Loading...
HomeMy WebLinkAbout013 Stormwater Management Design Report STORMWATER MANAGEMENT DESIGN REPORT FOR: AUTUMN GROVE CONDOMINIUM LOT 5 BLOCK 2 WEST WINDS SUBDIVSION PH 5 BOZEMAN, MT Prepared By: MADISON ENGINEERING Madison Engineering 895 Technology Drive, Suite 203 Bozeman, MT 59718 (406) 586-0262 DECEMBER 2021 STORMWATER MANAGEMENT DESIGN REPORT FOR: AUTUMN GROVE CONDOMINIUM LOT 5 BLOCK 2 WEST WINDS SUBDIVSION PH 5 BOZEMAN, MT Madison Engineering 895 Technology Blvd Ste 203 Bozeman, MT 59718 (406) 586-0262 o .'•GHHIS G.•'• ' BL'GFSI�! • No i0 25PE - w: DECEMBER 2021 , ENS��• �� AUTUMN GROVE CONDOMINIUM LOT 5 BLOCK 2 WEST WINDS SUB PH 5 STORMWATER DESIGN REPORT A. Introduction This design report will give an overview of the proposed stormwater system for the proposed 5- acre site plan for `Autumn Grove Condominium' located on Davis Lane and Autumn Grove Street in Bozeman, Montana. The proposed multi-unit, multi-story residential condominium development will be constructed in multiple phases on R-3 (Residential Medium-Density District) zoned property and consists of 5 — Tri-Plexes and 8 — Four Plexes, with associated on-site drive aisles, driveways, pedestrian walkways, parking, and landscaping. Open space will be provided by ground level private outdoor space which will be adjacent and directly accessible to the subject unit. The proposed storm water management system consists of overland sheet flow, curb & gutter and piping that will direct stormwater to on site ADS Stormtech SC-740 retention/infiltration basins to serve the site. Off-site discharge is not proposed. The infiltration basins will be excavated to native gravels to permit maximum infiltration. The following references were used in the preparation of this report: a. COB Design Standards and Specifications Policy, 2004. Addendum#7 b. COB Modifications to Montana Public Works Standard Specifications (MPWSS) The proposed drainage and grading plan and ADS Stormtech basin detail are included in Appendix A of this report. B. Runoff and Basin Calculation A 10-year, 2-hour design rainfall frequency was used for calculating the basin sizing utilizing the rational method in accordance with the COB design standards. A runoff coefficient C of 0.90 was used for impervious areas and a C value of 0.20 was used for landscaped areas. The tables below illustrate the calculated runoff coefficients and areas for each as well as a summary of the stormwater basin calculations. Page 1 of 3 Table 1: Stormwater Basin Run-Off Area & Coefficient Total Area Impervious Landscaped Basin Weighted C (sf) Area (sf) Area (sf) A 0.68 143,630 97,466 46,164 B 0.58 74,435 40,515 33,919 Table 2: Stormwater Basin Calculations Basin Required Provided Storage (cf) Storage (cf) A 6,570 6,896 B 2,931 3,101 C. Native Soils and Groundwater Data Soils on the subject property are typical for the area and are detailed in Appendix A — On-Site Exploration Logs section of the Geotechnical Report prepared by Allied Engineering. Native Sandy Gravels are 4'-6' in depth, overlain with native silty clays. The nearest off site Test Pit to this site is Test Pit #23. Both ADS Stormtech SC-740 infiltration systems consisting of oversize cobbles should be excavated to native gravels to permit maximum infiltration of stormwater. Backfill above the ADS chambers to consist of clean, crushed angular stone and well-graded aggregate mixtures. Groundwater depths were observed and recorded during the peak high ground water in June and July of 2021. Groundwater depths were measured in on site monitoring well #4 (Basin A) ranged in depth between 3.48 — 5.0 feet below the existing ground surface (4729.74 — 4728.22). Groundwater depths in on site monitoring well #1 (Basin B) ranged in depth between 5.72—7.55 feet below the existing ground surface (4731.89 — 4730.06). Elevation of bottom of basin gravels in Basins A & B are 4730.0 and 4732.0 respectively. These test pits are located at or near the proposed underground stormwater basins. Groundwater information is included in Appendix B of this report. D. Conveyance Capacity The proposed private stormwater collection and retention/infiltration systems were designed to convey the 25-year storm event per the City of Bozeman standards. The conveyance structures include piping that directs stormwater run-off to the on-site infiltration basins. Twelve-inch storm sewer and catch basins are proposed to collect and convey the stormwater run-off from Basins A & B to the retention/infiltration basins. Stormwater piping calculations are included in Appendix C of this report. E. Stormwater Retention/Infiltration Basin Page 2 of 3 All of the stormwater runoff from the site is proposed to be conveyed to on-site retention/infiltration basins and ultimately infiltrate into native gravels. Subsurface ADS infiltration chambers are proposed for this project. Stormwater calculations are included in Appendix C of this report. Table 3 below shows the finished grade elevations of each ADS infiltrator basin and the depth to the bottom of gravel for each basin. Table 3: Groundwater Depth vs. Proposed FG Elevations Basin A Basin B TP 4 TP1 Existing Ground Elevation: 4733.0 4736.5 Average Depth to Peak Groundwater: 4.3 6.5 Elevation of High Groundwater: 4729.74 4730.06 Proposed Finish Surface Grade: 4735.0 4736.25 Bottom of ADS Basin Gravel Elevation: 4730.0 4732.0 Bottom of Basin Gravel Above High Groundwater Yes Yes As shown in Table 3 there is adequate separation between the bottom of the basin gravels and the estimated seasonally high groundwater. The retention storage volumes were sized based on the 10-year 2-hour design rainfall frequency per the City Design Standards. The rational method was used to determine post-development stormwater flows. The calculations for all stormwater storage facilities are included in Appendix C of this report. The proposed stormwater facilities reduce the post-development runoff rate to zero. All impervious surface runoff is conveyed to the infiltration retention systems and then infiltrates into the ground. F. Stormwater Facility Maintenance The proposed storm drainage facilities will be privately operated and maintained by the property owners association of the on-site development. Included in Appendix D is a proposed maintenance program for the stormwater collection and infiltration systems as well as the O&M Manual for the ADS StormTech system.. Appendices A. Drawings and Details B. Groundwater Monitoring Data C. Stormwater Calculations and ADS Stormtech SC-740 Chamber Design D. Stormwater Maintenance Plan Page 3 of 3 Appendices Appendix A — Drawings and Details �ld � h � STM, INLET 11C470 IE OUT 4728 7'(W It IN 4728.6'(N) z STM. INLET NG469 # IE OUT 7,6' aS IE IN 472727 5' (E)E) 1 > > 3 3 3 3 3 ; 3 V'• SCALE SAN MH pG46B > >_ > > > 4r' 0 IE OUT 4723.T (N) _ 0 0 o re && " • LOT 4 IE IN 4723.8• (E) W W lo* - W. W W W W W - - W IY VY W W w W W 7 h.&- 30 OPEN I (2)REBAR WITH HKM PLASTIC I I - J 4155 EXTG'ADA _ +' SPACE CAPS, 010' APART, ACCEPTED TBC- END CRIB 5 S 7L S S L�S AUTUMN GROVE s 5 S S 3 �-S -5 xx RAMPS PUBLIC I 14E STERLY PIN BASED ON I t 4735.26 ji,♦ Jl q7]]� STRM �t �- ACCESS POSITION TBC- END CRB _ S7111 I/gET,�G473 4735.13 IE OEfT g3G.5'(E) UP J4 473e. GRO BRK 7 1 - - 1- 47J5.27 `• - - (- 47iq s FINISH E e•CONC. t e•COW- 'L• \ 6'cow_ e•fONL FLOOR 1{ oc SATs s7Trs STEPS STEPSmns t -it - ELEVATION I 4735.0 FIIVISH FLOOR FINISH FLOOR 02 FINISH FLOOR < yTrmo '` 4736.SS f ELEVATION ELEVATION ELEVATION 47366 47360Tw 4735.S o r gB• C. .+ _ _ Tec - - 447735.92 . Y 73B 7J� 73+ 73` a►o' 7>s DRAWN BY:CGB L: 135J8' , R: 1152 00' 4737.5 Jam_ (9 TBC ( REVIEWED BY:DAC TBC-DRP CBS '� I PROJECT ENGINEER:COD A 6*45'11" I 4736.0 7 733, BRPVC 7 -473J.9 CB: N 04'16'3B'E 738. 73B DRP CIja P B CH: 1JSJ0' DESIGNED 6Y:CG O��J 7 - 4• \ "p' ]P. I _ 4736. 71i TBC 35. STEPS D 3 ,4737. 73a.' \730. 473e•.OgTBC 35.26 ' E 4I - -_ '-t- .� FINISH 47 .3 , 737 i s r 4734.8 .T ^ a TBC 35.26 35. P / ELEVATION SIN. INLET dG975 c IE CUT 47„0 9'(N) �\ > \ C; FIIQISH FLOOR ` - FINIM FLOOR 1 \ \ , s}rEBPs srTps SiErs A T ELEVATION ELEVATION , 4737.1 3I E IN 4731 0(S) 473 T'-- 9.25 4737.43 r� .7 STEPS FINMHFLOOR '. �1i 0�� \ - �ti UNONROTOGAS F ! _ CONDUwdRIT &GAS { pQ ELEVATION _ - CON SUIT STUB ~. 1 �f 4740.25 7HC yI� 6 B STEPS B B B stFps 4738.07; 11 I - \`\ TBC / `u51EP5 C 7aB� a w 35.2r9C 3520 -I O L. 74.✓ R: 30.00'\77 f TBC 1 N _ A 13*0610" 4739.E Tom• - - Y T3- " 35.34 �•' I vv CB: N)16-52'59•W w CRe w - THC - w -w w -w w -w N w -r w O a (J CH: 74.�3' + 7,}0. T3Y -TBC - 4737.E 7J7 7.14 , 73# TBC a� .j ,� TBC7 END CRB it ,1,P 740. 3 47389 _ 5 5 5 0� 38.0 TBC 36.3 ! 1 I 4737.4 N ' OfleSRB _.CRB__-- � 1HC I Q A TBC o - a40. .�. ! -- _. P •jp.•- _1 'r` M30 3740,81 4741. WAY Fi) 1 FINISH FLOOR v FINISH FLOOR �^ FE M FLOOR FINISH FLOOR FINISH FLOOR I 1 `p f ELEVATION ` ELEVATION ELEVATION ELEVATION ELEVATION a TBC- END CRB-SAN MH NG476 11-� y( X 4741.9 4741.0 `a , 4739.1 47383 14737.67 1�4 4738.0 PIPE DIRECTION IN Q O I 3-5' -_` -- _�) - _`0 NOTES DON'T MATCH y y. 7A N BOZEM AN G15,NEED TO C ¢ TBC ! • VERIFY Tric 61 CONC 8'CONC Y 0•CONC, B•CONC B'CONC - B'CONO- B'CDNC 36.9 STEPS SEEPS / SEEPS STEPS STEPS STEPS ;TIPS / �.1 :b \ 1 o - I o 5 IN LET OG477 - IF I I I I I I 1 I 1 I I T 4733 9'(E) 1 1 I I 1 I BENT AIT _- AR LAID - --_ _y _-___-9]3]-- _-_--- -T-----�-_-: 9EVTY- VER ���� �. -4738 L: 73.25' R: 723.00',_4742 ��'- -PUBLIePARB--'--__-_-_-477e-_ _A 5,48,18" ---� 1 CB: S O4.20'25' W I -� -I _ \ 1' 1 1 0-4 (NcJ REBAR I TION eq iRR %, CONTROL BOX ROL BOX / { STM.INLET#G483 I1\ IRRIGaTICN � '' I�•I IF IE OUT � M o SAN MH 1Y ,W' 14 11 W-_--�-w W N 'N IN - w ��-W W - r FLOWIINE EL 0' V H N v ays •�, - 'AN-�1H A w v w W W -w w w W w .w v a p NSW) T7 �UT STM. INLET#Ga90 7 ( O ' s s\ s s Q -'s s s�^c�--is iE�rsszs(W) s s - s s z s s s Ch u �TI % WINTER PARR STREET *-SAN M H 3 3 FLOWUNE 3 SAN. MH 3 3 34734.J N j> 3 SAN MN pG4Bl ¢ V, l4'BS I` - FLOWL NE EL 3 STM INLET PI-,tgp S'4 MN �G46a I G487 > &03 4732.9' IE IN +'34.� (Wj IE Ou1 4133-9'(E) i o FLOWLINE Eh o 0 0 o It OUT 4734.4'(E) IE IN 47341•(W) u $HEEj' SIN. MH ,yG4B4 1 4735.8 Q WATER PIPES COVERED W/ IF IN 4732 54(W) Y C1•2 IE IN 4732.8'(S) 2 AUTUMN GROVE IE OUT 4732 5-(E) GRADING PLAN R PROJECT:21-104 DATE:DECEMBER 2021 STY- INLET#C47C IF OUT 4728,7'(W) IE IN 4728.6'(N) STM INLET#G469 9 IE OUT 4727.6' (N) IE IN 4727 5' (E) 3 3 3 < > } 3 2 vV SCAMSAN MH pG468 3 M IF (E)our 4723.T (N) - ` o 0 0 0 0 LOT 4 I ,8'E IN 4723 8 o w w �►f --w w ow w l-- w w w � w w w w -w w �w N -v�I�N 1�- w OPEN ( (2)REBAR WITH HKM PLASTIC I 3 SPACE CAPS, 010'APART, ACCEPTED 5� S s S s 1. 5 -A -gj3 E%TG'ADA _ PUBLIC I WESTERLY PIN BASED ON I N / Q S S �- S -S RAMPS ACCESS POSITION STM- INLET,yG473 24" DIA AREA DRAIN I' IE OUTi730.5'(E) III \ J ��ir1�}�• GRATE I 4735.4 •• - r -INV IN 4733.8. ® UP UP L' IJ lIP UP ADS STORMTECH SC-740 CHAMBER-WEST RETENTION/INFILTRATION BASIN. ADS STORMTECH BOTTOM OF CHAMBER 4732,5 1 ---•a 1 c SC-740 CHAMBER BOTTOM OF GRAVEL: 4732,5 FLOORFEqmH 1 ! ` �4 I ,I BASIN RETENTION/INFILTRATION- EAST ELEVATION FIIVISH FLOOR FIIdISH FLOOR , \ ( to BOTTOMOF CHAMBER: 47B31.0 I- 47568$ ELEVATION ELEVATION PINISIIFioOR�" NYLOPLASF BOTTOM OF GRAVEL: 4730.0K - I ELEVATION DRAIN BASIN 7 F} 4J r I ' \V NYLOPLAST F 4736.E 4736.0 �ttiti 1 473$.$ GRATE 47J3,6' f--k-f/II ()� DRAIN BASIN -AREA DRAIN \ J IN1V IN 4737.9 \ GRATE 4736.2 GRATE 4134.9 •� INV OUT 4733.9 1-- 12•ADS SD INV IN 4733-4 � � ! \ I � - S=2.OS. 1 �. /^II •n •,, .�.- .. DRAWN BY:CGB V 12'ADS SD l I - -8"ADS SD r'I 7 L: 1JSJB' S=0.46% S=1.OX z REVIEWED BY:DAD R: 1152.0C' - ' A 6'45'11" 24" DIA AREA DRNN �- 16•WIDE CURB I, PROJECT ENGINEER:CGB GRATE 473Z1 CUT G.C. 47J4.8. ti ° I ,IA �y\y CB: N 04'16.38'•E 24"SO AREA DRAIN CH: 135.70' INV THRU 4733.6E GRATE 4733.8 7 DESIGNED BY:CGB INV OUT 4732 0 3 r12.5 05 SID46x I 1 f •�, 'V + . FLOOR�R 3I INLET NG475 NL EATION T 4730.9'(N) 47371ELEVATION ELEVATON r IE IN4731 D(S) 4737.45 UND�'.ROUND F f FIIV SH FLOOR 5- 111111��� J ELEVATION \ Y --- CCOONDUI TSIUB I" 474025 I - I .n_e O 10' �I\€v CB: 1 �'W�_ - , b\ W W W W W W W W W W� W- W NI CH: 77' W W W f 5 S ! S S S S --S- S --S I I P l 3 NW W W •.1� l P - UP -' r 1J4 - .UP P UP 4' :11' - Ud-"�.II C' -'.IJ / �_ WND WAY O !I FIIQI9H FLOOR FINISH FLOOR \� FEVISH FLOOR r s FDMH FLOOR FEVIHH FLIMR � l i 3 ELEVATION ELEVATION ELEVATION A EI.EVAnON ELEVATION _ r vv 4741.9 4741.0 47391 4738$ us SAN, IR CTION / A _ 47�.0 _ I PIPE DIRECTION IN I�4 a � NOTES DON'T MATCH 5 BOZEMAN GIS,NEED TO ("I VERIFY Frrl _ - S INLET IG477 F--1 BENT R AR IF T 4733.9'(E) 1��1 HEBAR LAID __ _ _ 24' WIDE GRAVEL 24"WIDE GRAVEL _4737-_ 24"WIDE GRAVEL 6\pR -INFILTRATION BASIN - INFILTRATION BASIN --�1 1 - I. -INFILTRATION_BASIN __---- -,---� SENT 723.00' -4742-'- y --__ �i ✓s ' �y v _ \ �_PLTELW-PARK----_-- --4139--- L: 73.25'R: ` CB: S 04'20'25" W N \ / CCNI RlrGOLO BOX // - } _STM INLET NG483 i/ FIRRIIA BOX I � ~ ra Gr N IE OUT 4735.6'(S) CCNTR (� T. 04A SAN MH JG478 z O -11 W ��:V W -w �- W \y y�r .. 1V W W LV W W W�K�w 1Y 1V - 1 A- -♦�,f0 FLOW'LINE EL 47320' n O v S� s s 's\ s s bb-5 s 5 -si ;'s E_4735_25(1-STM. INLET 4)49D s S s s �,• S s s (NSW) y Q r WIIVIER PARK SIRRBBCc IE UT i R {� JAN. MH 3 JE T T IrA�'I F 3 3 Y �1 f Iv% FLOWLIIN El\ ! � iJ > I #G48 MH 3 a j4734.5' v >'< 3 sAFLOWLINE EL ` ' vt p 3 STM INLET G490 STM, MH G480 > 47329' > -IE IN 4734,5'(W) IE OUT 4733.9'(E) o FLOWL NE Eg a p ST ,, MH 'G4B43 o IE OUT 4734.4'(E) IE IN 4734.1'(W) gSHEffr 4735.8 ®Q PIPES COVERED W/ S;LV. MH #'G479 Cy.3 WATER IE N 47325'(W) Z 1 IE IN 4732:8'(S) AUTUMN GROVE IF OUT 4732.5'(E) DRAINAGE PLAN tgj PROJECT•21-104 4 DATE:DECEMBER 2021 Appendix B — Soil Data and Groundwater Monitoring Data Soils Investigation Report _ z - - - ------- ------ lar,av Rr -- - I I ►Jr tr.o � ,, n.0 I �1 I TM I I ,e►. ,� I Tnze �.sa n-zz- T►1 TP•u---TI-a) ' _— -— e„p. vs,,. ar TM:1 pry LEGEND K I el RT " ' 7.9 TMfe TEST PIT LOCATION W/ f f f GROUNDWATER DEPTH(BGS) (DURING TEST PIT EXCAVATION, _ _ I AND SHALLOWEST MEASUREMENTS IN I GROUNDWATER MONITORING WELLS) NOTES: 1) TEST PITS#1-#8 WERE EXCAVATED ON FEBRUARY 12,2016 + AND EACH CONTAIN GROUNDWATER MONITORING WELLS. Rr :-- -_-. I- p'-- - 1K1 - 2) TEST PITS#9-#33 WERE EXCAVATED ON MARCH 23 AND ' J.R1 MARCH 24,2016 AND DO NOT CONTAIN MONITORING WELLS --_`V. 3) TO DATE, THE SHALLOWEST MEASUREMENTS IN THE j I GROUNDWATER MONITORING WELLS WERE RECORDED ON I _ APRIL 8,2016. r r 4) THE DEPTHS OF MW-1 AND MW-5 ARE 8.7'AND 9.6-BELOW GROUND, RESPECTIVELY. GROUNDWATER HAS NOT YET RISEN INTO THESE WELLS.THEREFORE, THE WELLS ARE LISTED AS BEING DRY. • —--� r -`ma's ----�'�, —- _— _�.�_ _I_ --r•;-'1'.;_..�-- . 5) TEST PITS#22-#33 WERE DUG TO A SHALLOW DEPTH AND 9� DID NOT ENCOUNTER GROUNDWATER-THEREFORE, THEY ARE LISTED AS BEING DRY. III WEST WINDS DEVELOPMENT ,�a„ r„,• FTCLRF soawu ur uin, I CIWI&rglncertng `. GROUNDWATER DEPTH Geotec4n7cal Erylnowfng ni A07.EMANr MONTANA Land Surveying =�isw'erroovo 34 F- W TEST PIT DESIGNATION: TP-23 LOCATION: South Side of Pond CivH F.ogmtering Z (Ll Bozeman.MT 59718 `.1 q M. !- GeoteehviwEnginerring Phone,(40°)582.0221 3 z a 0. HORIZONTAL DISTANCE(FT): (See Figures 4,5,&6 for Approximate Location) Lane Surveying Fa:(4a6)582-5770 o 2 4 6 8 10 1 DESCRIPTION OF MATERIALS Q A 4 A m Q A o Q o. o. a. o. o. o. o_ � : .• o. •. o. • . o. o. Q: Q•. Q: Q: Q: Q: . . p Q' p Q 'p Q'' Q'� Q''� The random fill in TP-23 was O{0.0'-0.2'}: Organic Fill �cia' �O.' ��a. �d ' Ada' a mixture of brown and black Medium stiff,dark brown;organic AQ. Qp. Q4. Q. po Via• clayey SILT w/abundant roots and Q' " Q o. Q: ..o. Q: .•o. Q: . Q: silt/clay w/scattered gravels •o Q p 'Q •� Q•:p Q .� Q .� and some intermixed topsoil. 1 . scattered gravels;moist. 2 F Notes: -Fill is comprised of poor topsoil. 3 O{0.2'-2.5'}: Random Fill - _ _ ,�_� Med.stiff to stiff, brown and black; - - - -` -��"- "Target"foundation bearing in sandy SILT to sandy lean CLAY w/ 4 - - - - - -� -� sandy GRAVEL below 4.5'depth. scattered gravels and some inter- w �o - ° -. ° _. ° - mixed topsoil;moist to very moist. ° ° ° 0 0 °o o e ° o ° G°o ° ° 0 ° °° o° ° D o C Notes: O v ° D Q ° Oo D O ° v v D p ° v ° -Fill is comprised of silt/clay w/ �° ° °°° a o�° °� �° °°° p°o ° o` ° P y O ° , scattered gravels. It is a mixture 6 ° ° ° O 0 ° ° ° ° ° o 0 ° ° O of brown and black. -Fill is very moist. O{2.5'-3.0'}: Native Topsoil Stiff;black to dark brown; organic clayey SILT w/abundant roots; 8 moist. 0{3.0'-4.5'}: Native Silt/Clay Very stiff to stiff,dark brown to ;0 brown;sandy SILT to sandy lean a DESCRIPTION OF MATERIALS(cont.): t9 CLAY;moist. 4' 10 O 14.5'-6.0'}: Native Sandy Gravel j Dense; brown;sandy GRAVEL w/ Notes: a -Vuggy appearance(pin holes). abundant gravels&cobbles;moist. -Stiff to very stiff throughout depth. -Becomes little more moist w/depth. Notes; c -"Clean"sandy gravel. -Lower 1.0 contains some gravels. Z _"Target"bearing material. rn -Unsuitable bearing material. 12 W SURFACE ELEVATION: N/A BACKHOE TYPE: Cat 312 Excavator JOB NUMBER: 16-003 TOTAL DEPTH: 6.0' BACKHOE OPERATOR: Brynn Harris-Townsend Backhoe PROJECT: West Winds Dev. GROUNDWATER: Dry (on 3/24/16) LOGGED BY. Lee S.Evans-AESI DATE: March 24,2016 Groundwater Monitoring Data IS. -- -- - i- j, - • Paoli gig ■-r rr t' . - Yr' S tP Googl Earth N ,; 300 t Autumn Grove Lot 5 Block 2 West Winds Subdivsion PH 5 Groundwater Monitoring Summary Top of Grnd 6/23/2021 7/2/2021 7/9/2021 7/16/2021 7/22/2021 Monitoring Pipe Top of Casing Elevation I Depth of Depth of Depth of I Depth of I Depth of Well Elevation to Ground(ft) @ Pi a Measured GW Grndwtr Measured GW Grndwtr Measured GW Grndwtr Measured GW Grndwtr Measured GW Grndwtr 1 4738.78 1.17 4737.61 8.65 4730.13 7.48 8.72 4730.06 7.55 6.98 4731.80 5.81 6.89 4731.89 5.72 6.92 4731.86 5.75 2 4741.92 0.92 4741.00 9.57 4732.35 8.65 9.80 4732.12 8.88 7.02 4734.90 6.10 7.00 4734.92 6.08 7.07 4734.85 6.15 3 4739.23 3.58 4735.65 7.77 4731.46 4.19 8.20 4731.03 4.62 7.96 4731.27 4.38 7.76 4731.47 4.18 7.59 4731.64 4.01 4 4736.22 3.00 4733.22 6.48 4729.74 3.48 6.82 4729.40 3.82 8.00 4728.22 5.00 7.70 4728.52 4.70 7.38 4728.84 4.38 5 4738.93 2.75 4736.18 9.23 4729.70 6.48 9.41 4729.52 6.66 1 8.62 1 4730.31 1 5.87 8.21 4730.72 5.46 8.27 4730.66 5.52 Appendix C — Stormwater Calculations and ADS Storm Chamber Design Pipe Capacity Calculations Autumn Grove 25 year Storm Event Stormwater Run-off Calculation Design Rainfall Freq. 25 year IDF coefficient a 0.78 IDF coefficient b IDF coefficient n 0.64 Basin A Post-development Calculations - C Areas (ft): Landscape 46,164 0.20 Impervious 97,466 0.90 Total: 143,630 total area: 3.30 acres composite C: 0.68 Overland t, average slope: 1.6 percent travel distance: 230 feet tc: 10 minutes Total k: 10 minutes intensity at tc(fig 23): 2.41 in/hr pre-devel peak runoff: 5.36 cfs Basin B Post-development CaICUlationS C Areas(ft): Landscape 33,919 0.20 Impervious 40,515 0.90 Total: 74,434 total area: 1 71 acres composite C: 0.58 Overland t, average slope: 1.85 percent travel distance: 230 feet tc: 12 minutes Total k: 12 minutes intensity at t,(fig 23): 2.19 in/hr pre-devel peak runoff: 2.17 cfs Storm Runoff Calculation-25 year event.xls 12"PVC Appendix C Checked at slope=0.46% CIRCULAR CHANNEL T Manning's Eqn. Q= 1.486 A RV3 S1n n Diameter,do(in)= 12 4-Enter Value Diameter,do(ft)= 1 THETA Units= 1.486 n= 0.013 Slope,S(ft/ft) 0.0046 Wetted Hydraulic Hydraulic 58ctlOn Energy,IE Area,A Perimeter,P Radius,R Top Width,T Depth,D Factor,Z Q(gpd-8 =V=/2g Dep)h,y(it) Theta(red) (it') (it) (ft) (ft) (ft) (ft"*) Q(cfs) Q(gpm) hourday) V(ft/s) (ft) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 0.0 0.00 0.05 0.90 0.01 0.45 0.03 0.44 0.03 0.00 0.0 5.2 24997 0.8 0.01 0.10 1.29 0.04 0.64 0.06 0.60 0.07 0.01 0.1 22,6 108680 1.2 0.02 0.15 1.59 0.07 0.80 0.09 0.71 0.10 0.02 0.1 52,7 25303.7 1.6 0.04 0.20 1.85 0.11 0.93 0.12 0.80 0.14 0.04 0.2 95.0 45585.5 1.9 0.06 0.25 2.09 0.15 1.05 0.15 0.87 0.18 0.06 0.3 148.6 71306.3 2.2 0.07 0.30 2.32 0.20 1.16 0.17 0.92 0.22 0.09 0.6 212.4 101940.5 2.4 0.09 0.35 2.63 0.24 1.27 0.19 0.95 0.26 0.12 0.6 285.2 136874.1 2.6 0.10 0.40 2.74 0.29 1.37 0.21 0.98 0.30 0.16 0.8 365.5 175420.0 2.8 0.12 0.45 2.94 0.34 1.47 0.23 0.99 0.34 0.20 1.0 451.7 216825.6 2.9 0.13 0.50 3.14 0.39 1.57 0.25 1.00 0.39 0.25 1.2 542.2 260276.5 3.1 0.15 0.55 3.34 0.44 1.67 0.26 0.99 0.44 0.30 1 A 635.2 304893.6 3.2 0.16 0.60 3.64 0.49 1.77 0.28 0.98 0.50 0.35 1.8 728.6 349728.5 3.3 0.17 0.65 3.75 0.54 1.88 0.29 0.95 0.67 0.41 1.8 820.3 393750.7 3.4 0.18 0.70 3.96 0.59 1.98 0.30 0.92 0.64 0.47 2.0 908.0 435826.6 3.4 0.18 0.75 4.19 0.63 2.09 0.30 0.87 0.73 0.64 2.2 988-9 474680.7 3.5 0.19 0.80 4.43 0.67 2.21 0.30 0.80 0.84 0.62 2.4 1060.0 508823.4 3.5 0.19 0.85 4.69 0.71 2.35 0.30 0.71 1.00 0.71 2.5 1117.5 536398.9 3.5 0.19 0.90 5.00 0.74 2.50 0.30 0.60 1.24 0.83 2.6 1155.8 554804.1 3.5 0.19 0.95 5.38 0.77 2.69 0.29 0.44 1.77 1.02 2.8 1165.3 5593418 3.4 0.18 1.00 6.28 0.79 3.14 0.26 0.00 ?.4 1084.9 520729.1 3.1 0.15 40 35 3,0 25 20 i -E(ft) / 15 10 0.5 / 0.0 0.00 0.20 0.40 0.60 0.80 1.00 1.20 Depth(ft) 12"PVC Appendix C Checked at slope=2.0% CIRCULAR CHANNEL - T Manning's Eqn. Q=1.486 A R as S112 n Diameter,do(in)= 12 All-Enter Value Diameter,do(ft)= 1 TFIETi, Units= 1.486 n= 0.013 Slope,S(ft/ft) 0.02 Wetted Hydraulic Hydraulic Section Energy, Area,A Perimeter,P Radius,R Top Width,T Depth,D Factor,Z Q(gpd-8 =VZ/29 Depth,y(ft) Theta(red) (ft) Ot) (ft) VQ (ft) (ftw) Q(cfs) Q(gpm) hour day) V(ft/s) (h) 0.00 0.00 0.00 000 0.00 0.00 0.00 000 0.0 0.0 00 0.0 0.00 0.05 0.90 0.01 0.45 0.03 0.44 0.03 0.00 0.0 109 5212.3 1.6 0.04 0.10 1.29 0.04 0.64 0.06 0.60 0.07 0.01 0.1 47.2 22661.4 2.6 0.10 0.15 1.59 0.07 0.80 0.09 0.71 0.10 0.02 0.2 109.9 527620 3.3 0.17 0.20 1.85 0.11 0.93 0.12 0.80 0.14 0.04 CIA 198.0 950524 3.9 0.24 0.25 2.09 0.15 1.05 0.15 0.87 0.18 0.06 0.7 309.8 1486839 4.6 0.31 0.30 2.32 0.20 1.16 0.17 0.92 0.22 0.09 1.0 442.8 2125607 5.0 0.38 0.35 2.53 0.24 1.27 0.19 0.95 0.26 0.12 1.3 594.6 2854023 5.4 0.45 0.40 2.74 0.29 1.37 0.21 0.98 0.30 0.16 1.7 762.0 365776.0 5.8 0.52 0.45 2.94 0.34 1.47 0.23 0.99 0.34 0.20 2.1 941.9 452113.0 6.1 0.58 0.50 3.14 0.39 1.57 0.25 1.00 0.39 0.25 2.5 1130.7 542714.1 6.4 0.64 0.55 3.34 0.44 1.67 0.26 0.99 0.44 0.30 3.0 1324.5 635747.1 6.7 0.69 0.60 3.54 0.49 1.77 0.28 0.98 0.50 0.35 3A 1519.2 7292343 6.9 0.73 0.65 3.75 0.54 1.88 0.29 0.95 0.57 0.41 3.8 1710.5 8210270 7.1 0.77 0.70 3.96 0.59 1.98 0.30 0.92 0.64 0.47 4.2 1893.3 9087614 7.2 0.80 0.75 4.19 0.63 2.09 0.30 0.87 0.73 0.64 4.6 2062.0 989777.7 7.3 0.82 0.80 4.43 0.67 2.21 0.30 0.80 0.84 0.62 4.9 2210.4 1060970.1 7.3 0.83 0.85 4.69 0.71 2.35 0.30 0.71 1.00 0.71 5.2 23301 1118469.1 7.3 0.83 0.90 5.00 0.74 2.50 0.30 0.60 1.24 0.83 6.4 2410.1 1156846.5 7.2 0.81 0.95 5.38 0.77 2.69 0.29 0.44 1.77 1.02 5 t 2429.8 1166308.4 7.0 0.77 1.00 6.28 0.79 3.14 0.25 0.00 SA 2262.1 10857952 6.4 0.64 8.0 7.0 60 5.0 i ----0(CFS) -V(R/s) 4.0 / �I -E(R) � 3.0 � 2.0 i� 1.0 i 00 ''- 0.00 0.20 0.40 0.60 0.80 1.00 1.20 Depth(ft) Basin Calculations I I `r `�� .'•« ` -.' -' - -' �� -AU,rU-M,AN GROVE STREET -.� -• -. r-. III II I BASIN B I ADS - Sx, SiORMTECH SC STOMRWATER BASIN - -- - F TY TTTY77 1 �r±y* iQEYAYfOlf FRommo R FINIEFLOOR FINMFI.00� + 4736ffi I =M� ffiBVA PLUVATiON ++++++ + 4fll.S - I + +tttt I ollp BASIN B 74,435 SF I �� I � ,;' Ml ' rC�7 473LIS 4777A5 a FINISH FLOOR � ELEVATION t 474025 BAST A I- -- 1 ; - - - •� :,i _.�{ 143,630 SF ` I• a •.'...f �•� �` •-`-� .. f _ jai-w--.".�-'^--._ N_ ��-� I r• :" � -. n .�_,.—., �� - � -• -- 1 �i i FINISH FLOOR - PINIBHFLOOR i� I t mm FLOOR FINIDHFLOI ' �, FIIil8HM.00lt s ` ; ELEVATION ELEVATION El"AnON MZVATM EZMA77M 4741.9 4741.0 47M 47M � 47560 � , E I ? > o PUBLIC AUTUMN GROVE MADISON ENGINEERING EXHIBIT A STORMWATER DRAINAGE "STIMENOLOCY BLVD.B=2M DRAWN BY: CGB HOZEMAN,MT 59n8 DATE: 12/02/21 BASIN EXHIBIT PHONE(406)58"M PROJECT#21-104 Autumn Grove 12/2/2021 Lot 5 Block 2 West Winds Subdivsion PH 5 Stormwater Detention/Retention Calculations Basin A Calculation of Required Volume for Storm Water Retention & Infitration System Design Rainfall Freq. 10 year-2 Hour event OF coefficient a 0.64 OF coefficient b OF coefficient n 0.65 Post-development Calculations: Total Basin Area: 143,341 sf C Areas(ft): Roof Area 49,300 0.90 Impervious 48.166 0.90 Sidewalk Landscaped 46.164 0.20 Total: 143,630 0.68 Retention Basin Calculation: Q=CIA C= 0.68 (post-development) I = 0.41 in/hr(10-yr,2-hr storm) A= 3.30 acres QpOsc= 0.91 cfs Required retention storage(ft3) = 6,570 ft' (10-yr,2-hr storm) Provided retention storage(ft3) = 6,896 ft' ,in-East.xls Autumn Grove 12/2/2021 Lot 5 Block 2 West Winds Subdivsion PH 5 Stormwater Detention/Retention Calculations Basin B Calculation of Required Volume for Storm Water Retention & Infitration System Design Rainfall Freq. 10 year-2 Hour event OF coefficient a 0.64 OF coefficient b OF coefficient n 0.65 Post-development Calculations: Total Basin Area: 74,434 sf C Areas(ft): Roof Area 18,850 0.90 Impervious 21,665 0.90 Sidewalk Landscaped 33.919 0.20 Total: 74,434 0.58 Retention Basin Calculation: Q=CIA C= 0.58 (post-development) I = 0.41 in/hr(10-yr,2-hr storm) A= 1.71 acres QpOgt= 0.41 cfs Required retention storage(ft3)= 2,931 ft3 (10-yr,2-hr storm) Provided retention storage(ft3)= 3,101 ft3 ADS Basin-West.xls ADS Storintech Basin Calculations //ADS User Inputs Results Chamber Model: SC-740 Svstem Volume and Bed Size Outlet Control Structure: No Project Name: Autumn Grove- Installed Storage Volume: 6896.26 cubic ft. Basin A(East) Storage Volume Per Chamber: 45.90 cubic ft. Engineer: Chris Budeski Number Of Chambers Required: 70 Project Location: Montana Number Of End Caps Required: 20 Measurement Type: Imperial Chamber Rows: 10 Required Storage Volume: 6570 cubic ft. Maximum Length: 57.71 ft. Stone Porosity: 40% Maximum Width: 49 ft. Stone Foundation Depth: 12 in. Approx.Bed Size Required: 2760.26 square ft. Stone Above Chambers: 12 in. Average Cover Over Chambers; 18 in. System Components Design Constraint Dimensions: (70 ft.x 60 ft.) Amount Of Stone Required: 341.04 cubic yards Volume Of Excavation(Not Including 460.04 cubic yards Fill): Non-woven Geotextile Required(ex- 864.12 square yards cluding Isolator Row): Non-woven Geotextile Required(Iso- 54.84 square yards lator Row): Total Non-woven Geotextile Required:918.97 square yards Woven Geotextile Required(excluding47.50 square yards Isolator Row): Woven Geotextile Required(Isolator 34.28 square yards Row): Total Woven Geotextile Required: 81.78 square yards EMBEDMENT STONE SHALL BE A CLEAN,CRUSHED AND ANGULAR GRANULAR WELL-GRADED SOIUAGGREGATE MIXTURES,<35% STONE WITH AN AASHTO M43 DESIGNATION BETWEEN•3 AND•57 FINES,COMPACT IN 6'(150 mm)MAX LIFTS TO 95%PROCTOR CHAMBERS SHALL MEET THE REQUIREMENTS FOR DENSITY SEE THE TABLE OF ACCEPTABLE FILL MATERIALS ASTM F241B POLYPROPLENE OPP)CHAMBERS OR ASTM F922 POLYETHYLENE(PE)CHAMBERS CHAMBERS SHALL BE BE DESIGNED IN ACCORDANCE WITH ASTM F2787 \ "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC ADS GEOSYTHETICS 601T NON-WOVEN CORRUGATED WALL STORMWATER COLLECTION CHAMBERS' GEOTTXTILE ALL AROUND CLEAN,CRUSHED, PAVEMENT LAYER(DESIGNED ANGULAR EMBEDMENT STONE BY SITE DESIGN ENGINEER) (450 1 I f 1( 4 MAX 6'(150 mm1 MOJ PERIMETER STONE'J _ \ (760 mm) EXCAVATION WALL 1 (CAN BE SLOPED_ _. .. 1'1-. OR VERTICAL) _lIl � DEPTH OF STONE TO BE DETERMINED 12'(300 mm)MIN SG740 L BY SITE DESIGN ENGINEER 6'(150 mm)MIN ray END CAP SITE DESIGN ENGINEER IS RESPONSIBLE FOR 6' S1'(1295 mm) 7Y(300 mm)TYP THE ENSURING THE REQUIRED BEARING - (150 mm)MIN CAPACITY OF SUBGRADE SOILS 'MINIMUM COVER TO BOTTOM OF FLEXIBLE PAVEMENT.FOR UNPAVED INSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR.INCREASE COVER TO 24"IWO mm) Project: Autumn Grove - Basin A StormTech- Chamber Model - SC-740 oeWren•Rater -vare.a�mr Units- Imperial(� Click Here for Metric A�ivisivn of MM - - 11,13906 Number of chambers- 70 Voids in the stone (porosity)- 40 % Base of Stone Elevation- 10000 ft Amount of Stone Above Chambers- 12 in 0 Include Perimeter Stone In Calculations Amount of Stone Below Chambers- 12 in Area of system- 2761 Isf Min.Area- 2366 sf min. area StormTech SC-740 Cumulative Storc-,c, Height of Incremental Single Incremental Incremental Incremental Ch Cumulative System Chamber Total Chamber Stone & St Chamber Elevation (inches) (cubic feel) (cubic feet) (cubic feet) (cubic feet) cubic feet) (feet) 54 0.00 0.00 92.03 92.03 6899.74 104.50 53 0.00 0.00 92.03 92.03 6807.70 104.42 52 0.00 0.00 92.03 92.03 6715.67 104.33 51 0.00 0.00 92.03 92.03 6623.64 104.25 50 0.00 0.00 92.03 92.03 6531.60 104.17 49 0.00 0.00 92.03 92.03 6439.57 104.08 48 0.00 0.00 92.03 92.03 6347.54 104.00 47 0.00 0.00 92.03 92.03 6255.50 103.92 46 0.00 0.00 92.03 92.03 6163.47 103.83 45 0.00 0.00 92.03 92.03 6071.44 103.75 44 0.00 0.00 92.03 92.03 5979.40 103.67 43 0.00 0.00 92.03 92.03 5887.37 103.58 42 0.05 3.85 90.49 94.34 5795.34 103.50 41 0.16 11.40 87.47 98.88 5700.99 103.42 40 0.28 19.74 84.14 103.87 5602.12 103.33 39 0.60 42.28 75.12 117.40 5498.24 103.25 38 0.80 56.12 69.59 125.71 5380.84 103.17 37 0.95 66.55 65.41 131.96 5255.14 103.08 36 1.07 75.22 61.95 137.16 5123.17 103.00 35 1.18 82.63 58.98 141.61 4986.01 102.92 34 1.27 88.60 56.59 145.19 4844.40 102.83 33 1.36 94.85 54.09 148.94 4699.21 102.75 32 1.45 101.79 51.32 153.11 4550.26 102.67 31 1.52 106.73 49.34 156.07 4397.16 102.58 30 1.58 110.76 47.73 158.49 4241.09 102.50 29 1.64 114.96 46.05 161.01 4082.59 102.42 28 1.70 118.97 44.45 163.41 3921.59 102.33 27 1.75 122.70 42.95 165.66 3758.17 102.25 26 1.80 126.20 41.55 167.75 3592.52 102.17 25 1.85 129.85 40.09 169.94 3424.76 102.08 24 1.89 132.52 39.03 171.54 3254.82 102.00 23 1.93 135.38 37.88 173.26 3083.28 101.92 22 1.97 138.25 36.73 174.98 2910.02 101.83 21 2.01 140.69 35.76 176.45 2735.03 101.75 20 2.04 143.15 34.77 177.92 2558.58 101.67 19 2.07 145.25 33.93 179.18 2380.66 101.58 18 2.10 147.34 33.10 180.44 2201.48 101.50 17 2.13 149.23 32.34 181.57 2021.04 101.42 16 2.15 150.77 31.73 182.50 1839.47 101.33 ///ADS- User Inputs Results Chamber Model: SC-740 System Volume and Bed Size Outlet Control Structure: No Project Name: Autumn Grove- Installed Storage Volume: 3101.15 cubic ft. Basin B(West) Storage Volume Per Chamber: 45.90 cubic ft. Engineer: Chris Budeski Number Of Chambers Required: 36 Project Location: Montana Number Of End Caps Required: 12 Measurement Type: Imperial Chamber Rows: 6 Required Storage Volume: 2931 cubic ft. Maximum Length: 50.23 ft. Stone Porosity: 40°r6 Maximum Width: 30 ft. Stone Foundation Depth: 6 in. Approx.Bed Size Required: 1506.94 square ft. Stone Above Chambers: 6 in. Average Cover Over Chambers: 18 in. System Components Design Constraint Dimensions: (50 ft.x 54 ft.) Amount Of Stone Required: 134.14 cubic yards Volume Of Excavation(Not Including 195.34 cubic yards Fill): Non-woven Geotextile Required (ex- 476.73 square yards cluding Isolator Row): Non-woven Geotextile Required(Iso- 47.25 square yards lator Row): Total Non-woven Geotextile Required:523.99 square yards Woven Geotextile Required(excluding39.58 square yards Isolator Row): Woven Geotextile Required(Isolator 29.53 square yards Row): Total Woven Geotextile Required: 69.12 square yards EMBEDMENT STONE SHALL BE A CLEAN,CRUSHED AND ANGULAR GRANULAR WELL-GRADED SOIUAGGREGATE MIXTURES,�35% STONE WITH AN AASHTO M43 DESIGNATION BETWEEN N3 AND#57 1 FINES,COMPACT IN 6-(150 mm)MAX LIFTS TO 95%PROCTOR CHAMBERS SHALL MEET THE REQUIREMENTS FOR DENSITY SEE THE TABLE OF ACCEPTABLE FILL MATERIALS ASTM F2418 POLYPROPLENE(PP)CHAMBERS OR ASTM F922 POLYETHYLENE(PE)CHAMBERS CHAMBERS SHALL BE BE DESIGNED IN ACCORDANCE WITH ASTM F2787 ` 'STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC ADS GEOSYTHEIICS 6017 NON-WOVEN \ CORRUGATED WALL STORMWATER COLLECTION CHAMBERS' FX GEOTTILE ALL AROUND CLEAN,CRUSHED, PAVEMENT LAYER(DESIGNED \\\ ANGULAR EMBEDMENT STONE BY SITE DESIGN ENGINEER) (450 mm)MIN Rom) 6.Imam)MIN PERIMETER STONE - (760 mm) EXCAVATION WALL (CAN BE SLOPED OR VERTICAL) DEPTH OF STONE TO BE DETERMINED BY SITE DESIGN ENGINEER 6'(150 mm)MIN 12-(300mm)MIN--r� END SITE DESIGN ENGINEER IS RESPONSIBLE FOR 6' S1'(1295 mm) 12'(300 mm)TYP THE ENSURING THE REQUIRED BEARING (150 mm)MIN CAPACITY OF SUBGRADE SOILS 'MINIMUM COVER TO BOTTOM OF FLEXIBLE PAVEMENT.FOR UNPAVED INSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR.INCREASE COVER TO 24-(600 MM) Project: Autumn Grove - Basin B StormTech- Chamber Model- SC-740 DBOOM-xWrum•water aA&W Units- l Im eria (� Click Here for_Metric A dnisinn of Number of chambers- 36 Voids in the stone(porosity)- 40 % Base of Stone Elevation- 10000 ft Amount of Stone Above Chambers- 6 in Include Perimeter Stone in Calculations Amount of Stone Below Chambers- - in Area of system- sf Min.Area- 1217 sf min. area StormTech SC-740 Cumulative Storage Volumes Height of Incremental Single Incremental mental Incremental Ch Cumulative System Chamber Total Chamber � Stone & St Chamber Elevation (inches) cubic feel) (cubic feet) (cubic feel) (cubic feel) (cubic feel) (feet) 42 0.00 0.00 50.23 50.23 3102.34 103.50 41 0.00 0.00 50.23 50.23 3052.10 103.42 40 0.00 0.00 50.23 50.23 3001.87 103.33 39 0.00 0.00 50.23 50.23 2951.64 103.25 38 0.00 0.00 50.23 50.23 2901.40 103.17 37 0.00 0.00 50.23 50.23 2851.17 103.08 36 0.05 1.98 49.44 51.42 2800.94 103.00 35 0.16 5.87 47.89 53.75 2749.52 102.92 34 0.28 10.15 46.17 56.32 2695.76 102.83 33 0.60 21.74 41.54 63.28 2639.44 102.75 32 0.80 28.86 38.69 67.55 2576.16 102.67 31 0.95 34.22 36.54 70.77 2508.61 102.58 30 1.07 38.68 34.76 73.44 2437.84 102.50 29 1.18 42.50 33.23 75.73 2364.40 102.42 28 1.27 45.56 32.01 77.57 2288.67 102.33 27 1.36 48.78 30.72 79.50 2211.10 102.25 26 1.45 52.35 29.29 81.64 2131.60 102.17 25 1.52 54.89 28.28 83.17 2049.95 102.08 24 1.58 56.96 27.45 84.41 1966.79 102.00 23 1.64 59.12 26.58 85.71 1882.38 101.92 22 1.70 61.18 25.76 86.94 1796.67 101.83 21 1.75 63.11 24.99 88.10 1709.73 101.75 20 1.80 64.90 24.27 89.17 1621.63 101.67 19 1.85 66.78 23.52 90.30 1532.46 101.58 18 1.89 68.15 22.97 91.12 1442.15 101.50 17 1.93 69.62 22.38 92.01 1351.03 101.42 16 1.97 71.10 21.79 92.89 1259.02 101.33 15 2.01 72.36 21.29 93.65 1166.13 101.25 14 2.04 73.62 20.79 94.41 1072.48 101.17 13 2.07 74.70 20.35 95.05 978.08 101.08 12 2.10 75.78 19.92 95.70 883.02 101.00 11 2.13 76.74 19.54 96.28 787.32 100.92 10 2.15 77.54 19.22 96.76 691.04 100.83 9 2.18 78.37 18.88 97.26 594.29 100.75 8 2.20 79.14 18.58 97.72 497.03 100.67 7 2.21 79.46 18.45 97.91 399.31 100.58 6 0.00 0.00 50.23 50.23 301.40 100.50 5 0.00 0.00 50.23 50.23 251.17 100.42 4 0.00 0.00 50.23 50.23 200.93 100.33 Appendix D — Stormwater Maintenance Plan STORM WATER MAINTENANCE PLAN Autumn Grove Condominium Owner's responsibility for routine inspection and maintenance 1. Keep the inlets of the facilities free of leaves,rocks,and other debris. 2. See that litter and other debris are removed from inlets, swales, and vegetated and paved areas. 3. Maintenance of the underground systems are as follows: • Per StormTech Maintenance Recommendations • Minimum required maintenance includes a quarterly inspection during the first year of operation and a yearly inspection thereafter. Utilize inspection ports for inspections. • The inspection ports can be used to pump water into the system and re- suspend accumulated sediment so that is may be pumped out. Flush and pump as inspections deem necessary. • Utilize the adjacent upstreann storm sewer manhole for removal (vacuuming) of debris from the end of the storm drain at the connection point with the underground chamber. 4. Owner to maintain and fund Operation and Maintenance of stormwater facilities. TruNorth,Owner GWADISON ENGINEERING\PROJECTS\2021\21-104 Autumn Grove Condominium\Storm\STORMWATER MAINTENANCE PLAN.doc StormTecft4 Delenlion•Retention•Recharge Subsurface Stormwater Management" ,sue ' r .iv M • �-- r fr�rl k� r Is olatorTM Row 08A4 Manual StormTech' Chamber System for Stormwater Management 1.0 The Isolator"' Row 1.1 INTRODUMON The Isolator Row is typically designed to capture the An important component of any Stormwater Pollution "first flush" and offers the versatility to be sized on a vol- Prevention Plan is inspection and maintenance.The ume basis or flow rate basis.An upstream manhole not StormTech Isolator Row is a patent pending technique only provides access to the Isolator Row but typically to inexpensively enhance Total Suspended Solids (TSS) includes a high flow weir such that storm water flowrates removal and provide easy access for inspection and or volumes that exceed the capacity of the Isolator Row maintenance. overtop the over flow weir and discharge through a manifold to the other chambers. The Isolator Row may also be part of a treatment train. j! I By treating storm water prior to entry into the chamber %'' \�`• system,the service life can be extended and pollutants \I such as hydrocarbons can be captured. Pre-treatment !' best management practices can be as simple as deep sump catch basins,oil-water separators or can be inno- vative storm water treatment devices.The design of r1 the treatment train and selection of pretreatment devices by the design engineer is often driven by regulatory 1 requirements.Whether pretreatment is used or not,the ' Isolator Row is recommended by StormTech as an effective means to minimize maintenance requirements and maintenance costs. Note:See the StormTech Design Manual for detailed Looking down the Isolator Row from the manhole opening, woven information on designing inlets for a StormTech system, geolextile is shown between the chamber and stone base. including the Isolator Row. 1.2 THE 190LATOR"ROW StormTech Isolator Row with Overflow Spillway (not to scale) The Isolator Row is a row of StormTech chambers, either SC-740 or SC-310 models,that is surrounded with filter OPTIONAL fabric and connected to a closely located manhole for PRE-TREATMENT easy access. The fabric-wrapped chambers provide for settling and filtration of sediment as storm water rises in STORMTECH the Isolator Row and ultimately passes through the filter ISOLATOR ROW fabric.The open bottom chambers and perforated side- walls allow storm water to flow both vertically and horizon- tally out of the chambers. Sediments are captured in the Isolator Row protecting the storage areas of the adja- MANHWITH cent stone and chambers from sediment accumulation. OVERFLOW WEIR Two different fabrics are used for the Isolator Row. A woven geotextile fabric is placed between the stone and the Isolator Row chambers.The tough geotextile provides a media for storm water filtration and provides ECCENTRIC a durable surface for maintenance operations. It is also HEADER designed to prevent scour of the underlying stone and remain intact during high pressure jetting.A non-woven fabric is placed over the chambers to provide a filter media for flows passing through the perforations in the sidewall of the chamber. OPTIONAL ACCESS STORMTECH CHAMBERS 2 Call StormTech at 888.892.2694 or visit our website at www.stormtech.com for technical and product information. 2.0 Isolator Row Ins pection/Maintenance Storm Tech- 2.1 I NSPECII ON The frequency of Inspection and Maintenance varies by location.A routine inspection schedule needs to be established for each individual location based upon site specific variables. The type of land use (i.e. industrial, commercial residential), anticipated pollutant load, per- cent imperviousness, climate, etc. all play a critical role in determining the actual frequency of inspection and ? maintenance practices. At a minimum, StormTech recommends annual inspec- tions. Initially,the Isolator Row should be inspected every 6 months for the first year of operation. For subsequent years,the inspection should be adjusted based upon previous observation of sediment deposition. The Isolator Row incorporates a combination of standard ~ ' manhole(s)and strategically located inspection ports (as needed).The inspection ports allow for easy access Examples of culvert cleaning nozzles appropriate for Isolator Row to the system from the surface, eliminating the need to maintenance.(These are not StormTech products.) perform a confined space entry for inspection purposes. Maintenance is accomplished with the JetVac process. If upon visual inspection it is found that sediment has The JetVac process utilizes a high pressure water noz- accumulated, a stadia rod should be inserted to deter- zle to propel itself down the Isolator Row while scouring mine the depth of sediment.When the average depth and suspending sediments.As the nozzle is retrieved, of sediment exceeds 3 inches throughout the length of the captured pollutants are flushed back into the man- the Isolator Row, clean-out should be performed. hole for vacuuming. Most sewer and pipe maintenance companies have vacuum/JetVac combination vehicles. 2.2 MAINTENANCE Selection of an appropriate JetVac nozzle will improve The Isolator Row was designed to reduce the cost of maintenance efficiency. Fixed nozzles designed for cul- periodic maintenance. By"isolating" sediments to just verts or large diameter pipe cleaning are preferable. one row, costs are dramatically reduced by eliminating Rear facing jets with an effective spread of at least 45" the need to clean out each row of the entire storage are best. Most JetVac reels have 400 feet of hose allow- bed. If inspection indicates the potential need for main- ing maintenance of an Isolator Row up to 50 chambers tenance, access is provided via a manhole(s) located long.The JetVac process shall only be performed on on the end(s)of the row for cleanout. If entry into the StormTech Isolator Rows that have AASHTO class 1 manhole is required, please follow local and OSHA rules woven geotextile(as specified by StormTech)over for a confined space entries. their angular base stone. StormTech Isolator Row(not to scale) COVER ENTIRE ROW WITH AASHTO M288 12"MIN ID 25"MAX OD PIPE INSPECTION PORT CLASS 2 NON-WOVEN GEOTEXTILE SET 1.5"FROM BOTTOM LOCATION PER / SC-740—8'WIDE STRIP -STORMTECH OF CHAMBER ENGINEER'S DRAWING SC-310—5'WIDE STRIP J ENDCAP CATCH - -d BASIN -I OR _ ANHOL Ed 2FT MINI -I . SUMP '-WOVEN GEOTEXTILE THAT MEETS AASHTO M288 CLASS 1 REQUIREMENTS,BETWEEN STONE BASE AND CHAMBERS SC-740—5'-6'W I DE STRIP SC-310—4'WIDE STRIP Call StormTech at 888.892.2694 or visit our website at www.stormtech.com for technical and product information. 3 3 .0 Isolator Row Step By Step Maintenance Procedures Step 1) Inspect Isolator Row for sediment StormTech Isolator Row(not to scale) A) Inspection ports(if present) �faf 2 1)A) i. Remove lid from floor box frame ii. Remove cap from inspection riser iii. Using a flashlight and stadia rod, measure depth of sediment and record results on maintenance log. iv. If sediment is at,or above, 3 inch depth proceed to Step 2. If not 4� proceed to step 3. B)All Isolator Rows i. Remove cover from manhole at upstream end of Isolator Row ii. Using a flashlight, inspect down Isolator Row through outlet pipe 1.Mirrors on poles or cameras may be used to avoid a confined space entry 2.Follow OSHA regulations for confined space entry if entering manhole iii. If sediment is at or above the lower row of sidewall holes(approximately 3 inches)proceed to Step 2. If not proceed to Step 3. Step 2)Clean out Isolator Row using the JetVac process A)A fixed culvert cleaning nozzle with rear facing nozzle spread of 45 inches or more is preferable B)Apply multiple passes of JetVac until backflush water is clean C)Vacuum manhole sump as required Step 3)Replace all caps, lids and covers, record observations and actions Step 4) Inspect&clean catch basins and manholes upstream of the StormTech system Sample Maintenance Log Stadia Rod Readings Sediment Date Fixed point point Depth Observations/Actions Inspector to chamber to .. . .. sediment 3/15/01 6.3 ft. none Newinstallation.Fixed pant is ci frameat grade djm 9/24/01 62 0.1ft. Some grit felt sm 6/20/03 5B 0.5 ft. Mucky feel,debris visible in manhole and in ry Isolator rang maint enanoe due 7/7/03 6.3 ft. 0 System jet ted and vacuumed djm StormTech Detention•Retention•Recharge Subsurface Stormwater Management' 20 Beaver Fbad,Suite 104 Wethersfield Connecticut 06109 860.529.8188 888.892.2694 I fax 866.328.8401 www.stormtech.com StormTech products are covered by one or more of the following patents: U.S.Patents:5,401,459;5,511,903;5,716,163;5,588,778;5,839,844; Canadian Patents:2,158,418 Other U.S.and Foreign Patents PendingPrinted in U.S.A. 0 Copyright.All rights reserved.StormTech LLC,2004 S090104-1