Loading...
HomeMy WebLinkAboutA31bElevationsT.O. SLAB100' -0" LEVEL 2113' -2 3/4" 3b 4b 5b 6b 7b2b1b T.O. RIDGE133' -2 7/8"20' - 0 1/8"13' - 2 3/4"33' - 2 7/8"M3 M1 M1 1 1 M1 CORRUGATED METAL SIDING & ROOFING METAL SALES T-10A FINISH: FACTORY PAINTED -MATTE BLACK M2 CORRUGATED METAL SIDING - PERFORATED METAL SALES T-10A PERFORATED FINISH: FACTORY PAINTED -MATTE BLACK M3 NATURAL WOOD SIDING 1" x 4" SHIPLAP CEDAR FINISH: STAIN -WHITEWASHED / CLEAR M4 BRICK VENEER MUTUAL MATERIALS FACE BRICK FINISH: COAL CREEK M5 EXPOSED CONCRETE FORM TIES REMOVED AND PLUGS FILLED FINISH: NATURAL M6 METAL FASCIA & TRIM PRE-FINISHED BRAKE METAL FINISH: FACTORY PAINTED -MATTE BLACK M7 STEEL RAILINGS AND AWNINGS STRUCTURAL STEEL. WELDED AND GRINDED FINISH: PAINT -MATTE BLACK EXTERIOR MATERIAL LEGEND T.O. SLAB100' -0" LEVEL 2113' -2 3/4" LOFT LEVEL122' -4 1/2" T.O. ROOF (COMM.)126' -11 1/2" AbDbBbCb T.O. RIDGE133' -2 7/8" M3 M1 M2 1 1 1103 North Pinecrest Dr. Bozeman, MT 59715 aspektarch.com 719.330.9496 ARCHITECTURE & DESIGN SHEET PROJECT REVISIONS DRAWINGS FOR PLANNING REVIEW ONLY © 2021 ASPEKT ARCHITECTUREC:\Users\revee\Documents\ASPEKT\GLM - Glen Lake\DRAWINGS\REVIT\GLM_CURRENT.rvtA31b BRIDGER SKYLINE ELEVATIONS BUILDING B 2214,2218,2200 IRON HORSE RD. BOZEMAN, MT 59715 10.26.2021 GLM 3/16" = 1'-0"A31b1 BUILDING B -EAST ELEVATION 3/16" = 1'-0" A31b2 BUILDING B.1 -NORTH ELEVATION No. Description Date 1 SITE PLAN RC-1 10.26.21