Loading...
HomeMy WebLinkAboutSA201BuildingElevationsColorSOFFIT LIGHTING 20 SF SIGN 7 7 6 1 9 5 8 2 3 4 FACING FALLON MIXED BLOCK FRONTAGE. TRANSPARENCY OF THIS ELEVATION IS DETERMINED BY BUILDING PLACEMENT AND SETBACKS. THE PUD CALLS FOR A 15' SETBACK HERE. PER TABLE 38.510.030D, THIS NON -RESIDENTIAL USE WITHIN 20' OF THE SIDEWALK IS REQUIRED TO HAVE 25% TRANSPARENCY BETWEEN 4' AND 8' ABOVE THE GROUND SURFACE. ACTUAL TRANSPARENCY CALCULATION: 32% OF ELEVATION BETWEEN 4' AND 8' IS TRANSPARENT > 25% -OK SOFFIT LIGHTING WOOD FRAME CANOPY WITH METAL DRAINAGE AND ATTACHMENTS 20 SF SIGN 9 6 4 1 3 2 8 3 7 7 5 SOFFIT LIGHTING 1 7 4 6 9 8 3 2 FACING RAVALLI MIXED BLOCK FRONTAGE. TRANSPARENCY OF THIS ELEVATION IS DETERMINED BY BUILDING PLACEMENT AND SETBACKS. THE PUD CALLS FOR A 15' SETBACK HERE. PER TABLE 38.510.030D, THIS NON -RESIDENTIAL USE WITHIN 20' OF THE SIDEWALK IS REQUIRED TO HAVE 25% TRANSPARENCY BETWEEN 4' AND 8' ABOVE THE GROUND SURFACE. ACTUAL TRANSPARENCY CALCULATION: 34% OF ELEVATION BETWEEN 4' AND 8' IS TRANSPARENT > 25% -OK SOFFIT LIGHTING, TYP 20 SF SIGN 1 7 7 6 4 2 8 9 9 3 CEDAR SCREENING FENCE VERTICALLY ORIENTED CORRUGATED METAL PANEL; EXPOSED FASTENERS B.O.D.: BRIDGER STEEL, 7/8" CORRUGAGTED SIDING PAINT: SILVER METALLIC. MIN. 24 GA. HORIZONTALLY ORIENTED METAL PANEL B.O.D.: BRIDGER STEEL, 12" MODERN ULTRA BATTEN SIDING PAINT: SLATE GRAY. MIN. 24 GA. EXTERIOR MATERIALS LEGEND CLEAR GLAZING -AT ALL GLAZING LOCATIONS TIMBER STAIN -SHERWIN WILLIAMS 3508 COVERED BRIDGE EXTERIOR SEMI -TRANSPARENT STAIN -TYP @ ALL TIMBER CORBELS CANOPY: TIMBER STAIN FRAME, BLACK TURN BUCKLES AND OTHER METAL COMPONENTS MATERIAL PROFILE (IF APPLICABLE) MATERIAL COLOR SELECTION GRAPHIC REPRESENTATION (LINEWORK ELEVATIONS) DESCRIPTION WOOD SOFFITS -WOODTONE 1X6 T&G SQUARE EDGE PROFILE COLOR: TEXAS HONEY BROWN CLEAR ANODIZED ALUMINUM BLACK METAL CLAD WOOD WINDOWS METAL PARAPET CAP, FASCIA CAP OTHER MISC. METALS: BLACK KEY # (RENDERED ELEVATIONS) 1 2 3 4 5 6 7 8 9 SIGNAGE REQUIREMENTS 1. THIS PROJECT HAS A TOTAL BUILDING FRONTAGE OF 165 LINEAR FEET ALONG RAVALLI AND FALLON STREETS 2. BMC TABLE 38.560.060 ALLOCATES 1.25 SF OF SIGN PER LINEAR FOOT OF BUILDING FRONTAGE FOR THE FIRST 25', .5 ABOVE 25' A. THE RIDGE PUD HAS BEEN GRANTED A SIGN AREA RELAXATION TO ALLOW ALL LOTS WITHIN THE SUBDIVISION UP TO 250 SF OF SIGNAGE EACH, CALCULATED AS 1.5 SF FOR EVERY 1 FOOT OF LINEAR BUILDING FRONTAGE. B. LOT 7A QUALIFIES FOR AN ADDITIONAL 35% WALL SIGN AREA DUE TO THE ADDITIONAL STREET FRONTAGE. THE ADDTIONAL AREA CAN ONLY BE UTILIZED ON THE PUBLIC STREET FACING SIDE OF THE BUILDING. 3. PER THE PUD COMPREHENSIVE SIGN PLAN, NEW BUILDING FREESTANDING SIGNS ARE ENCOURAGED. THESE ARE ALLOWED 32 SF AND A MAXIMUM OF 5' IN HEIGHT. MONUMENT SIGNS MUST BE PLACED ON THE SITE PLAN TO FIT ANY VISION TRIANGLE REGULATIONS OF THE CITY OF BOZEMAN. SIGNAGE CALCULATIONS 1. 165 LINEAR FEET BUILDING FRONTAGE X 1.5 = 247.5 SF OF SIGNAGE ALLOWED 2. ADD 35% = + 86 SF = 334.125 SF OF SIGN ALLOWED 3. BUILDING APPLIED SIGNAGE CONSISTS OF 60 SF OF EXTRUDED ALUMINUM LETTERING 1/8" = 1'-0" SA2.01 SHELL - NORTH ELEVATION COLOR 1 1/8" = 1'-0" SA2.01 SHELL - SOUTH ELEVATION COLOR 2 1/8" = 1'-0" SA2.01 SHELL - EAST ELEVATION COLOR 3 1/8" = 1'-0" SA2.01 SHELL - WEST ELEVATION COLOR 4 Date: 45 Arch Project Number: Sheet Name AL L D R A W N A N D W R I T T E N I N F O R M A T I O N A P P E A R I N G S H A L L N OT B E D U P L I C A T E D , D I S C L O S E D O R O T H E R W I S E U S E D W I T H O UT T H E W R I T T E N C O N S E N T OF 4 5 A R C H I T E C T U R E . Co n s u l t a n t 1216 W Lincoln Street, Suite D Bozeman, Montana 59715 (406) 577-2345 www.45arch.com REVISIONS 1/2 8 / 2 0 2 2 1 1 : 4 6 : 2 9 A M SA2.01 SHELL EXT ELEVATIONS COLOR TH E R I D G E L O T 7 A January 31, 2022 21025 43 5 1 F A L L O N S T , B O Z E M A N M T 5 9 7 1 8 BL A C K D I R T , L L C SH E L L 1/2" = 1'-0" SA2.01 ISO - CORNER OF FALLON & RAVALLI 5 1/2" = 1'-0" SA2.01 ISO - MAIN ENTRY CORNER 6 NTS -FOR REFERENCE ONLY NTS -FOR REFERENCE ONLY 1 NO DESCRIPTION DATE 1 SP REVIEW 01/20/22