Loading...
HomeMy WebLinkAbout027_A20 ELEVATIONS OVERALLFIRST FLOOR 100' -0" FIRST FLOOR 100' -0" IC HIGH ROOF 133' -0" LOW ROOF 116' -0" VEH. STOR. ROOF 124' -0" 70' - 3"200' - 0"33' - 0"24' - 0"BACK-LIT, PRE-FINISHED DIMENSIONAL CHARACTERS LOUVERED SCREEN WALL FOR MECH EQUIPMENT 60' - 0"140' - 0" PRE-FINISHED ALUM. STOREFRONTT.O. FOOTING 97' -0" T.O. FOOTING 97' -0" A A.4 A.6 B D C.8 E F G H J PCC-1 PCC-2 MWP-1 MWP-2 PCC-3 PCC-3 (TEXTURE) MWP-2MWP-2 CMU MWP-1 MWP-2MWP-1 MC A.5 FIRST FLOOR 100' -0" FIRST FLOOR 100' -0" 111 HIGH ROOF 133' -0" LOW ROOF 116' -0" VEH. STOR. ROOF 124' -0" FLOOR LEVEL 300' - 0"9' - 0"24' - 0"16' - 0"PRE-FINISHED LOUVERED SCREEN WALL T.O. FOOTING 97' -0" T.O. FOOTING 97' -0" 4.4 6 7.4 8.5 12 139.3 111' - 6"111' - 9"76' - 9" PCC-3 PCC-3 (TEXTURE) MWP-1 MWP-2 MWP-1 CMU MWP-1 MWP-1 PCC-1 MC 2 3 4 5 7 8 9 10 1 1 DEPARTURE REQUEST #2 1 DEPARTURE REQUEST #4 1 FIRST FLOOR 100' -0" I C HIGH ROOF 133' -0" VEH. STOR. ROOF 124' -0"3' - 0" 24' - 0" 9' - 0" T.O. FOOTING 97' -0" AA.4A.6BDC.8EFGHJ PCC-1 PCC-2 MWP-1 PCC-3 PCC-3 (TEXTURE) MWP-2 200' - 0" 63' - 6"73' - 0"63' - 6" MC A.5 DEPARTURE REQUEST #4 DEPARTURE REQUEST #4 1 1 FIRST FLOOR 100' -0" FIRST FLOOR 100' -0" 11 1 HIGH ROOF 133' -0" LOW ROOF 116' -0" 300' - 0"16' - 0"33' - 0"TRANSLUCENT RESIN PANELS ('KALWALL') - TYP STEEL ACCENT BAND - PAINT 300' - 0" T.O. FOOTING 97' -0" T.O. FOOTING 97' -0" 4.467.48.512139.3 PCC-1 PCC-2 PCC-3 PCC-3 (TEXTURE) MWP-2MWP-1 PCC-2 MC 234578910 PRE-CAST CONCRETE WALL PANEL (FIELD COLOR) PRE-CAST CONCRETE WALL PANEL (ACCENT BAND) PRE-CAST CONCRETE WALL PANEL (ACCENT WALL) PRE-FINISHED METAL WALL PANEL ALUMINUM COMPOSITE WALL PANEL CMU WAINSCOTTING PRE-FINISHED METAL COPING SYSTEM PCC-1 PCC-2 PCC-3 MWP-1 MWP-2 CMU EXTERIOR MATERIAL LEGEND MC COPYRIGHT 2019 12/6/2021 10:00:23 AMA2.0 SITE PLAN REVIEW 12/03/21 2008STELLA FRIABRONKEN WAREHOUSE3345 Prince Lane, Bozeman, MTEXTERIOR ELEVATIONS1/16" = 1'-0"A2.0 1 SOUTH ELEVATION 1/16" = 1'-0"A2.0 2 WEST ELEVATION 1/16" = 1'-0"A2.0 3 NORTH ELEVATION 1/16" = 1'-0"A2.0 4 EAST ELEVATION ISSUE DATE DESCRIP. 1 12/3/21 SP REV1