HomeMy WebLinkAboutVTV - Water Extension Eng Report_06112021memo
Page 1
TO: Matt Ekstrom, PE
FROM: Celine Saucier, PE
DATE: June 6, 2020
JOB NO.: 1552.089
RE: Water Improvement – Vance Thompson Vision
CC:
Urgent For Review Please Comment Please Reply For Your Use
This memo presents the water improvements done for the construction of the Catron Crossing
Subdivision as it pertains to the proposed Vance Thompson Vision building on Lots 1 & 2. Lots
1 & 2 are included within the previously approved Catron Crossing Subdivision Water System
Improvements Water Main Extension Basis of Design Report, July 2017. This report attached
and has been highlighted reflect the information relevant to Lot 1 & 2.
The installed 8-inch water main within the Catron Crossing Subdivision serves Lots 1, 2, 3, 4, 5,
8, 9 and 10. The report calculated that the total peak hour daily flow for those lots is 88.1 gpm
assuming a flow of 2,000 gal/acre/day for COB Planning Zone B-2. Per the report, the project
can service the water and fire flows from Lots 1 & 2. Refer to the attached Catron Crossing
Water Report for additional information.
CATRON CROSSING SUBDIVISION
WATER SYSTEM IMPROVEMENTS
WATER MAIN EXTENSION BASIS OF DESIGN REPORT
July 2017
PREPARED BY:
MMI #: 2605.025
2
Table of Contents
1.1.1 General Information ..................................................................... 3
1.1.2 Extent of Water Works System, including: ................................... 4
1.1.3 Alternate Plans ............................................................................ 4
1.1.4 Site Conditions ............................................................................ 4
1.1.5 Water Use Data ........................................................................... 5
1.1.6 Flow requirements ....................................................................... 6
1.1.7 Sources of Water Supply ............................................................. 6
1.1.8 Proposed Treatment Processes: ................................................. 6
1.1.9 Sewage System Available ........................................................... 6
1.1.10 Waste Disposal ......................................................................... 7
1.1.11 Automation ................................................................................ 7
1.1.12 Project Sites .............................................................................. 7
1.1.13 Financing ................................................................................... 7
1.1.14 Future Extensions ..................................................................... 7
APPENDICES
Appendix A Fire Flow Calculations
Prepared by:
Morrison-Maierle, Inc.
2880 Technology Blvd. W.
Bozeman, Montana 59771
Phone: (406) 587-0721
Fax: (406) 922-6702
Written By: DDK Checked By: MEE
Approved By: MEE
PROJECT NO.: 2605.025
3
1.1 Engineer’s Report
The following Design Report follows the section numbering of Circular DEQ-1-
Standards for Water Works, August 8, 2014 Section 1.1, Engineer’s Report.
1.1.1 General Information
a. The planned water main extension is being designed to serve the remaining
portion of the property contained in C.O.S. 1827A, the Catron Crossing
Subdivision. Two existing lots (Lot 6, Taco Bell and Lot 7, Comfort Suites hotel),
already have existing water and sewer services. This project will extend
approximately 1,027 feet of new 8-inch Class 51 D.I.P. water main into the Catron
Crossing Subdivision to serve the remaining lots. The new 8-inch main will connect
to an existing 8-inch stub (constructed as part of EQ#17-1052) at the north-west
corner of the existing Taco Bell site on Lot 6. The main will continue to the north
and to connect to an existing 12-inch line that bisects C.O.S. 1827 A. From the
connection at the existing 12-inch line, the 8-inch main will continue proceeding to
the north-west and terminate at the property line (with a hydrant). Three fire
hydrant assemblies are proposed for the project. The project includes several
water services to the lots (Lots 1, 2, 3, 4, 5, 8, 9 and 10).
b. The proposed water main infrastructure will be served by the City of Bozeman.
c. Project Developer:
VC Development, LLC
1184 North 15th, Suite 4
Bozeman, MT 59715
d. System Owner:
City of Bozeman
PO Box 1230
Bozeman, Mt 59715
4
1.1.2 Extent of Water Works System, including:
a. The proposed water main extension is an extension of the City of Bozeman water
infrastructure in the area. The water main extension is proposed for the remaining
lots of the Catron Crossing Subdivision (remaining parcel of C.O.S. 1827A). This
subdivision is zoned B2, (community business). Comfort Suites (Lot 7) is already
located on the parcel along with a currently under construction Taco Bell (Lot 6)
and is served by a water service from the main located in Catamount Street.
b. The project will extend approximately 1,027 feet of new 8-inch Class 51 D.I.P.
water main into the Catron Crossing Subdivision to serve the remaining lots. The
new 8-inch main will connect to an existing 8-inch stub (constructed as part of
EQ#17-1052) at the north-west corner of the existing Taco Bell site on Lot 6. The
main will continue to the north and to connect to an existing 12-inch line that bisects
C.O.S. 1827 A. From the connection at the existing 12-inch line, the 8-inch main
will continue proceeding to the north-west and terminate at the property line (with
a hydrant). Three fire hydrant assemblies are proposed for the project. The project
includes several water services to the lots (Lots 1, 2, 3, 4, 5, 8, 9 and 10).
c. The proposed 8-inch water main extension will service the remaining lots within
the Catron Crossing Subdivision (Lots 1, 2, 3, 4, 5, 8, 9 and 10).
1.1.3 Alternate Plans
The alignment of the proposed main was chosen to meet the layout of the proposed future
development of the Catron Crossing Subdivision.
1.1.4 Site Conditions
a. The proposed Catron Crossing Subdivision site has existing grades of less than
4% and mostly Turner Loam soil deposits.
b. The remaining lots within the Subdivision are favorable for building foundation
construction.
5
c. The ground water flows from the south to the north and is approximately 5-10 feet
from the existing ground elevations (per Montana Bureau of Mines and Geology
website).
1.1.5 Water Use Data
The following section addresses the design capacity and flow requirements discussed in
Section 8 of DEQ - 1. The proposed water main extension will serve the future
development on the remaining lots within the Catron Crossing Subdivision. The capacity
requirement for the water main extension is calculated as follows:
Remaining Catron Subdivision (Lots 1, 2, 3, 4, 5, 8, 9 and 10):
Assumptions:
Zoned B2 (per the City of Bozeman’s Capital Planning) = 2,000
GAL./ACRE/DAY (COB Design Standards Table V-1, page 52)
Remaining Catron Lot site is 15.84 Acres
Average Daily Flow (ADF) = (2,000 GAL./ACRE/DAY)*(15.84 ACRES)
= 31,680 gpd = 22.0 gpm
Peak Hour Daily Flow (MDF) = 3.0 x Avg. Day = 3.0*22.0 = 66.0 gpm
Irrigation Demands:
Assumptions:
30 inches*acres/year will be used for irrigation
30% of the site will be irrigated
Remaining Catron Subdivision = 15.84 acres
Area to be irrigated = 15.84 acres * 30% = 4.75 acres
30 inches*acres/year * 4.75 acres = 142.5 inches*acre/year
142.5 inches*acre/year = 3,869,217 gallons/year
3,869,217 gallons/year = 10,601 gpd = 7.36 gpm
6
Peak Hour Daily Flow (MDF) = 3.0 x Avg. Day = 3.0*7.36 = 22.08 gpm
Total Peak Hour Flow = 66.0 gpm + 22.08 gpm = 88.08 gpm
1.1.6 Flow requirements
a. Average Daily Flow: 29.36 gpm
Maximum Daily Flow: 88.08 gpm
Minimum Working Pressure: 35 psi
Minimum Pressure for Fire Flow: 20 psi
b. Fire flows are based on the City of Bozeman Fire Department requirements for this
commercial development of 1,500 gpm for a 2- hour duration. Calculations have
been completed using a simplified, but conservative, approach. The
calculations are based on a reported available fire flow and pressure at a
fire hydrant on Catamount Street near the south subdivision boundary. The
calculations utilize this connection point for the proposed 8” main and
assume a 1,336 foot long dead end main at the street terminus at the west
boundary of the subdivision thus not taking into account the additional
connection to the existing 12 inch main in the middle of the project. Given
the City of Bozeman 8” minimum water main size there is no reason to
provide a more detailed analysis that would show that the needed fire flow
could be met at a higher pressure than the computed 79 psi. Attachment A
calculations show that there will be sufficient pressure for fire flow.
Per the City of Bozeman Water Facility Plan 2005, a fire hydrant located less than 500
feet to the north of the proposed subdivision has a max day pressure of 100 psi and an
available fire flow of 9246 gpm at a residual pressure of 20 PSI.
1.1.7 Sources of Water Supply
Water is supplied from City of Bozeman.
1.1.8 Proposed Treatment Processes:
Non-applicable.
1.1.9 Sewage System Available
The area is served by the City of Bozeman wastewater treatment facility
7
1.1.10 Waste Disposal
Non-applicable.
1.1.11 Automation
Non-applicable.
1.1.12 Project Sites
a. The project site has been zoned B-2 by the City of Bozeman.
b. The project site has been zoned B-2 by the City of Bozeman. The existing site is
bound by Catamount Street to the South and East Valley Center Road to the North-
East and an undeveloped field to the West.
c. The wastewater at the site will be conveyed to the City of Bozeman wastewater
treatment facility.
1.1.13 Financing
Non-applicable.
1.1.14 Future Extensions
With the proposed 1,027 feet of new 8-inch Class 51 D.I.P. water main installed in Catron
Crossing Subdivision, no future extension will be needed.
N:\2605\025\Design Docs\Reports\Water & Sewer Design Report 052317\Catron Water Extension Eng Report FINAL
071917.docx
Project Description
Friction Method Hazen-Williams Formula
Solve For Pressure at 2
Input Data
Pressure 1 100.00 psi
Elevation 1 4662.00 ft
Elevation 2 4653.00 ft
Length 1336.00 ft
Roughness Coefficient 130.000
Diameter 8.00 in
Discharge 2088.00 gpm
Results
Pressure 2 62.52 psi
Headloss 95.44 ft
Energy Grade 1 4895.42 ft
Energy Grade 2 4799.98 ft
Hydraulic Grade 1 4892.66 ft
Hydraulic Grade 2 4797.22 ft
Flow Area 0.35 ft²
Wetted Perimeter 2.09 ft
Velocity 13.33 ft/s
Velocity Head 2.76 ft
Friction Slope 0.07144 ft/ft
Catron Crossing Subdivision
7/19/2018 11:21:27 AM
Bentley Systems, Inc. Haestad Methods Solution CenterBentley FlowMaster V8i (SELECTseries 1) [08.11.01.03]
27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 1of1Page