HomeMy WebLinkAbout013_C200 Erosion and Sediment Control PlanSDSDSDSDSDSDSDSD SD SD SD SD SD SD SD SD SD SD SD SD SD
SDSDSDSD12SD
SS8W8WWSWS12SD12SD12SD12SD12SD12SD12SD15SD 15SD 15SD 15SD
SD
SD
SDSDSD12SD 12SD 12SD
SDSDFFTVTVTVTVEEDYHDYH
DYHIIDDDDSDSDDDSPPPWVWVWVWVWVWVWVWVWVBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPNGNGNGNGNGNGNGNGNGNGNGNGNGNGNGSSSSSSSSSSSSSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBP
BPBP BP BP BP BP BP BP BP BP BP BP BP BP BP BP BP
BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT
BT
BT
BT SDSDSDSDSDSSSWWWWWWWWWWWWWWW XXXXXXXXXXXXXXXXXXPROPOSED STRAW WATTLESEE 1/C0.20CONSTRUCTIONLIMITSCONSTRUCTIONTRASH ENCLOSURELOCATION SEE SHEETC015 FOR DETAILTEMPORARYSANITARYFACILITYTEMPORARYJOB SITETRAILERPROPOSED STRAW WATTLESEE DETAIL 1/C0.20LEGENDPROPOSED CONCRETESURFACECONSTRUCTION LIMITSSTRAW WATTLEAREA TO BE PAVEDEROSION & SEDIMENT CONTROL NOTES:1.EROSION AN SEDIMENT CONTROL ON THIS PROJECT SHALL BE COMPLETED INACCORDANCE WITH THE CITY OF BOZEMAN'S BEST MANAGEMENT PRACTICE(BMP) MANUAL FOR CONSTRUCTION SITES. VERSION 3 - SEPTEMBER 1, 2016.2.ALL REQUIRED PERIMETER SILT AND CONSTRUCTION FENCING SHALL BEINSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING,STRIPPING, GRADING, ETC). ALL OTHER REQUIRED EROSION CONTROLMEASURES SHALL BE INSTALLED AT THE APPROPRIATE TIME IN THECONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECTSCHEDULE, CONSTRUCTION PLANS, AND STORMWATER MANAGEMENT PLAN.3.AT ALL TIMES DURING CONSTRUCTION, THE CONTRACTOR SHALL BERESPONSIBLE FOR PREVENTING AND CONTROLLING ON-SITE EROSIONINCLUDING KEEPING THE PROPERTY SUFFICIENTLY WATERED SO AS TOMINIMIZE WIND BLOWN SEDIMENT. THE CONTRACTOR SHALL ALSO BERESPONSIBLE FOR INSTALLING AND MAINTAINING ALL EROSION CONTROLFACILITIES SHOWN HEREIN.4.PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINEDWHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATIONSHALL BE LIMITED TO THE AREA(S) REQUIRED FOR IMMEDIATE CONSTRUCTIONOPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME.5.CONDITIONS IN THE FIELD MAY WARRANT EROSION CONTROL MEASURES INADDITION TO WHAT IS SHOWN ON THESE PLANS. THE CONTRACTOR SHALLIMPLEMENT WHATEVER MEASURES ARE DETERMINED NECESSARY TOCONTROL ON-SITE EROSION.6.ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BYAPPROPRIATE EROSION CONTROL METHODS. ANY SOIL STOCKPILE THAT WILLBE DORMANT FOR OVER THIRTY (30) DAYS SHALL BE SEEDED.7.THE CONTRACTOR SHALL AT ALL TIMES TAKE WHATEVER MEASURES ARENECESSARY TO ASSURE THE PROPER CONTAINMENT AND DISPOSAL OFPOLLUTANTS ON THE SITE IN ACCORDANCE WITH ANY AND ALL APPLICABLELOCAL, STATE, AND FEDERAL REGULATIONS.8.THE CONTRACTOR SHALL IMMEDIATELY CLEAN UP ANY CONSTRUCTIONMATERIALS INADVERTENTLY DEPOSITED ON EXISTING STREETS OR OTHERPUBLIC RIGHTS OF WAY, AND MAKE SURE STREETS ARE CLEANED AT THE ENDOF EACH WORKING DAY.NOTES BY SYMBOL:INSTALL TYPE D INLET PROTECTION FILTERPER DETAIL 3 ON SHEET C0.20 PRIOR TOTHE DISTURBANCE OF ANY PORTION OFTHE SITE.3INSTALL TRACKOUT CONTROL SYSTEMPER DETAIL 2 ON SHEET C0.20 OR ASRECOMMENDED BY MANUFACTURER1INSTALL CONCRETE WASHOUT FACILITYPER DETAIL 4 ON SHEET C0.20221RKnow what'sbelow.before you dig.CallPRINCE LNNELSON RD
C2.0SITE PLAN REVIEW12/03/212200.048STELLA FRIA
BRONKEN WAREHOUSE
3345 PRINCE LANE, BOZEMAN, MT
EROSION AND SEDIMENT CONTROL PLAN
9/24/2021 9:45:22 AM 1333306015300SCALE IN FEETNo. 49499CELINE MPROFESSIONALENGI
NEER MONTANALICENSEDSAUCIERCOPYRIGHT 2019ISSUEDATEDESCRIP.112/3/21SP REV 11MATERIAL STAGINGLOCATION1