HomeMy WebLinkAbout011 Cash in Lieu of Water Rights Correspondence erik@mad-enq.com
From: Griffin Nielsen <GNielsen@BOZEMAN.NET>
Sent: Thursday, December 2, 2021 10:47 AM
To: erik@mad-eng.com
Subject: RE: Autumn Grove Condominiums - Cash-in-Lieu of water rights.
Attachments: Ph 5.pdf; Untitled attachment 00480.txt; Untitled attachment 00483.htm
Erik,
Below is the preliminary determination for the project, I've attached the existing credit information for reference as
well. The existing credit should cover the project however please let me know when the site plan has been submitted so
I can log the irrigation demands.
Project: _ Autumn Grove SP
Project No: RL TBD
Date: - 12/2/2021
Preliminary Determination
Use Use Area Residential Unit Water Demand Unit Water
sq.ft_ Units lgai/yr/1,000 sq.ft. AF/resident
Multi Family Units
Irrigation
Total
less CILWR Credit from Annex or Subdivision
Net Volume for CILWR
Prelim CILWR Fee-P2==PRO/ECT NAME LEI$6y000/AF••
•$6,000/AF CIL water rights value established by City Commission Resolution No.4095
Thanks,
City of Bozeman MT
Griffin Nielsen, PEA Engineering Department
406.582.2280
gnielsen(a,bozeman.net
From:erik@mad-eng.com<erik@mad-eng.com>
Sent: Monday, November 22,2021 11:49 AM
To:Griffin Nielsen<GNielsen@BOZEMAN.NET>
Subject:Autumn Grove Condominiums-Cash-in-Lieu of water rights.
CAUTION:This email originated from outside of the organization.Do not click links or open attachments unless you recognize the
sender and know the content is safe.
1
Griffin,
Attached above is the Autumn Grove Condominiums CILWR. Let me know if you have any questions. I am currently just
trying to gather all the respective information to submit for site plan review for Autumn Grove.
If you need any additional information feel free to ask.
Erik Ringsak,El,CMI
Madison Engineering, LLC
895 Technology Boulevard,Suite 203
Bozeman, MT 59718
406.586.0262 office
erik@mad-ens.com
M
hUDISON
ENGINEERING
2
Thu 12,r2,r'2021 1 1:47 rL,4
G N Griffin Nielsen <GNiefsen@ BOZEMAN.NET>
RE: Autumn Grove Condominiums - Cash-in-Lieu of water rights.
ro ehkL mad-eng,com
® Ph S.pdf Untitled attachment 00480,txt Untitled attachment 00483,htm
pdf File .txt File htm File
Erik,
Below is the preliminary determination for the project, I've attached the existing credit information for reference as well.The existing credit should cover the project hog
submitted so I can log the irrigation demands.
Project: Autumn Grove SP
Project No: TSD
Date: 12/2/2021
Preliminary Determination
Use Use Area Residential Unit Water Demand Unit Water Demand Estimated Water Volume
sq.ft. Units gal/yr/1.000 sq.ft. AF/resiclential unit gal/yr AF/ r
multi Family Units �.I« 5.83
Irrngation TSD From Landscape Plan
Total 5.83
less CILWR Credit from Annex or Subdivlslon 11.72
Net Volume for aLWR -5.89
Prelim CILWRFee- P`21=1PROJECTNAME @$6,000/AF••
This sheet is included to show the entire table that was previously cut off in the email correspondence between Erik
Ringsak of Madison and Griffin Nielsen of the City of Bozeman.
THE CITY OF BOZEMAN
20 E. OLIVE - P.O. BOX 1230
BOZEMAN, MONTANA 59771-1230
88 ENGINEERING DEPARTMENT
Co. 0 PHONE: (406) 582-2280 FAX: (406) 582-2263
Date: -October 29, 2008
0
?, . d I-I XT.
CASH IN LIEU OF WATER .0 I.0
For a Residential Property
Uk UiM
T 1
Project Name: -West Winds, Ph 5 J)
Applicant Name.- HKM Engineering
Applicant Address: 920 Technology Blvd, Ste A
Bozeman, Montana 59718 iot,1
Area: -13,969 acres V):
Zoning:
Water diversion requirenior;t�. based on zoning
(some,ound.nQ in the fD11owino figures t vvjt use6 in the c2lculabon of the final dollar amount)
13.969 acres X 6.371 units per acre = 89.00 dwelling units
89 units X 2.5 per/unit = 222.5 persons
222.5 persons X 135 gpcd X 365 day/year = 10,963,688 gallons per year
33.64 acre feet per year
Cash-in-lieu amount 33.64 ac-ft X $30.55/ac-ft X 11.7668
TOTAL CASH-IN-LIEU AMOUNT: $12,092.76
NOTE: The value calculated for the cash-in-lieu amount is equal to the City's
expenses for an equivalent amount of water, on an annual basis, drawn
from Hyalite Reservoir. This expense is calculated on the City's annual
payments to the Middle Creek Water User's Association of$30.55 per
acre-foot, at present worth, based on the 40-year rehabilitation loan @
8.125%.
HOME OF MONTANA STATE UNIVERSITY
GATEWAY TO YELLOWSTONE PARK