September 8, 2021
City of Bozeman
Planning Department
Bozeman, MT 59715
Re: 145 Simmental Way Warehouse
Please find attached a site plan submittal for the property at 145 Simmental Way in Bozeman. The
property currently includes three self-storage buildings, two of which will be removed to construct the
proposed building. The parcel is a part of a larger development that includes fabrication and
warehousing in support of property owner’s business -The Flooring Place. The property is zoned M-1.
The property owners are in need of additional warehouse storage space to accommodate their growing
business. They also are confronted regularly with employee recruitment and retention challenges due
to the high cost of housing. The submittal includes 3 apartment units that would be rented to
employees of the owner’s business to help recruit and retain employees.
The existing primary access to the commercial property is located off Simmental Way. We are
proposing to continue to utilize this access for the proposed commercial warehousing as well as
provide an additional access off Boothill Court to service the parking for the residential units.
Parking:
The Cover Sheet outlines the parking required and provided based the entirety of the site.
Residential Open Space: 150 sq. ft. / unit is required = 450 sq. ft. required. We are providing 1,000 sq.
ft. of functional residential open space.
Thank you,
Randy Visser
visser architects p.c.
163 quiet water way
manhattan, mt 59741
ph. (406) 282-9922
mobile (406) 580-6327
Page 1 of 5
March 31, 2021
Visser Architects
Attn: Randy Visser
163 Quiet Water Way,
Manhattan, MT 59741
randy@visserarchitects.com
RE: 1891 Boothill Court, Concept Review, Application 21087
Project Description: This is a Conceptual Review application for advice and comments proposing
the construction of a new warehouse building with accessory apartments on the second floor.
Project Location: 145 Simmental Way. Bozeman, MT 59715
We hope that these notes and suggestions assist you with the design and review of this potential
future project. Please note that comments are preliminary and based on information provided.
While we attempt to identify all issues during a conceptual review, please keep in mind that there
may be other issues that arise during the formal review. We appreciate your patience in the
review process. All references below to Sections of the Bozeman Municipal Code. If you have any
questions or concerns or would like to set up a meeting, please do not hesitate to contact me at
406-582-2261.
Sincerely,
Jacob Miller, Assistant Planner
Department of Community Development
Page 2 of 5
Applicant Questions:
1. The feasibility of the project as a whole:
a. The project is feasible but we will need to see a complete application.
2. Any anticipated hurdles to the proposed development:
a. None
3. The process to obtain approvals:
a. Submit Site Plan for review 15 working days from acceptability. Building permits
may be submitted concurrently when Site Plan is in final stages.
4. Is there a route by which 6-8 units of residential development could be provided within
the proposed building or on the property as a whole?
a. Yes, the only requirements for accessory apartments in M-1 is that they be on the
second or subsequent floors and be less than 50% of the gross square footage.
Parking and open space requirements are still applicable.
Planning Division, Jacob Miller, jamiller@bozeman.net, 406-582-2261
1. Sec. 38.220.080. - Site plan submittal requirements.
a. Please provide landscaping plan, elevations, utility plan, electrical/lighting plan
and all other required application materials with the site plan submittal.
b. Dimension parking stalls, commercial drive access width and separation from
intersection.
2. Sec. 38.510.030. - Block frontage standards.
a. Provide transparency calculations for the buildings facing a street.
b. Provide weather protection
3. Sec. 38.520.070. - Location and design of service areas and mechanical equipment.
a. Where will the utility meters, mechanical equipment and service areas be
located? Landscape screening is required when visible from the right-of-way or
internally.
4. Sec. 38.520.040. - Non-motorized circulation and design.
a. The pathways adjacent to the parking on the west side of the proposed
buildings must be a minimum 7’ to account for vehicle overhang.
5. Sec. 38.520.060. - On-site residential and commercial open space.
a. Please provide amenities for the open space area that meet the criteria listen
in the above reverenced section. Staff recommends at least two different areas
for seating such as a picnic table and a bench, and a dog waste receptacle with
bags if pets will be allowed.
Engineering Division, Cody Flammond, cflammond@bozeman.net, 582-2287
- Awaiting Comments
Fire Division, Scott Mueller, smueller@bozeman.net, 582-2353
1. If spaces for warehouse are not separated from each other as stated then total footage
is over 12,000 square feet. Then overall building will require fire
Page 3 of 5
sprinklers. Subsequently riser room to exterior with sidewalk to public way. FDC/Horn
and Strobe placed on accessible building front.
2. Proper fire separations designed between warehouse and residential units.
NWE Project Engineer Kory Graham Kory.Graham@northwestern.com
1. Will the new facility need electric and/or gas services?
2. If so will the services to the warehouse be metered independent of the employee
residential meters?
3. With the demolition of the existing structure in phase 2, the applicant needs to, weeks
in advance of the scheduled demolition, contact NorthWestern Energy for a disconnect
of the electric and gas services.
4. Service & Meter Location. The electric meter & or CT cabinet will need to be installed in
the same general location within 10-feet of the gas meter. NorthWestern Energy
reserves the right to specify the location of our meters. All meters are to be located
outdoors on the corner or in a location on the building closest to the transformer or
secondary junction can serving the building unit. On new construction, electric meter
locations must be within 10 feet of the gas meter if NorthWestern Energy will be
providing both electric and gas service. Meter locations will need to be approved by
NWE. NWE policy is to maintain a minimum 30-inches wide by 3-feet clear zone
between the front of the meter and landscape screening or wall screening for self-
contained meter bases and 48-inches for installations requiring cabinets. Location of the
meter(s) shall allow easy access to the meters for operation and maintenance. This can
be determined through the design process after an application is submitted through
NWE and the area project engineer will work through allowable shrubs and plants for
screening and to determine adequate clearances for access to our meters.
5. Gas meters. The following applies to all buildings in regards to the gas regulator. The gas
regulator cannot be placed under a window or within 3’ of the operable portion of the
window. It can be placed under a window/deck on the second story, provided the
“open/operable” portion has at least 6’ of clearance from the regulator. Ensure that
there is 10’ of separation from any mechanical air intake, including air conditioning
units. The regulator will need to be 3’ from the closest corner of any portion of the
electric meter base.
6. Buildings with multiple units will need multiple meters which will need to be installed
within the same location. With multiple meters, adequate wall space will be needed to
install the number of electric and gas meters, and electric gear. For gas meters, NWE will
only stack gas meters 2 high and therefore the needed wall space for gas meters will
require a longer wall space. The two areas for gas and electric meters will need to
occupy the same wall space, unless otherwise approved by a NWE project engineer,
with the needed separation between gas and electric meters.
7. When there are multiple units with multiple meters NWE requires that the meters have
a permanent placard for each meter. For multiple metering each location or premise
must have its address and unit numbers permanently attached by means of a placard to
the meter bases and the individual apartment /unit breaker boxes before the meter is
Page 4 of 5
set. These identifying placards must match the unit information as displayed on the
unit’s entry door.
8. Utility easements. Any extension of gas main or electric primary will need to be installed
within an easement. Normally a 10-foot easement is required. Any extension of gas
main or electric primary will need to be installed within an easement. To establish the
needed utility easement locations the NWE project engineer will help to establish these
locations using the latest site plan and finalized location of gas and electric meters. If an
easement will need to cross property other than the applicants, negotiations and costs
between other landowners for such easements is entirely the applicant’s
responsibility.
9. Applicant needs to show proposed meter screening methods for the NWE engineer to
review. If using a screening wall a drawing of the screening wall need to be reviewed
and approved by NWE for underground utility installation under the wall and access for
operation and maintenance lines and equipment.
10. Screening Walls.
a. Gas service cannot penetrate foundation walls that are attached to the building
foundation per the International Fuel Code. Gas riser need to penetrate the
building above ground. However, if the foundation is not attached to the
building i.e. the foundation wall is isolated from the building for just supporting
the wall, this is acceptable.
b. If this is a free standing foundation wall, a knock-out must be provided that is a
min of 2’x2’ but may be required that the knockout be larger on the electric
service depending on the meter base amperage. Consult NWE for proper sizing
of knock-out
c. Contact NWE for placement of knock-out to insure that it lines up properly with
the termination location to prevent bends in the service
d. Screening must meet the clear zone requirement of NWE Electric Service
Requirements which typically for commercial application is 48” from the face of
the electric meter.
e. Gas meter cannot be located in recessed location where it is not open
atmosphere above the meter without approval from NWE.
f. Screening cannot consist of rolling doors or other devices that are required to
be open to access the meters.
11. Transformer location to a structure. One single phase transformer should be sufficient
to service both buildings. Placing the transformer at a location between the two
buildings the phase1 the 4-plex can be connected. From the transformer install electric
conduit stubs and a gas stub five feet north of the turnaround for the phase 2 building. If
the buildings should requiring 3 phase power, a transformer pad site should be planned.
Typical 3-phase pad is going to be a 7’x7’ pad. For oil filled transformers a 2-foot
clearance is required to non-combustible walls and surfaces that do not have any
openings such as doors, windows, air intake, and fire escapes routes and meets current
NEC or NFPA requirements for non-combustible material. For transformers 750kVA &
larger a 3-foot 6-inch clearance is required and 10-feet of clearance is required on the
Page 5 of 5
front side of the pad, where the transformer doors are located. For any combustible
surface, not meeting current NEC or NFPA requirements for non-combustible material, a
minimum of a 10-foot clearance is required between the building or any combustible
surface and the transformer. All distances are referenced to the edge of the pad. For
planting of bushes or shrubs a Minimum Working Space for a Pad-Mounted
Transformer, is 4-feet on the sides and back portion of the concrete pad and 10-feet of
clearance on the front side of the pad where the transformer doors are located. Note,
all distances are referenced to the edge of the pad. Due to COVID-19 there has been an
impact on receiving larger three phase and single phase transformers and a longer
timeline may be needed to receive the needed equipment for such services. It is
important to submit an application to NWE and provide the calculated loads as soon as
possible to avoid any delays. The NWE project engineer will help to determine the
appropriate location for the transformer.
12. Landscaping. No large, deep rooted trees or bushes will be allowed within the 10-foot
utility easement. No large trees reaching heights of 15-feet or taller will be allowed
under any overhead distribution lines. All other approved landscaping will be placed so
as not to damage, prevent or hinder operation and maintenance of NWE utilities.
13. NorthWestern Energy has existing utilities within the area and should be able to provide
single phase or three phase electric and gas. Submit an application online to have the
NWE project engineer work with the applicant. Go to
www.northwesternenergy.com/construction to apply online Montana Construction
Application, and access Montana New Service Guide to provide information on electric
and gas service requirements. Once an application is submitted the NWE project
engineer will be in contact with the applicant.
These Divisions did not provide comment. Contact reviewers directly with individual questions.
1. Stormwater Division; Kayla Mehrens, jkmehrens@bozeman.net, 406-582-2270
2. Water and Sewer Division; John Alston, jalston@bozeman.net, 406-582-320
3. Sustainability Division; Natalie Meyer, nmeyer@bozeman.net, 406-582-2317
4. Building Division; Ben Abbey babbey@bozeman.net, 406-582-2950
5. Parks and Recreation; Addi Jadin, ajadin@bozeman.net, 406-582-2908
6. Solid Waste Division; Russ Ward, rward@bozeman.net, 406-582-3235
2304 N. 7TH AVENUE | SUITE L | BOZEMAN, MT 59715 | (406) 587-2781
Professional Consulting Engineers and Land Surveyors
Equal Opportunity Employer | www.hyaliteeng.com
PLANNING COMMENTS
1. Sec. 38.220.080- Site Plan Submittal Requirements
a. All applicable materials have been included.
b. Dimensions have been included with the parking stalls and commercial drive access
points.
4. Sec. 38.520.040- Non-motorized circulation and design
a. The sidewalk on the west side of the building, adjacent to the parking is 7’ in width.
ENGINEERING COMMENTS
General
1. Noted, an executed Waiver of Right to Protest will be recorded for the required items prior
to Site Plan Approval. Can you provide a blank template that we could utilize moving
forward?
2. Noted, thank you for the heads up.
3. Noted, see the included correspondence on the payback district.
Transportation
1. Master Planning: Boothill court will be upgraded to a City standard local street along the
block frontage on our side of the street.
2. Master Planning: Noted, 5’ of additional ROW is shown on the plans.
3. BMC 38.400.070: City standard streetlights are shown along Boothill Court as well as at
the intersection.
4. BMC 400.080.A: A City sidewalk has been shown along the Boothill Court frontage.
5. BMC 38.400.090.D.2: Noted, the proposed drive approach is right at 40’ from the edge of
the Simmental ROW.
6. BMC 38.220.080 (A) 2.g: Noted, a peak hour trip generation was submitted and we are
awaiting a response. It is anticipated, based on the low number of trips generated, that a
TIS will not be required.
Water & Wastewater
1. Utility Plan: The necessary existing pipe sizes and types are shown on the existing
conditions sheet. For the sewer tie-in, the sewer main is approximately 11.6’ deep so at
a 2% slope, leaves an approximate depth of 9.97’ at the building.
2. DSSP.V.A: No additional fire flow is necessary to serve this development, however, the
max day demand is within the included Water & Sewer Memo.
3. DSSP.V.B: The peak hour sanitary sewer demand is also noted within the included Water
& Sewer Memo.
Stormwater
1. DSSP Section (A)(4) Water Quality: See the included grading and drainage plan, as well as
the associated stormwater engineering report for the site.
2. DSSP Section (C) Water Quantity: See the included grading and drainage plan, as well as
the associated stormwater engineering report for the site.
3. Montana Post-Construction Storm Water BMP Design Guidance Manual- Seasonal High
Groundwater: Noted and agreed. Based on well log data from the Flooring place, static
water level sits around 7’ deep, and with the truck loading ramps near 2.5’ below EG, gives
Re: 145 Simmental
Site Plan Application
September 15, 2021
Page 2 of 2
D:\Users\Randy\Documents\JOBS\2108_FLOORING PLACE\INCOMING CIVIL\9-15-21\0.0_ Response Items.docx
4.5’ of separation between the static groundwater level and the lowest elevation on the
site. As construction/demolition begins, a test pit will be dug to verify.
Dry Utilities
1. SP Utility Plan: See the included utility plan for preliminary routing.
Site Layout & Grading
1. BMC 38.540.020 Parking:
a. Surfacing- Noted, surfacing for the parking lot will be asphalt.
b. Snow Removal- See the architectural & landscape site plans for the snow removal
areas.
c. Street Vision Triangles- Street Vision Triangles are shown on the Civil sheets.
Water Rights
1. BMC 38.410.130: Mr. Nielsen has been contacted and a response will be forwarded once
received. The email correspondence to date has been included.