HomeMy WebLinkAbout003_MasterSitePlanCP#80CP#9CP#226CP#70PHASE 1PHASE 2PHASE 2PHASE 3PHASE 3PHASE 1NORTH080SCALE: 1" = 80'1604080=ADA ROUTEPROJECT SURVEY CONTROLPoint #97080226Northing129690.49129546.21129137.97129756.11Easting381961.02382326.48382556.19382296.50Elevation4690.434697.234696.214694.49DescriptionCP / 2" DIA ACR SS CTL MONCP / 2" DIA ACR SS CTL MONCP / 2" DIA ACR SS CTL MONPC /YCR MORRISON MAIERLEDATUM:MT 83 BOZ LDPSURVEY COMPLETED 07/28/17 N.M.=100-YEAR FLOODPLAINNOTE:-EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THEENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BESTRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS.-ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 6TH EDITION, APRIL, 2010, AND THE CITY OFBOZEMAN STANDARD MODIFICATIONS, DATED MARCH 31, 2011, WITH ADDENDUM.-UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED INTHE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES ASARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED.FILE:
PROJECT NO:
CAD:
QUALITY ASSURANCE:
DRAWING HISTORY
DATE DESCRIPTION
AND MULTI-USE PATHWAYS
MASTER SITE PLAN
GLEN LAKE ROTARY PARK
NEW ACCESS ROADWAY, PARKING IMPROVEMENTS
BOZEMAN, MONTANA&-
17055_OVERALL_SPS.DWG
CMK
10.19.21 2ND CITY SUBMITTAL
01.24.22
-
-
-
-
-
3RD CITY SUBMITTAL
-
-
-
-
-
--
17055 LEGEND= MASTER PLAN CONSTRUCTION LIMITS= PHASE LIMIT= APPROXIMATE BOZEMAN OLD CITY LANDFILLBOUNDARYV:\17055_East_Gallatin_Rec_Area_Access_Road_Parking_Trail\CADD_C3D\PRODUCTION_DWG\SITE PLAN SUBMITTAL\17055_OVERALL_SPS.dwg, C3.1, 2/1/2022 3:42:53 PM, rboland, 1:1