Loading...
HomeMy WebLinkAbout04-07-22 Public Comment - K. May - Griffin Road ClosuresFrom:Kristi May To:Vale May Cc:Josh McKenzie Subject:Griffin Road Closures Date:Thursday, April 7, 2022 3:04:19 PM Attachments:CK_May_Griffin22_Revised.pdfGriffin Closurer Notification.docx CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. The second phase of the Griffin project has continued for the 2022 season. Please see the following attachment regarding construction on Griffin Drive. Thank you for your help and consideration. Kristi May www.ckmayexcavating.com PO Box 1426, Belgrade MT 59714 406-388-0015 RE: Griffin Drive and Manley Road Stormwater and Street Improvements To whom it may concern, CK May Excavating will be resuming work on the Griffin project March 28, 2022. Crews will begin work on the shoulders of the road, maintaining through access for vehicles. On April 5 we will begin pulverizing the existing asphalt. With the start of this work expect delays and one way traffic. Beginning April 11, we will begin installation of a new sewer main down the center of Griffin Drive, this will require a full closure from Industrial Drive to the west entrance of Northwestern Energy. Expect this closure to last for 3 weeks. For the remainder of construction expect one traffic with flaggers and partial closures for short to extended periods of time. Anticipated completion is fall of 2022. Regards, Vale May Operations Manager CK May Excavating Prepared By:TC Plan 2- East Griffin Drive Date: 3/22/22 Notes: Signs and Devices set to MUTCD and COB standards. Signs and Devices will be field fit should such conditions create the need. Contractor will Maintain access to local Business as needed. WORK AREA See Road closure detail page TCP2 See TC Shift detail page TCP3Manley Road ROAD CLOSED TYPE III BARRICADE WORK AREA ROAD CLOSEDTYPE III BARRICADE WORK AREA ROAD CLOSED TO THRU TRAFFICTYPE III BARRICADE GRIFFIN DR CLOSED USE ALT. ROUTE GRIFFIN DR CLOSED EAST OF MANLEY RD GRIFFINDETOURGRIFFINDETOURGRIFFINDETOURGRIFFINDETOURGRIFFIN DETOUR Northwestern Energy & AMR has been notified. Furthest west access will remail open. Plus, the entrance/ exit in the rear access off Manley Road.GRIFFINDETOURGRIFFINDETOURGRIFFINDETOURGRIFFIN DETOUR WORK AREAROADWORKAHEADROADNARROWS ROAD WORK AHEAD ROADWORKAHEADROADNARROWSTwo- Way Traffic w/ Divider Candles MAP KEY ROADWORKAHEADSPEEDLIMIT25SPEEDLIMIT25ENDROAD WORKSPEEDLIMIT35ENDROAD WORKSpeed Limit Sign Space Drum Taper (L)Cone Spacing Buffer Space MPH FEET FEET FEET FEET 25 100 125 25 50 35 100 245 35 100 Work Area ROADWORKAHEADBEPREPAREDTOSTOPROADWORKAHEADBEPREPAREDTOSTOPNotes: Flaggers will be used as needed within road closure to maintain one lane of travel as needed. Signs and devices will be set to MUTCD specifications. TC devices will be verified and fit in the field. One Lane Flagging Detail ( IF needed )SPEEDLIMIT25SPEEDLIMIT25Speed Limit Sign Space Cone Spacing Buffer Space MPH FEET FEET FEET FEET 25 100 125 25 50 35 100 245 35 100ENDROAD WORKSPEEDLIMIT35SPEEDLIMIT35ENDROAD WORKSPEEDLIMIT35Type III Barricades Used IF conditions warrant them. MUTCD & MDT do not require Type III in a Two Lane Flagger Controlled Lane Closure. Drum Taper (L)