HomeMy WebLinkAbout016 Site Plan Project NarrativeConcept Site Plan Narrative
Autumn Grove Condominiums
Multi-Unit Housing Development
West Winds Sub PH 5, Block 2, Lot 5 Plat J-494
“Autumn Grove Condominiums” is a proposed phased residential condominium development, in
an R-3 (Residential Medium-Density District) zoned property located South of Autumn Grove
Street and East of Davis Lane in Bozeman, Montana.
The project will be located on approximately a 5-acre parcel, adjacent to an existing 1.5-acre
park which is located to the South. Public water and sanitary sewer mains and services will need
to be installed to serve the majority of the development. There are 5 – 3 Plex units and 8 – 4 Plex
units consisting of 3-bedroom units in each that will be in two stories high buildings.
Parking for the development will be located in the garages, driveways, designated parking spaces
and on street parking located on Windward Avenue and Autumn Grove Street. One hundred and
forty-one parking spaces are required and two hundred and five parking spaces will be provided
for the future condominiums. Access to the site will be provided by a full access from Windward
Avenue and Autumn Grove Street.
Required open space will be provided by a combination of porch area, gardening/planter area,
and adjoining landscaped open space. The landscaped open space area will be located
immediately adjacent to the porches.
The stormwater retention/infiltration facilities will be located on both the East and West ends of
the site. This will include a combination of surface curb flow, curb cuts, area drains and piping to
subsurface facilities. CILWR is proposed as well as CIL/IIL of parkland dedication, will be
provided. Previous correspondence is included for previous CILWR credit.
Phasing is proposed for the project, phasing will consist of 4 phases and 13 buildings when fully
developed. Phasing will consist of the following:
• Phase 1 – Buildings 2 – 5, Northern buildings and only building located on the East
property line
- Water, Sewer and gravel access located in phase 2 to be installed.
• Phase 2 – Buildings 6 and 7, interior buildings
• Phase 3 – Building 8 – 10, South side of property
• Phase 4 – Buildings 11 – 13 & 1, West side of corner of property
Phasing will be determined on current market and project funding.