Loading...
HomeMy WebLinkAboutStormwaterDesignReport DESIGN REPORT STORMWATER MANAGEMENT LOTS 2 - 4, BLOCK 1 GLEN LAKE COMMERCE SUBDIVISION Prepared for: Bridger Skyline Commercial Lofts Prepared by: C&H Engineering and Surveying, Inc. 1091 Stoneridge Drive, Bozeman, MT 59718 (406) 587-1115 Project Number: 210418 May 2021 INTRODUCTION The proposed building with seven residential/shop units is located on Lots 2-4, Block 1 of Glen Lake Commerce Subdivision in Bozeman, Montana. A combination of site grading, curb and gutter, drywells, and existing subdivision stormwater infrastructure will be used to manage stormwater runoff for the development of the site. A Drainage Area Map is included in Appendix A. Calculations for each individual drainage area are included in Appendix B. Photos of the existing retention pond for the subdivision are included in Appendix E. DRAINAGE AREAS Drainage Area 1 Drainage Area 1 consists of the proposed drive approach, a portion of buildings B & D, the surrounding sidewalks and landscaped areas. Runoff from Drainage Area 1 flows via sheet flow, downspouts, and curb & gutter into Iron horse Road. The runoff is then carried north into the existing subdivision retention pond in Lot 9. It was found that the 10-year, 2-hour storm generated 695 cubic feet of runoff. Drainage Area 2A Drainage Area 2A consists of a portion of buildings C & D and the northern half of the parking lot. Runoff from Drainage Area 2A flows via sheet flow, curb & gutter, and a valley gutter into the proposed Drywell # 1. The drywell was sized according to City of Bozeman Design Standards to retain the volume from the 10-year, 2-hour storm event. DA 2A will generate 564 cubic feet of runoff, the proposed Drywell #1 will provide 588 cubic feet of storage. Storage calculations are included in Appendix C. Drainage Area 2B Drainage Area 2B consists of a portion of buildings A & B and the southern half of the parking lot. Runoff from Drainage Area 2B flows via sheet flow, curb & gutter, and a valley gutter into the proposed Drywell #2. The drywell was sized according to City of Bozeman Design Standards to retain the volume from the 10-year, 2-hour storm event. DA 2B will generate 546 cubic feet of runoff, the proposed Drywell #2 will provide 551 cubic feet of storage. Storage calculations are included in Appendix C. Drainage Area 3 Drainage Area 3 consists of a portion of buildings A&C and the surrounding sidewalks and landscaped areas. Runoff from Drainage Area 3 flows via sheet flow and downspouts into Manley Road. The runoff is then carried north into the existing subdivision retention pond in Lot 9. It was found that the 10-year, 2-hour storm generated 700 cubic feet of runoff. EXISTING RETENTION POND ADEQUACY CHECK The existing retention pond for the entire subdivision is located on Lot 9, Block 2 and was sized according to City of Bozeman Design Standards to retain the volume from the 10-year, 2-hour storm event. The subdivision stormwater design report by Madison Engineering calculated the required volume for the entire subdivision as 17,364 cubic feet using a C value of 0.65 for all future developable lots, including Lots 2-4, Block 2. A retention pond with a volume of 19,275 cubic feet was installed providing an excess of 1,911 cubic feet of storage capacity. Using a C value of 0.65 it was determined that Lots 2-4, Block 2 generated 2,015 cubic feet of runoff prior to development. The actual C value for the proposed development of Lots 2-4, Block 2 was calculated as 0.81, which results in an excess of 491 cubic feet of runoff. As described earlier in the report only DA 1 & 3 contribute runoff to the subdivision retention pond. Combined the site will send 1,395 cubic feet to the existing retention pond which is approx. 70% of the volume Lots 2-4 contributed prior to development. APPENDIX A DRAINAGE AREA MAP APPENDIX B DRAINAGE AREA CALCULATIONS Pre Development Runoff Calculations 1. Calculate Required Volume Q = CIA V=7200Q A = Area (SF)45988 Lots 2-4 C = Weighted C Factor 0.65 I = intensity (in/hr) 0.41 (10 yr, 2hr storm) A = Area (acres)1.06 Q = RUNOFF (cfs)0.28 V = ALLOWED VOL (ft3)2015 POST DEVELOPMENT RUNOFF VOLUME 1. Calculate Area and Weighted C Factor Contributing Area C Area (ft2 )C * Area Landscape 0.2 8687 1737 Hardscape 0.95 37301 35436 Total 45988 37174 A = Area (acres)1.06 C = Weighted C Factor 0.81 2. Calculate Required Volume Q = CIA V=7200Q C = Weighted C Factor 0.81 I = intensity (in/hr) 0.41 (10 yr, 2hr storm) A = Area (acres)1.06 Q = RUNOFF (cfs)0.35 V = REQUIRED VOL (ft3)2506 DRAINAGE AREA #1 RUNOFF VOLUME FROM DA#1 1. Calculate Area and Weighted C Factor Contributing Area C Area (ft2 )C * Area Landscape 0.2 4449 890 Hardscape 0.95 9921 9425 Total 14369 10314 A = Area (acres)0.33 C = Weighted C Factor 0.72 2. Calculate Required Volume Q = CIA V=7200Q C = Weighted C Factor 0.72 I = intensity (in/hr) 0.41 (10 yr, 2hr storm) A = Area (acres)0.33 Q = RUNOFF (cfs)0.10 V = REQUIRED VOL (ft3)695 Check the half inch requirement (per DSSP II.A.4) 1. Determine Area of Hardscape within Drainage Area #1 Contributing Area Area (ft 2 ) Hardscape 9921 2. Calculate 1/2" runoff volume over hardscape (aka Runoff Reduction Volume [RRV] as calculated in Montana Post- Construction Storwater BMP Manual - Equation 3-1) RRV = [P*Rv*A]/12 P = Water quality rainfall depth 0.50 inches Rv = Dimensionless runoff coefficient 0.67 0.05 + 0.9*I I = Percent impervious cover (decimal)0.69 decimal A = Entire drainage area 0.33 acres RRV = Runoff Reduction Volume 0.0092 acre-ft RRV = Runoff Reduction Volume 402 cubic feet Because the runoff volume from the 10-yr, 2-hr storm (for flood control) is greater than the runoff volume produced by the half inch rainfall (for water quality) the existing retention pond is sized to handle the larger volume (695 cf). DRAINAGE AREA #2A RUNOFF VOLUME FROM DA#2A 1. Calculate Area and Weighted C Factor Contributing Area C Area (ft2 )C * Area Landscape 0.2 174 35 Hardscape 0.95 8776 8337 Total 8949 8372 A = Area (acres)0.21 C = Weighted C Factor 0.94 2. Calculate Required Volume Q = CIA V=7200Q C = Weighted C Factor 0.94 I = intensity (in/hr) 0.41 (10 yr, 2hr storm) A = Area (acres)0.21 Q = RUNOFF (cfs)0.08 V = REQUIRED VOL (ft3)564 Check the half inch requirement (per DSSP II.A.4) 1. Determine Area of Hardscape within Drainage Area #2A Contributing Area Area (ft 2 ) Hardscape 8776 2. Calculate 1/2" runoff volume over hardscape (aka Runoff Reduction Volume [RRV] as calculated in Montana Post- Construction Storwater BMP Manual - Equation 3-1) RRV = [P*Rv*A]/12 P = Water quality rainfall depth 0.50 inches Rv = Dimensionless runoff coefficient 0.93 0.05 + 0.9*I I = Percent impervious cover (decimal)0.98 decimal A = Entire drainage area 0.21 acres RRV = Runoff Reduction Volume 0.0080 acre-ft RRV = Runoff Reduction Volume 348 cubic feet Because the runoff volume from the 10-yr, 2-hr storm (for flood control) is greater than the runoff volume produced by the half inch rainfall (for water quality) the proposed Drywell # 1 is sized to handle the larger volume (564 cf). DRAINAGE AREA #2B RUNOFF VOLUME FROM DA#2B 1. Calculate Area and Weighted C Factor Contributing Area C Area (ft2 )C * Area Landscape 0.2 167 33 Hardscape 0.95 8497 8073 Total 8665 8106 A = Area (acres)0.20 C = Weighted C Factor 0.94 2. Calculate Required Volume Q = CIA V=7200Q C = Weighted C Factor 0.94 I = intensity (in/hr) 0.41 (10 yr, 2hr storm) A = Area (acres)0.20 Q = RUNOFF (cfs)0.08 V = REQUIRED VOL (ft3)546 Check the half inch requirement (per DSSP II.A.4) 1. Determine Area of Hardscape within Drainage Area #2B Contributing Area Area (ft 2 ) Hardscape 8497 2. Calculate 1/2" runoff volume over hardscape (aka Runoff Reduction Volume [RRV] as calculated in Montana Post- Construction Storwater BMP Manual - Equation 3-1) RRV = [P*Rv*A]/12 P = Water quality rainfall depth 0.50 inches Rv = Dimensionless runoff coefficient 0.93 0.05 + 0.9*I I = Percent impervious cover (decimal)0.98 decimal A = Entire drainage area 0.20 acres RRV = Runoff Reduction Volume 0.0077 acre-ft RRV = Runoff Reduction Volume 337 cubic feet Because the runoff volume from the 10-yr, 2-hr storm (for flood control) is greater than the runoff volume produced by the half inch rainfall (for water quality) the proposed Drywell #2 is sized to handle the larger volume (546 cf). DRAINAGE AREA #3 RUNOFF VOLUME FROM DA#3 1. Calculate Area and Weighted C Factor Contributing Area C Area (ft2 )C * Area Landscape 0.2 3897 779 Hardscape 0.95 10108 9602 Total 14005 10382 A = Area (acres)0.32 C = Weighted C Factor 0.74 2. Calculate Required Volume Q = CIA V=7200Q C = Weighted C Factor 0.74 I = intensity (in/hr) 0.41 (10 yr, 2hr storm) A = Area (acres)0.32 Q = RUNOFF (cfs)0.10 V = REQUIRED VOL (ft3)700 Check the half inch requirement (per DSSP II.A.4) 1. Determine Area of Hardscape within Drainage Area #3 Contributing Area Area (ft 2 ) Hardscape 10108 2. Calculate 1/2" runoff volume over hardscape (aka Runoff Reduction Volume [RRV] as calculated in Montana Post- Construction Storwater BMP Manual - Equation 3-1) RRV = [P*Rv*A]/12 P = Water quality rainfall depth 0.50 inches Rv = Dimensionless runoff coefficient 0.70 0.05 + 0.9*I I = Percent impervious cover (decimal)0.72 decimal A = Entire drainage area 0.32 acres RRV = Runoff Reduction Volume 0.0094 acre-ft RRV = Runoff Reduction Volume 408 cubic feet Because the runoff volume from the 10-yr, 2-hr storm (for flood control) is greater than the runoff volume produced by the half inch rainfall (for water quality) the existing retention pond is sized to handle the larger volume (700 cf). APPENDIX C DRYWELL SIZING CALCULATIONS DRAINAGE AREA #2A DRYWELL #1 1. Calculate Area and Weighted C Factor Contributing Area C Area (ft 2 )C * Area Landscape 0.2 173.66 35 Hardscape 0.95 8775.65 8337 Total 8949 8372 A = Area (acres)0.2054 C = Weighted C Factor 0.94 2. Calculate Required Volume Q=CIA V=7200Q C = Weighted C Factor 0.94 I = Intensity (in/hr)0.41 (10 yr, 2hr storm) A = Area (acres)0.21 Q = Runoff (cfs)0.08 V = REQUIRED VOL (ft3)564 3. Calculate Drywell Volume Void Ratio of Media 30.00% Gravel Offset Dist. From Drywell (ft)6.5 (see Circular DEQ 4, Table 2.1-1) Gravel Void Volume Gravel Bed Depth (below MH)2.00 Gravel Volume (ft3)1656.18 Gravel Storage Volume (ft3)496.85 Manhole Volume Manhole Depth (ft)5.00 Manhole Volume (ft3)91.61 Provided Volume (ft3)588 DRAINAGE AREA #2B DRYWELL #2 1. Calculate Area and Weighted C Factor Contributing Area C Area (ft 2 )C * Area Landscape 0.2 167.18 33 Hardscape 0.95 8497.39 8073 Total 8665 8106 A = Area (acres)0.1989 C = Weighted C Factor 0.94 2. Calculate Required Volume Q=CIA V=7200Q C = Weighted C Factor 0.94 I = Intensity (in/hr)0.41 (10 yr, 2hr storm) A = Area (acres)0.20 Q = Runoff (cfs)0.08 V = REQUIRED VOL (ft3)546 3. Calculate Drywell Volume Void Ratio of Media 30.00% Gravel Offset Dist. From Drywell (ft)6.5 (see Circular DEQ 4, Table 2.1-1) Gravel Void Volume Gravel Bed Depth (below MH)1.50 Gravel Volume (ft3)1531.34 Gravel Storage Volume (ft3)459.40 Manhole Volume Manhole Depth (ft)5.00 Manhole Volume (ft3)91.61 Provided Volume (ft3)551 APPENDIX D EXCERPTS FROM GLEN LAKE COMMERCE SUBDIVISION STORMWATER DESIGN REPORT, 2018 (MADISON ENGINEERING) APPENDIX E PHOTOS OF EXISTING RETENTION POND