Loading...
HomeMy WebLinkAbout12--DEM Checklist1 | P a g e 209 S. 8th Residences – DEM Checklist 1.Project Narrative is included in submittal. Please see 03--Project Narrative 01-03-2022. 2.Historical information is included in submittal. Please see Montana Historical and Architectural Inventory Card. 3.Existing Images included in submittal. Please see 08--Existing Images 01-03-2022. 4.Please see sheet A1.1 in Plan Set. 5.Please see sheets D1.1 and D6.1 in the Plan Set. 6.No non-confirming structure demolition planned. 7.Noticing certificate N1 and Materials included in submittal. Please see 14--Property Owner List 01-03-2022. 8. Building is not classified as contributing to the historic district. 03/22/22 22003 209 S. 8th Avenue NCOA