HomeMy WebLinkAbout009 Roof Plan 28A1234567ABCDEFa3.11a3.12a3.21a3.2210" / 12"5" / 12"5" / 12"10" / 12"10" / 12"10" / 12"10" / 12"2" / 12"3" / 12"3" / 12"10" / 12"10" / 12"6" / 12"10" / 12"10" / 12"3" / 12"3" / 12"DRAWN BY:SCALE:PROJECT:pobox 2016 Bozeman, MT 59771(406)531.9671 millerdesignbuild@gmail.comDATE:PROJECT NOREVISION DATEFOR COORDINATION1/4" = 1'-0"a1.4SMRoof PlanLot 28A1410 S. 3rd AveBozeman, MT 5971501222-14-2022ROOF PLAN NOTES1. ALL ROOF PENETRATIONS TO BE AVOIDED WITHIN FRONT FACADE.2. PAINT ALL ROOF PENETRATIONS TO MATCH ROOF.3. INSTALL ICE & WATER SHIELD W/ AT ALL EDGES AND VALLEYS W/ 36"ROLLS IN CONJUCTION WITH SYNTHETIC ROOF UNDERLAYMENT4. INSTALL ALL ROOFING PER MFG. INSTRUCTIONS.5. PROVIDE METAL CAP FLASHING ON TOP OF EXPOSED BEAM ENDSEXPOSED TO WEATHER.6. INSTALL GUTTERS W/ SLOPE OF 1/16" PER FOOT.7. INSTALL CONTINUOUS RIDGE VENT AT ALL TRUSSED OPEN ATTICROOF RIDGES FROM EXTERIOR WALL TO EXTERIOR WALL ORINSTERSECTING ROOF RIDGES/8. INSTALL EAVE VENTS ALONG ALL EXTERIOR WALLS ADJACENT TOVENTED ATTIC SPACES.ROOF VENTILATION REQUIREMENTS1. ATTIC SPACE HAS NO VAPOR BARRIER - UTILIZE 1:150 RULE FOR NETFREE VENTILATION AREA (NFVA) REQUIRED.2 ATTIC SPACE TO BE VENTED W/ RIDGE VENT. SEE MFG FOR QTY.REQUIRED3 EAVE SOFFIT VENTING PER MFG. QTY.4 INSTALL SIDEWALL VENTING WHERE REQUIRED.