Danielle,
With the existing well as the irrigation source no CILWR fee is required for the Glen Lake Rotary Park Phase 1 SP ( App.
No. 21-200).
Thanks,
City of Bozeman MT
Griffin Nielsen, PE| Engineering Department
406.582.2280
gnielsen@bozeman.net
From: Danielle Scharf <dscharf@sandersonstewart.com>
Sent: Monday, October 18, 2021 2:16 PM
To: Griffin Nielsen <GNielsen@BOZEMAN.NET>; Brian Heaston <bheaston@BOZEMAN.NET>
Cc: Chris Naumann <cnaumann@sandersonstewart.com>; Bob Farrington <bobfarrington233@gmail.com>
Subject: RE: Glen Lake Rotary Park
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the
sender and know the content is safe.
Hi Griffin,
I’m just checking back on the emails below. Can you please confirm if CILWR is required if the existing well will be the
irrigation water source? We’ll include your email in our site plan resubmittal.
Thanks,
Danielle
Danielle Scharf PE, PTOE, LEED AP
Principal | Bozeman Region Manager
t: 406-922-4325
m: 406-698-3233
From: Danielle Scharf <dscharf@sandersonstewart.com>
Sent: Thursday, October 14, 2021 9:24 AM
To: Griffin Nielsen <GNielsen@BOZEMAN.NET>; Brian Heaston <bheaston@BOZEMAN.NET>
2
Cc: Chris Naumann <cnaumann@sandersonstewart.com>; Bob Farrington <bobfarrington233@gmail.com>
Subject: RE: Glen Lake Rotary Park
Hi Griffin,
I checked with the Landscape Architect, Bob Farrington and he said the irrigation source for phase 1 will be the existing
well.
Thanks,
Danielle
Danielle Scharf PE, PTOE, LEED AP
Principal | Bozeman Region Manager
t: 406-922-4325
m: 406-698-3233
From: Griffin Nielsen <GNielsen@BOZEMAN.NET>
Sent: Tuesday, October 12, 2021 2:24 PM
To: Danielle Scharf <dscharf@sandersonstewart.com>; Brian Heaston <bheaston@BOZEMAN.NET>
Cc: Chris Naumann <cnaumann@sandersonstewart.com>
Subject: RE: Glen Lake Rotary Park
Danielle,
If the irrigation is supplied from the City domestic system the updated fee is 46,306 gal / 325,851gal/AF =0.142 AF @
$6,000/AF = $853, however can define what the irrigation water source? The MaSP indicates there is an existing onsite
well, however the landscape plans don’t show a connection. It would be preferable to source from the well as this result
in no CILWR fee and support the City’s water conservation goals.
Thanks,
City of Bozeman MT
Griffin Nielsen, PE| Engineering Department
406.582.2280
gnielsen@bozeman.net
From: Danielle Scharf <dscharf@sandersonstewart.com>
Sent: Tuesday, October 12, 2021 12:55 PM
To: Brian Heaston <bheaston@BOZEMAN.NET>
Cc: Chris Naumann <cnaumann@sandersonstewart.com>; Griffin Nielsen <GNielsen@BOZEMAN.NET>
Subject: RE: Glen Lake Rotary Park
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the
sender and know the content is safe.
Brian and Griffin,
3
We are in the process of preparing a resubmittal for Glen Lake Rotary Park. Can you please confirm the CILWR fee
estimate that you provided below? The landscape plan from our last submittal is attached and we are not anticipating
any major changes.
Thanks,
Danielle
Danielle Scharf PE, PTOE, LEED AP
Principal | Bozeman Region Manager
t: 406-922-4325
m: 406-698-3233
From: Brian Heaston <bheaston@BOZEMAN.NET>
Sent: Tuesday, February 23, 2021 1:27 PM
To: Danielle Scharf <dscharf@sandersonstewart.com>
Cc: Chris Naumann <cnaumann@sandersonstewart.com>; Griffin Nielsen <GNielsen@BOZEMAN.NET>
Subject: RE: Glen Lake Rotary Park
Hi Danielle – For preliminary purposes, the fee is 40,306 gal /325851 gal/AF = 0.12 AF @ $6000/AF = $742. We’ll confirm
the IWR and produce a final CILWR fee when the phase 1 plan is under review.
Brian
From: Danielle Scharf <dscharf@sandersonstewart.com>
Sent: Monday, February 22, 2021 1:45 PM
To: Brian Heaston <bheaston@BOZEMAN.NET>
Cc: Chris Naumann <cnaumann@sandersonstewart.com>
Subject: Glen Lake Rotary Park
Hi Brian,
We’re working on a Master Site Plan Application and Phase 1 Site Plan Application for Glen Lake Rotary Park (formerly
East Gallatin Recreation Area). We don’t have any new buildings associated with the project, but there will be additional
irrigation needs for the landscape plan. Here’s a summary of the anticipated use for Phase 1:
· 25 Broadleaf Trees – water 2x/week using two 0.25 GPM bubblers in gravel filled sleeves for 15 minutes per
watering period. 375 gallons per week for 14 weeks = 5,250 gallons/year
· 9 Evergreen Spruce Trees – water 1x/week using two 0.25 GPM bubblers for 20 minutes using gravel filled PVC
sleeves per watering period. 90 gallons per week for 14 weeks = 1,260 gallons/year
· 466 Ornamental Grasses – water at 2x/week at 1.5 hours per watering period. 1054 gallons per week for 14
weeks = 14,756 gallons/year
· 17,000 square feet of bio-swale with 850 emitters at 0.8 GPH at 2x/week. 1360 gallons per week for 14 weeks =
19,040 gallons/year
· Total water use for Phase 1 improvements is estimated at 40,306 gallons/year.
Would you please provide a cash-in-lieu of water rights calculation for this project? Let me know if you need any
additional information.
Thanks,