HomeMy WebLinkAbout003 CORRECTION LIST Intrinsik Architecture, Inc. 2021-12-01 9TEN Mixed-Use RC-1 Submittal Corrections Narrative – Updated. Appendix A – No change. Appendix B – No change. Appendix C – Updated to include North Chamber. Appendix D – Updated. Appendix E – No change. Appendix F – No change. Appendix G – No change. Appendix H – Added information on the Interior bike racks & workstation. SP000 – Revised dates of plan sheets on cover sheet, updated Site and Building Data. SP100 – Revisions to residential open space, updated utility layout, updated entry plaza configurations, updated North Building dimensions, and bike rack locations. SP101 – No changes. SP102 – No changes. SP201N – Updated unit layout, building dimensions, and amenity space. SP201S – Updated amenity space, updated commercial space entries. SP202N – Updated unit layout and building dimensions. SP202S – No changes. SP203N – Updated unit layout and building dimensions. SP203S – No changes. SP204N – Updated unit layout and building dimensions. SP204S – No changes. SP205N – Updated building dimensions. SP205S – No changes. SP300N – Revision to exterior material 5, minor revisions to window locations, revised balcony material (material #8). SP300S – Revision to exterior material 5, minor revisions to window locations, and commercial space façade updates, revised balcony material (material #8). SP301N – Revision to exterior material 5, minor revisions to window locations, revised balcony material (material #8). SP301S - Revision to exterior material 5, minor revisions to window locations, revised balcony material (material #8). SP800 – Updated color renderings with updated unit layout & exterior material 5, revised balcony material (material #8). C1.0 – No change. C1.1 – No change. C2.1 – No change. C3.1 – Updated utility routing, updated entry plaza, reconfigured storm chambers, utility conduit beneath entry plazas in easement, omission of mid-block streetlight per engineering comments. C4.1 – Updates related to C3.1 revisions. C5.1 – No change. C5.2 – Added 48” diameter dry well detail. C5.3 – Revised Storm Chamber details & information. L000 – Updated entry plazas, moved tree out of street vision triangle, updated bike rack locations. L001 – Updated plant schedule. L200 – Revisions related to L000 changes. L300 – Revisions related to L000 changes. L301 – Revisions related to L000 changes. L500 – Updates to bike rack detail. L501 – No changes. L600 – Revisions related to L000 changes. ES1.1 – No changes. ES1.2 – Updated photometric calculations. ES1.3 – Updated photometric calculations. ES1.4 – No changes. Submittal Revisions: Overall unit count was updated from 99 units to 100 units, and unit mix has been updated as detailed in revised narrative. Entry plazas at the North and South Buildings have been updated, and planters have been added adjacent to the parking area to provide screening for the open space. Ramp location at the south plaza has been updated. Amenity room was relocated in the North Building to the ground floor and an additional shared amenity space was added to the South Building ground floor. Commercial space door configuration has been updated, door is recessed, and door swing has been updated to an inswing door. Gas meter locations have been updated and are adjacent to electrical meters. All related changes are clouded and tagged on their respective sheets.