Loading...
HomeMy WebLinkAbout016 Site Plan Project NarrativeConcept Site Plan Narrative Autumn Grove Condominiums Multi-Unit Housing Development West Winds Sub PH 5, Block 2, Lot 5 Plat J-494 “Autumn Grove Condominiums” is a proposed phased residential condominium development, in an R-3 (Residential Medium-Density District) zoned property located South of Autumn Grove Street and East of Davis Lane in Bozeman, Montana. The project will be located on approximately a 5-acre parcel, adjacent to an existing 1.5-acre park which is located to the South. Public water and sanitary sewer mains and services will need to be installed to serve the majority of the development. There are 5 – 3 Plex units and 8 – 4 Plex units consisting of 3-bedroom units in each that will be in two stories high buildings. Parking for the development will be located in the garages, driveways, designated parking spaces and on street parking located on Windward Avenue and Autumn Grove Street. One hundred and forty-one parking spaces are required and two hundred and five parking spaces will be provided for the future condominiums. Access to the site will be provided by a full access from Windward Avenue and Autumn Grove Street. Required open space will be provided by a combination of porch area, gardening/planter area, and adjoining landscaped open space. The landscaped open space area will be located immediately adjacent to the porches. The stormwater retention/infiltration facilities will be located on both the East and West ends of the site. This will include a combination of surface curb flow, curb cuts, area drains and piping to subsurface facilities. CILWR is proposed as well as CIL/IIL of parkland dedication, will be provided. Previous correspondence is included for previous CILWR credit. Phasing is proposed for the project, phasing will consist of 4 phases and 13 buildings when fully developed. Phasing will consist of the following: • Phase 1 – Buildings 2 – 5, Northern buildings and only building located on the East property line - Water, Sewer and gravel access located in phase 2 to be installed. • Phase 2 – Buildings 6 and 7, interior buildings • Phase 3 – Building 8 – 10, South side of property • Phase 4 – Buildings 11 – 13 & 1, West side of corner of property Phasing will be determined on current market and project funding.