Loading...
HomeMy WebLinkAbout004_ConstructionPlanTEMPORARY GRAVELACCESS CONSTRUCTIONENTRANCE (SEE DETAIL)CONTRACTOR STAGING/STORAGE AREA. PROVIDEBERM, INTERCEPTOR OR SILT FENCE AROUNDEXTERIOR OF STAGING AREA TO PREVENT OFF-SITEDISCHARGE OF STORM WATER. CONTRACTOR SHALLWORK WITH CITY OF BOZEMAN TO LOCATE ANDPROTECT IRRIGATION VALVES AND OTHER SYSTEMCOMPONENTS WITHIN THIS AREA. IRRIGATION POINTOF CONNECTION FOR PHASE 1 IMPROVEMENTSLOCATED WITHIN THIS AREA.SILTFENCE(TYP.)CHAIN LINKFENCE (TYP.)CONSTRUCTION TRASHENCLOSURE. PROVIDE 40-YARDROLL-OFF BIN FENCED ANDSECURED. ALL SPOILS TO BEREMOVED FROM SITE WITHIN 30DAYS. KEEP ALL DEBRIS ENCLOSEDNORTH030SCALE: 1" = 30'601530FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION AND MULTI-USE PATHWAYS PHASE 1 CONSTRUCTION MANAGEMENT PLAN GLEN LAKE ROTARY PARK NEW ACCESS ROADWAY, PARKING IMPROVEMENTS BOZEMAN, MONTANA&- 17055_EROS_SPS.DWG CMK 10.19.21 2ND CITY SUBMITTAL 01.24.22 - - - - - 3RD CITY SUBMITTAL - - - - - -- 17055NOTE:-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THEENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BESTRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS.-ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 6TH EDITION, APRIL, 2010, AND THE CITY OFBOZEMAN STANDARD MODIFICATIONS, DATED MARCH 31, 2011, WITH ADDENDUM.-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED INTHE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES ASARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.CONSTRUCTION ROUTE MAPSITENORTHV:\17055_East_Gallatin_Rec_Area_Access_Road_Parking_Trail\CADD_C3D\PRODUCTION_DWG\SITE PLAN SUBMITTAL\17055_EROS_SPS.dwg, C6.1, 1/21/2022 9:05:30 AM, rboland, 1:1