Loading...
HomeMy WebLinkAboutResolution 3240 Approve alternation of contract for Teton Communications, Inc. ..-. -- ..-. -----.-. - -.. COMMISSION RESOLUTION NO. 3240 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH TETON COMMUNICATIONS, INC. WHEREAS, the City Commission did, on the 14th day of July 1997, authorize and approve that certain contract with Teton Communications, Inc., for the purchase and installation of an E911 Dispatch System; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Teton Communications, Inc., as contained in Change Orders Nos. 1,3,4,5,6,7,8,10,11,13 and 15, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change orders for and on behalf of the City; and the Clerk of the Commission is authorized and directed to attest such signature. PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 1 st day of June 1998. ~j1?p ~ ALF M. STI~F, Mayor ATTEST: (l~J Jdfr~ ROBIN L. SULLIVAN Clerk of the Commission APPROVED AS TO FORM: - --.- ~_.,-_.__.. . . I \ TETON COMMUNICATIONS, INCORPORATED PROJECT FIELD CHANGE ORDER CONTRACT: Gallatin Co. Bozeman FC0*: 1 DATE: 8/4/97 City E911 Division DESCRIPTION OF MATERIAL AND/OR LABOR CHANGE: Chang~ Logging Recorder from the Racal brand to the Eventide brand. This change has no effect on capability, but is in compliance with the contract to offer the newest/best technology as it becomes available. MATERIAL LIST CHANGE: EQUIPMENT LABOR Supply Eventide Logging Recorder ($5,000.00) -0- in lieu of the Racal Wordnet ~. ~ t~ f. i> ! T-- -.r COST TOTAL CHANGES: ($5,000.00) $ -0- - C 12. t '0 ) 'T-- SCHEDULE IMPACT: None APPROVALS: INC. GALLATIN COUNTY/BOZEMAN CITY E911 DIVISION REPRESENTATIVE ------ .- -., -..--..-.--- ______._...,,_._ ___._._n_____.".n_.". ____._.n._ _. .-.---.. ~_. - I ~ . .-:- ! ~ TETON COMMUNICATIONS, I NCORPORRTED PROJECT FIELD CHRNGE ORDER Gallatin County/Bozeman City CONTRACT: E-911 Division FC0": 3 DATE: 9/3/97 DESCRIPTION OF MATERIAL AND/OR LABOR CHANGE: Add 4 ea "Area" lights to each of the 4 console furniture positions. MATERIAL LIST CHANGE: EQUIPMENT LABOR 4 ea Watson Furniture Geneva Talk Lights $1050.00 0 COST TOTAL CHANGES: $ 1050.00 $ 0 SCHEDULE IMPACT: None APPROVALS: INC. GALLATIN COUNTY/BOZEMAN CITY , Eql1 DIVISION REPRESENTATIVE ....- ..-...". .....-.--.--- -.-.- ..-.-...-... ---.".--- ... .------.- _n..._..n_.._..._.__ .... .~~._. . -.-.-... .'-.-."" - ..-- . TETON COMMUNICATIONS, INCORPORATED PROJECT FIELD CHANGE ORDER CONTRACT: Gallatin Co/Bozeman City FC0tt: 4 DATE: 9/12/97 E-911 Division - DESCRIPTION OF MATERIAL AND/OR LABOR CHANGE: Delete one Personal Computer. To be replaced by a computer the county already owns. - . MATERIAL LIST CHANGE: EGlUIPMENT LABOR 1 Personal Computer -$1500.00 0 (credit) COST TOTAL CHANGES: . -1500.00 . 0 (credit) SCHEDULE IMPACT: None APPROVALS: I INC. GALLATIN COUNTY/BOZEMAN CITY I Eqll DIVISION REPRESENTATIVE .... -.-...-.-. .-..-'--. ....-.---... ---.---..-.-...--....... .----.-...-.... ---.... - ._._~~. . TETON COMMUNICATIONS, INCORPORATED PROJECT FIELD CHANGE ORDER CONTRACT: Gallatin Co/Bozeman City FC0tt: 5 DATE: 9/12/97 E-911 Division DESCRIPTION OF MATERIAL AND/OR LABOR CHANGE: Supply Watson Furniture for the 5th dispatch position to be located in the Supervisors Office. The Furniture is to be the same configuration~ style~ and color as the existing positions. MATERIAL LIST CHANGE: EQUIPMENT LABOR 1 Additional "Basic 5" Dispatchers Position $15~700.00 Included COST TOTAL CHANGES: . 15.700.00 . Included SCHEDULE IMPACT: Furniture & Radio Console Dilivery now set for October 20~ 1997 through Ocotber 24~ 1997. APPROVALS: I INC. GALLATIN COUNTY/BOZEMAN CITY Eq11 DIVISION REPRESENTATIVE I .----- __.._.u_ .--------..--.. .. -...-..--..-----...--..----- - , TETON COMMUNICATIONS, INCORPORATED PROJECT FIELD CHANGE ORDER CONTRACT: Gallatin Co/Bozeman City FC0tt: 6 DATE: 10/01/97 E-911 Division DESCRIPTION OF MATERIAL AND/OR LABOR CHANGE: Supply a reconditioned Zetron 640 Paging Terminal in lew of a New 640 Paging Terminal. MATERIAL LIST CHANGE: EQUIPMENT LABOR 640 (Reconditioned) 2500 None (Credit) ! COST TOTAL CHANGES: . 2500 (Credit) $ SCHEDULE IMPACT: None APPROVALS: INC. GALLATIN COUNTY/BOZEMAN CITY ,E911 DIVISION REPRESENTATIVE -.--.-- ... ,,---""'.. .----.-.- ---.---.-....- . - . -.....,....-. ".-.11 , , T~TON COMMUNICATioNs, tWCORPdRAtED PROJECT FIELD CHANGE ORDER I CONTRACT: Gallatin Co/Bozeman City 'FC0tt= 7 DATE: 10/01/97 E-911 Division DESCRIPTION OF MATERIAL AND/OR LABOR CHANGE: Add Signaling Lights at each Operator Position for: Telco off Hook Radio Transmitt "Help" .- MATERIAL LIST CHANGE: EQUIPMENT LABOR 1 Lot Signaling Lights Cables & Switches 600 1125 COST TOTAL CHANGES! $ 600 ~ 1125 SCHEDULE IMPACT, None APPROVALS: i TETON ~MM~C~ INC. I GALLATIN COUNTY/BOZEMAN CITY I REPRESENTATI....E E911 DIVISION REPRESENTAtIVE ...-..--. .- .~ TETON COMMUNICATIONS, I NCORPORRTED PROJECT FIELD CHANGE ORDER CONTRACT: Gallatin Co ./Bozeman City FC0tt: 8 DATE: 10/01/97 E-911 Division DESCRIPTION OF MATERIAL AND/OR LABOR CHANGE: Add a cable tray to the equipment room for routing of overhead cables. MATERIAL LIST CHANGE: EQUIPMENT LABOR 1 Lot Cable Ladder & Fittings 425 75 COST TOTAL CHANGES: $ 425 $ 75 SCHEDULE IMPACT: None APPROVALS: TETON ~7CA~ INC. GALLATIN COUNTY/BOZEMAN CITY REPRESENTATIVE Eqll DIVISION REPRESENTATIVE -. --------.- ----- ------- .. -.-.----------- .--'-".. .-.---.'.-'---"-- . ----..---- . TETON COMMUNICATIONS, INCORPORATED PROJECT FIELD CHANGE ORDER CONTRACT: Gallatin Co./Bozeman City FC0tt: 10 DOTE: 2/9/98 E911 Divsion - DESCRIPTION OF MATERIAL AND/OR LABOR CHANGE: Substitute different Headsets and Headset Cables as per the customer request, and price change. ...'-~ -. - ..-~.. ..~- -~...~. .. -- MATERIAL LIST CHANGE: EQUIPMENT LABOR Change from P10 adaptor 20ea to the SRS 1890-15 Headset Cable $30.00 None 10ea Substitute starset for standard "over the head" Headset. $20.00 None --- COST TOTAL CHANGESz . 800.00 . None SCHEDULE IMPACT: None APPROVALS: T INC. GALLATIN COUNTY/BOZEMAN CITY E911 DIVISION REPRESENTATIVE .-... ...---..----- .... . r TETON COMMUNICATIONS, INCORPORATED PROJECT FIELD CHANGE ORDER CONTRACT: GALLATIN CO/BOZEMAN CITY FC"": 11 DATE: 2/26/98 E-911 DIVISION DESCRIPTION OF MATERIAL AND/OR LABOR CHANGE: Add a Cable Tray to the Equipment Room for routing of overhead cables. above the Intergraph Equipment. MATERIAL LIST CHANGE: EQUIPMENT LABOR 1 Lot Cable Ladder & Fittings $475.00 $225.00 COST TOTAL CHANGES: . 47').00 $ 225.00 SCHEDULE IMPACT: NONE APPROVALS: TETON COMMUNICATIONS, INC. GALLATIN COUNTY/BOZEMAN CITY REPRESENTATIVE E911 DIVISION REPRESENTATIVE .---.---.--., .----- ....---....-...-.-- --.--....---- I -- -...."._'. TETON COMMUNICATIONS, INCORPORATED PROJECT FIELD CHANGE ORDER CONTRACT: GALLATIN CO/BOZEMAN CITY FC0tt: 13 DATE: 2/26/98 E-911 DIVISION DESCRIPTION OF MATERIAL AND/OR LABOR CHANGE: Supply and install a new 100 watt, 4 channel Tone ~emote Control Base Station at High Flat, to replace the old base. TIlis upgrade will eliminate the need for beep tone to be installed in the new consoles ~nd upgrade the current old equipment. MATERIAL LIST CHANGE: EQUIPMENT LABOR 1 Tait T800 100 watt VHF Base Station. Complete with: Lightning Arrestor and Jumper Cables Test & Repair cables Cabinet and Service Mic. $9877 . 00 $1725.00 . COST TOTAL CHANGES: .9877 .00 . 1725 . 00 SCHEDULE IMPACT: None APPROVALS: I I TETON COMMUNICATIONS, INC. GALLATIN COUNTY/BOZEMAN CITY I REPRESENTATIVE E911 DIVISION REPRESENTATIVE ... ..-.-.- . . TETON COMMUNICATIONS, INCORPORATED PROJECT FIELD CHANGE ORDER CONTRACT: GALLATIN CO/BOZEMAN CITY FCQJtt: 15 DATE: 2/27/98 E-911 DIVISION DESCRIPTION OF MATERIAL AND/OR LABOR CHANGE: Supply Computer Networking Furniture .~ . MATERIAL LIST CHANGE: EQUIPMENT LABOR 1 72" Heavy Duty Law Station Furniture Complete with: Casters AC Power Strips Wire Management Channel $170.00 Shipping & Delivery $2425.00 , COST TOTAL CHANGES: . 2425.00 . 170.00 SCHEDULE IMPACT: I APPROVALS: cr;~c#~ INC. GALLATIN COUNTY/BOZEMAN CITY TETON COMMUN CATIONS, REPRESENTATIVE E911 DIVISION REPRESENTATIVE I I --.-