Loading...
HomeMy WebLinkAboutConstruction Management Plan_08272021TVTVGVMWPPTTWVWVXX X X X X X X X X X X X X X X DYHDYHDDDTTWVWVWVWVWVWVSTORM DRAIN INLETRIM GRATE=4646.95INVERT ELEVATIONSUNKNOWN, COULD NOT GETMEASUREDOWNL=210.12'R=175.00'L=179.36'Δ=58°43'24"R=145.00'L=148.61'Δ=58°43'24"60.01'L=136.71'N31°31'42"W 169.98'N31°31'42"W 182.16'57.71'21.51'30.00'15.00'N41°11'12"W52.36'N58 °28 '18 "E 226 .9 4 'N58°28 ' 18 "E 229 .91 ' N0°48'34"E 252.49'N90°00'00"E 222.71'N45°00'00"E 112.26'ΔCB=SCH=41S58°28 '18 "W 330 .23 'N31°31'42"W 85.13'R=205.00'L=210.11'Δ=58°43'26"CB=N60°53'24"WCH=201.03'S89°44'53"W 56.60'57.15'80.05'S45°59'06"E 154.43'S45°59'06"E 152.82'N35°03'51"W 170.13'N35°03'51"W 239.25'Know what'sbelow.before you dig.CallRGRAPHIC SCALE0(IN FEET)102010201 INCH = 20 FTTHIS SITE HAS BEEN DESIGNED TO BE ACCESSIBLE TOINDIVIDUALS WITH DISABILITIES IN ACCORDANCE WITHTHE AMERICANS WITH DISABILITIES ACT.NOTES BY SYMBOL:INSTALL TYPE D INLET PROTECTION FILTERPER DETAIL 3 ON SHEET C3.1.1 PRIOR TOTHE DISTURBANCE OF ANY PORTION OFTHE SITE.3LEGENDPROPOSED CONCRETEEROSION & SEDIMENT CONTROL NOTES:1.EROSION AN SEDIMENT CONTROL ON THIS PROJECT SHALL BE COMPLETED INACCORDANCE WITH THE CITY OF BOZEMAN'S BEST MANAGEMENT PRACTICE(BMP) MANUAL FOR CONSTRUCTION SITES. VERSION 3 - SEPTEMBER 1, 2016.2.ALL REQUIRED PERIMETER SILT AND CONSTRUCTION FENCING SHALL BEINSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING,STRIPPING, GRADING, ETC). ALL OTHER REQUIRED EROSION CONTROLMEASURES SHALL BE INSTALLED AT THE APPROPRIATE TIME IN THECONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECTSCHEDULE, CONSTRUCTION PLANS, AND STORMWATER MANAGEMENT PLAN.3.AT ALL TIMES DURING CONSTRUCTION, THE CONTRACTOR SHALL BERESPONSIBLE FOR PREVENTING AND CONTROLLING ON-SITE EROSIONINCLUDING KEEPING THE PROPERTY SUFFICIENTLY WATERED SO AS TOMINIMIZE WIND BLOWN SEDIMENT. THE CONTRACTOR SHALL ALSO BERESPONSIBLE FOR INSTALLING AND MAINTAINING ALL EROSION CONTROLFACILITIES SHOWN HEREIN.4.PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINEDWHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATIONSHALL BE LIMITED TO THE AREA(S) REQUIRED FOR IMMEDIATE CONSTRUCTIONOPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME.5.CONDITIONS IN THE FIELD MAY WARRANT EROSION CONTROL MEASURES INADDITION TO WHAT IS SHOWN ON THESE PLANS. THE CONTRACTOR SHALLIMPLEMENT WHATEVER MEASURES ARE DETERMINED NECESSARY TOCONTROL ON-SITE EROSION.6.ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BYAPPROPRIATE EROSION CONTROL METHODS. ANY SOIL STOCKPILE THAT WILLBE DORMANT FOR OVER THIRTY (30) DAYS SHALL BE SEEDED.7.THE CONTRACTOR SHALL AT ALL TIMES TAKE WHATEVER MEASURES ARENECESSARY TO ASSURE THE PROPER CONTAINMENT AND DISPOSAL OFPOLLUTANTS ON THE SITE IN ACCORDANCE WITH ANY AND ALL APPLICABLELOCAL, STATE, AND FEDERAL REGULATIONS.8.THE CONTRACTOR SHALL IMMEDIATELY CLEAN UP ANY CONSTRUCTIONMATERIALS INADVERTENTLY DEPOSITED ON EXISTING STREETS OR OTHERPUBLIC RIGHTS OF WAY, AND MAKE SURE STREETS ARE CLEANED AT THE ENDOF EACH WORKING DAY.INSTALL TRACKOUT CONTROL SYSTEMPER DETAIL 2 ON SHEET C3.1.1 OR ASRECOMMENDED BY MANUFACTURERCONSTRUCTION LIMITSSTRAW WATTLE 1/C0201INSTALL CONCRETE WASHOUT FACILITYPER DETAIL 4 ON SHEET C3.1.12AREA TO BE PAVED332issue dateproject #phasesheet project ownerrevisiondateC1.1.2EROSION AND SEDIMENT CONTROL PLAN 21012.00NOT FORCONSTRUCTIONVANCE THOMPSON VISION DESIGN DEVELOPMENT - NOT FOR CONSTRUCTION 100% DD5/20211TEMPORARYSANITARYFACILITYTEMPORARYJOB SITEDUMPSTERTEMPORARYJOB SITETRAILERCONSTRUCTION MANAGEMENT PLAN