Loading...
HomeMy WebLinkAboutFIRE CC Letter-Vance Thompson Vision SP 2-11-2022 February 11, 2022 Celine Saucier, PE Morrison-Maierle 2880 Technology Blvd W Bozeman, MT 59718 RE: Concurrent Construction for proposed Vance Thompson Vision SP #21242. Ms. Saucier, Per approved COB staff report dated November 10, 2021. I approve concurrent construction for Vance Thompson Vision project. The proposed fire hydrant layout and water supply requirements meet city standards. The following requirements must be met for this approval to be binding. 1. 365/24/7 access to working hydrants and acceptable, approved water source 2. Staging plan for location of construction materials, temporary work trailer, and any additional combustible materials 3. Ingress and egress routes for emergency services 4. All weather site access 5. Knox locks for fenced or gated areas Scott Mueller Deputy Chief Fire Marshal 406.582.2353 smueller@bozeman.net