote:
Good Morning Griffin,
I am working on a Site Plan Submittal for a commercial building project (approx. 6,000 sf office space) at the Ridge
Subdivision Lot 7A. The legal description of the lot is: RIDGE ATHLETIC CLUB SUB, S10, T02 S, R05 E, Lot 7A, ACRES
0.2637, PLAT J-465-A. The Geocode is: 06-0798-10-3-01-30-0000.
More specifically, I am working on cash in lieu of water rights (CILWR) for the Lot. I believe CILWR was already paid at
the time of PUD, but can you verify that for me?
Also, is the fee still $6,000/AF?
Thanks for your help.
Pr
o
j
e
c
t
:
Th
e
R
i
d
g
e
L
o
t
7
A
S
P
Pr
o
j
e
c
t
N
o
:
21
4
0
0
Da
t
e
:
10
/
1
9
/
2
0
2
1
Us
e
Us
e
A
r
e
a
R
e
s
i
d
e
n
t
i
a
l
U
n
i
t
W
a
t
e
r
D
e
m
a
n
d
U
n
i
t
W
a
t
e
r
D
e
m
a
n
d
sq
.
f
t
.
U
n
i
t
s
g
a
l
/
y
r
/
1
,
0
0
0
s
q
.
f
t
.
A
F
/
r
e
s
i
d
e
n
t
i
a
l
u
n
i
t
g
a
l
/
y
r
A
F
/
y
r
Co
m
m
e
r
c
i
a
l
-
N
o
n
d
e
s
c
r
i
p
t
6,
0
0
0
-
-
-
1
0
,
0
0
0
-
-
-
0
.
1
8
Ir
r
i
g
a
t
i
o
n
0.14
To
t
a
l
0.32
le
s
s
C
I
L
W
R
C
r
e
d
i
t
f
r
o
m
A
n
n
e
x
o
r
S
u
b
d
i
v
i
s
i
o
n
*
0.80 0.00 -0.47
CI
L
W
R
F
e
e
-
P2
1
4
0
0
P
R
O
J
E
C
T
N
A
M
E
@
$
6
,
0
0
0
/
A
F
*
*
-$
*
C
r
e
d
i
t
o
f
2
2
.
5
7
g
a
l
/
s
q
.
f
t
.
(
l
o
t
a
r
e
a
)
a
n
d
L
o
t
7
A
=
1
1
,
4
8
6
S
q
.
F
t
.
**
$
6
,
0
0
0
/
A
F
C
I
L
w
a
t
e
r
r
i
g
h
t
s
v
a
l
u
e
e
s
t
a
b
l
i
s
h
e
d
b
y
C
i
t
y
C
o
m
m
i
s
s
i
o
n
R
e
s
o
l
u
t
i
o
n
N
o
.
4
0
9
5
Estimated Water Volume
le
s
s
h
i
s
t
o
r
i
c
a
l
a
n
n
u
a
l
a
v
g
m
e
t
e
r
e
d
u
s
e
Ne
t
V
o
l
u
m
e
f
o
r
C
I
L
W
R
Pr
e
l
i
m
i
n
a
r
y
D
e
t
e
r
m
i
n
a
t
i
o
n