Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
003_Parking Calculations
Ar c h i t e c t u r e E n g i n e e r i n g P l a n n i n g I n t e r i o r s © , D L R G r o u p i n c . o f M o n t a n a , a M o n t a n a c o rp o r a t i o n , A L L R I G H T S R E S E R V E D BEN J A M I N T A L P O S RE V I S I O N S 2/ 2 0 / 2 0 1 9 1 2 : 2 6 : 1 1 P M C: \ R e v i t \ 2 6 - 1 9 1 0 1 - 0 0 _ A C B o z e m a n _ A R _ 2 0 1 8 _ k h a n n o n . r v t 26 -19 1 0 1 -00 1 -7 -19 MT H O T E L B O Z E M A N SP R S I T E P L A N GE N E R A L I N F O R M A T I O N G0 . 0 5 E A S T M E N D E N H A L L S T BO Z E M A N , M O N T A N A 5 9 7 1 5 20 1 8 HO M E B A S E P A R T N E R S PROJECT MATRIXCONSTRUCTION ROUTE MAP Construction traffic will use 191/Main Street as the primary route through the City to access the project site. From Main Street drivers shall turn on N. Rouse and then West on to W Mendenhall St. due to the availability of traffic signal at Main St. and the ease of truck access on Rouse. Delivery trucks will utilize Tracy Ave. along the project site to temporarily park and offload materials and equipment. After making deliveries or pick-up, vehicles will continue North on Tracy Ave. turn onto Beal St. and merge onto Willson Ave. towards Main St. Misc. Notes: The perimeter of the site will be barricaded from the public with a 6’ tall temporary chain link fence. Access will be through gates. Construction waste dumpster will be staged onN Tracy Ave.LAND USELOT SIZE (SF)ESTIMATED TOTAL FLOOR AREAFLOOR AREA RATIO EXISTING AND PROPOSED BUILDINGS AND STRUCTURES 4 Structures LANDSCAPED AREASIndicates areas landscaped adjacent to sidewalks inside property lines. HOTEL USE 19,977 SF88,303 SF4.42 5,715 SF 1,473 SF BLOCK FRONTAGE DESIGNATION TRACY AVE = STOREFRONT BLOCK FRONTAGE ME N D E N H A L L S T = S T O R E F R O N T B L O C K F R O N T A G E IN COMPLIANCE WITH UDC SEC. 38.510.030.B BUILDING FOOTPRINT HOTEL ROOM COUNT EMPLOYEES ON MAX SHIFT 157.3 16 143 16 1.1 1 SUBTOTAL 173.3 REDUCTIONS - B3 (30%), TRANSIT HUB (10%), PARKING GARAGE (15%) 55% TOTAL REQUIRED SPACES 77.9 =78 SPACES REQUIRED BICYCLE PARKING 173.3 0.1 REF. UP UP 1 1 3 3 4 4 5 5 8.1 8.1 B B C.1 C.1 E E 2.1 2.1 H.2 H.2 A A C C STAIRS S2 LOUNGE 009 BREAKFAST 008 BKST BAR 122 KITCHEN 109 SALES OFFICE 114 MARKET 118 MECH 111 EMPLOYEE BREAK RM 112 ELEC 101 ASST GM 116 WORK AREA/OFFICE 113 LUGGAGE 117 RISER RM 103 REG. DESK 011 BOH CIRC 004 BOH CIRC 002 VEST 012 2 2 STAIRS S1 BOARD ROOM 123 LA R G E S C A L E A R T GEN. MGR 115 D D SLIDING DOOR 8 8 G G D.1 D.1 LAUNDRY 104 HSKP OFFICE 106 LOBBY 010 LINEN STORAGE 104A MDF ROOM 127 2292 SF MEETING ROOM 125 L. CHUTE 131 ELEV. LOBBY 006 JAN 120 A.2 A.2 A.1 A.1 5.1 6 6 ELEV EL 1.1 1.1 H H H.1 H.1 H.3 AC LOUNGE BAR 007 PRE-FUNCTION 005 TRANSFORMER 100 GENERATOR 102 RESTROOM 119 RESTROOM 121 VEST. 013 F F D.2 D.2 ART PIECE LIBRARY 124 VESTIBULE 128 METAL PANEL FENCE METAL PANEL FENCE W/ 10FT GATE CONCRETE CAST -IN - PLACE BENCH WITH WOOD SEATS. RE: LANDSCAPE ALIGN AL I G N 3.3 3.3 3.2 3.2 3.1 3.1 ALIGN ENG. OFF 638 BOH CIRC 001 SLOPE STORAGE 110 STAFF TLT 108 LIQ. CLOSET 109A 05 - 2 8 - 2 0 1 9