Loading...
HomeMy WebLinkAbout006 C1.3 Drainage Plan N Q � 0 N STM. INLET #G470 > IF OUT 472&7' (W) °� m STM INLET #G469 IS IN 4728.6' (N) . ¢ � IS OUT 4727.6' (N) o IS IN 4727.5' (E) < < < < < < < wv SCALE SAN. MH #G468 > > > > > > > 0 IS OUT 4723.7' (N) LOT 4 IE IN 4723.8' (E) wv o W W __W'_ W W W�W W W W W W W W -a'Ij- L w lurch 31Y w OPEN (2)REBAR WITH HKM PLASTIC EXTG' ADA _ SPACE CAPS, 0.10' APART, ACCEPTED 5 S S S _S S 5 A���TO S S S S 9 �S S S Aa RAMPS PUBLIC I WESTERLY PIN BASED ON ' 34- N 43g3� S c`il �� o ACCESS POSITION 47 STM. INLET #G473 rn 24" DIA AREA DRAIN 1 IS OUT 4730.5' (E) w m III \\A GRATE 4735.4 r-- r-- - INV IN 4733.8. \\ -- Nc,c_ r `UP --�UP UP U UP UP UP _ ADS STORMTECH SC-740 CHAMBER-WEST ,1 - �F'If�F'II`� ADS STORMTECH RETENTION/INFILTRATION BASIN. I I I ^ SC-740 CHAMBER BOTTOM OF CHAMBER 4732.5 TT a� �rL-e-. HH HHH NIA 36_ FINISH I - �I BASIN A - EAST 9 BOTTOM OF GRAVEL 4732.0 4 - \ HHHH H n FLOOR \ _ RETENTION/INFILTRATION BASIN. ceas c. I I I ELEVATION- FINISH FLOOR FINISH FLOO� IHHHHH HHHH Bor oM of CHAMBER: 4731.0 - ``I IF a FINISH FI'OOR - NYLOPLAST BOTTOM OF GRAVEL: 4730.0 noeloazs ac 47338.0 0, ELEVATION ELEVATION ELEVATION DRAIN BASIN p HHHH HHHH tGRATE 4737.0 4736.0 ti 4735.5 GRATE 4733.6 NYLOPLAST NV IN 4731.9 HHHHHH--H \ 3 DRAIN BASIN A DRAIN \ \ -->.-aWGRATE 4736.2 4734.9 - _ " - - - 12" ADS SID INV IN 4733.4 OUT 4733.9 \• 5=2.0% - �' D Y: G12" ADS SD DS SD - - # / ;L: 135.78' REVIEWED BY: DAD R: 1152.00' 5=0.46= c .0% \ s PROJECT ENGINEER:CGB 4 6'45'11 24"' DIA. AREADRAIN16" WIDE CURB ✓CB: N 04'16'38" E GRATE 4737.1 CUT G.G. 4734.8. �`INV THRU 4733.68 24" SO AREA DRAIN DESIGNED BY:CGB CH: 135.70' s _ GRATE 4733.8 a^� Ie. .. IN OUT 4732.0 v _ FINISH ] A ICI 12" ADS SD FLOOR I STM. INLET #G475 y S 0 46% JJJ 1 I a �=1 L \ FINISHFLOOR FII VATIOOR ELEVATION IF our 31.0 ( (N) ? ELEVATION UP ELEVATION ? a�s� 4738.1 E IN 4731.0 (s) 4738.25 ` 4 4737. / - _ 45 UP ID 6. � g / 11 RGROUNuD R & GAS DULLSF ASH R. PcOoW re 474 /4736 12 wv CB. IN 'S2'59" W H CH 74 W W\\ W W V`Pd W W W\ W W W W W W W\\ W W w S S \ S � S S S S 5 S UP I ® 3 ►�v 1� i cn �.�® L416'1� P UP'-- UP UP P UP ® UP _ UR UP -'.0 / D WAY O TJ E W WESTWIN p FINISH FLOOR \ FINISH FLOOR . FINISH FLOOR FINISH FLOOR FINISH FLOOR I� ELEVATION ELEVATION ELEVATIONS ELEVATION ELEVATION �� SAN. MH #G476 47416 474I.0 ® \ 4739.E 4738.5 4738.5 9 PIPE DIRECTION IN A O v v \ f6 v ^ \ NOTES DON'T MATCH BOZEM\ /�+ VERIFY N GIS, NEED TO VERIFY ST INLET #3477 I (� IF T 4733.9' (E) BENT BAR M a REB 3 BAR LAID 4'I WIAT ON BASIN INFILTRAT GRAVEL -- g737 - 24" WIDE GRAVEL - - _ BENT R 24" WIDE GRAVEL _ - 24 WID _ n --- ION BASIN - - INFILTRATION BASIN \ / VER T..J -111 - �.��--- -- _'_` 4738- ----- --L: 73.25' R: 723.00',_4742-___ i �IJ$L3E-PAS----- --473s--- 4 5'48'18" - - CB: S 04'20'25" W - - /'`� _ I P4 N V CH 7322' 3 REBAR T r�v o0 Ax, _ � �[L�E \ / IRRIGATION / IRRIGATION 3 CO ROL BOX / STM. INLET G483 �} # CONTROL BOX �� - / IE OUT 4735.6' (S) ^ i' P yyy • W V WALK o O gopo SAN. MH #G478 C) N v W W W wow w W w W w w -W W s (NSW) FLOWLINE EL 4732.0' � -w S�RH MH W� w w w w w w w w Nsw s s s s�\ -s sl° s s ® 5-S,�� s IE773725(Wj490 s s s -s s s s s Os v b W N WINTER PARK STREET SAN. MH 3 so 47°S IF OUT 3 so 3 sD 3 - �1 FL WLINE EL. } > -vv os `a °o a Wv I ¢ Q 'a 4734.cJ w w ¢ SAN. MH #G481 a STM. MH G480j 3 SAN. MH » FLOWLINE EL 3 STM. INLEr #c490 # > > IS IN 4734.5' (W) IS IN 4734.1' W > #G487 > > > 03 4732.9 IS OUT 4734.4'(E) IE OUT 34.1'( jE) 0 SHEET o FLOWLNE ELo 0 o x STM. MH #G484 SAN. MH G479 Q PIPES COVERED W/ IS IN 4732.5' (W) 47J'rJ.H� 3 WATER IE IN 4732.8' (5) E ��e� �zd AUTUMN GROVE E OUT 4732.5' (E) DRAINAGE PLAN PROJECT:21-104 DATE:DECEMBER 2021