Loading...
HomeMy WebLinkAboutA5.02_EastWestElevations_2021_09_13 ELEVATION GENERAL NOTES EXTERIOR ELEVATION LEGEND KEY PLAN D Drown by:n by: RONG�&ERIK Archlect of Record: Vince Chupka 1. PROVIDE 12"MINIMUM OF SLOPE AWAY FROM WALL ON TOP 6. REFER TO ELECTRICAL DRAWINGS FOR EXTERIOR LIGHT EF EXTERIOR FINISHES SF STOREFRONT Date Plotted: SURFACE OF WALL PROJECTIONS. FIXTURE LOCATIONS. EF-1 FIBER CEMENT SIDING-PAINT FINISH SF-1 ALUMINUM-FRAMED WINDOW Issue for Pricing/Bitleing: EF-2 VERTICAL SIDING-PAINT FINISH SF-2 ALUMINUWFRAMED DOOR 2. MOUNT ALL EXTERIOR LIGHT FIXTURES AT T-6"A.F.F.U.N.O. 7. SIGNS SHALL BE INSTALLED BY A LICENSED SIGN EF-3 HORIZONTAL SIDING-PAINTFINISH CONTRACTOR,UNDER SEPARATE PERMIT. EF4 STONE SIDING-CORNADO M METALS Issue for Permit Application; 3. GRADES AROUND ALL EXTERIOR WALLS OF THE BUILDING(S) M-1 PERFORATED METAL PANELS SHALLBE6-BINCHES BELOW THE ADJACENT FINISHED 8.ALL GRILLES,VENTS AND LOUVERS SHALL BE PAINTED TO M-2 VERTICAL METAL SIDING Issue for Conanction FLOOR;GRADE SHALL SLOPE AWAY FROM BUILDING AT A MATCH ADJACENT FIELD COLOR,AS APPROVED BY D DOORS M-3 METAL AWNING-PAINT FINISH MINIMUM OF 2%. ARCHITECT. D-1 FIBERGLAS FRENCH DOOR D-2 METAL DOOR R ROOFING Revisions: 4. FLASHING,WATERPROOF MEMBRANES,PROPER CAULKS 9.EXTERIOR WALLS SHALL HAVE NO OPENINGS CLOSER THAN R-1 TPO ROOFING 2� �1 # DATE COMMENTS AND SEALANTS(AND BACKER RODS,AS REQUIRED)SHALL T-0"FIRE SEPARATION DISTANCE. W WINDOWS R-2 COMPOSITE SHINGLES BE INSTALLED AROUND ALL WINDOWS,DOORS,ROOF W-1 VINYL WINDOW OPENINGS,INTERSECTIONS OF HORIZONTAL AND VERTICAL 10.CHANGES IN EXTERIOR MATERIALS,FINISHES AND COLOR MI MISCELLANEOUS JOINTS OF DISSIMILAR MATERIALS,MATERIAL TRANSITIONS, TO OCCUR AT INSIDE CORNERS,ANY CONFLICTS TO BE MI-1 BUILDING ADDRESS AND SIGNS TRIMS,ROOF DECKS AND OTHER WEATHER-EXPOSED BROUGHT TO THE ATTENTION OF THE PROJECT ARCHITECT PER DEFERRED SIGNAGE PACKAGE AREAS. MI-2 WOOD FRAMED CANOPY WITH NORTH 5. PROVIDEAWATER-TIGHT BUILDING(S),ROOF AND EXTERIOR TPO ROOFING ENVELOPE WHICH SHEDS WATER PROPERLY. MI-3 WOOD FRAMED CANOPY WITH EXPOSED FRAMING a 2019 by Humphreys&Partners Architects,L.P. All Rights Reserved The architect al works depicted herein are the sole property of Humphreys&Partners Architects, L.P.and may not be constructed or used without its express written permission.No permission to modify or reproduce any of the architectural works,including without limitation the construction of any building,is expressed or should be implied from delivery of preliminary drawings or unsealed construction drawings.Permission to construct the building depicted in sealed construction drawings is expressly conditioned on the full and timely payment of all fees otherwise due Humphreys 8 P-mers Architects,L.P.and,in the absence of any written agreement to the contrary, is limited to a one-mne use on the site indicated on these plans. B C T T F G UNIT 82-ALT-1 UNIT 32-3 UNIT At UNIT B2 LEVEL 1 TO LEVEL 10 3 LEVEL 1 TO LEVEL 1 TO 2 EF-3 MI-2 EF-1 EF-2 q M-1 EF-2 1 7 T EF-3 q R-2 78 A7.83 A7.70 DOWN A7.83 CYLINDER _ — LIGHT T.O.PARAPET _ ROOF - 785 - - - CVLINDER CVLINDER _ _ - _ _ — TOP PLATE tw UJ k m q LEVEL-3T,Q,SHEATHIN �� , a - - - - - - - - - O Uj U) m - - - _ - — — LEVEL-2 T.O.SHEATHIN = Q WINDOW HEAD _ 0 I 1 _ _ w J _ A7.81 Z ❑ A7 -." i J�ri�n ❑ ❑� --- -- -- - ❑❑ - mrn < m �I _ - - _ _ -00 - - - LEVEL-1 N LLI LU m c� 2 2 O6 A7.82 A7.80 7 A7.60 W m w 0 Cy') n� WEST ELEVATION These drawings are for preliminary coordination only and not to be used for regulatory approval or construction. T F E T C B A UNITA1-A@ 1STLEVEL N Y UNIT B2 UNIT Bi-1 UNIT Bi-1 UNIT-Ai @ LEVEL 2ND&3RD UNIT B24 O LEVEL 1 TO LEVEL 1 TO 3 LEVEL 1 TO UP/DOWN LEVEL 1 TO W zz Z CYLINDER E-2 R-2 EF-3 EF-1 EF4 + EFJ EF-1 1 EF-2 + q LIGHTS Ell M-1 r EF3 - Z Z¢¢' U u� A7.7p u.ae A7.B3 ems' � Z Z O w6 DOWN TO. a xx� p V O CYLINDER — — — — — — — — — PARAPET LIGHT U E HEAD w 0 q E ❑ POPO ❑ ❑❑ ❑ - - ❑❑❑ 0 ❑❑ ❑ _ # . o 0 -_ - -_ ❑ I I W = � rn �z 00 0 U =�Z LE EL-3 T.O.SHEATHIN — - L < Q w= U _ I WINDOW HEAD — _ C `n co 0 ❑ ❑� ❑1:1OWALLPACK�❑ ❑� ❑❑ �r WALLPACK _ 4 C� U a�p LE - 00o u a _ _ _ - - - LE EL-2 T.O.SHEATHIN _ g Z > - -. _ — — — — — - - — — - o N _ a j ❑ ❑❑ ❑❑ ❑❑ HEI ❑ _ — �VINDOWAEAD - O co IFF C:) LE EL-1 CD 0 1 6 w A7.65 A7.40 w SHEET CONTENTS: m U EAST&WESTZD ELEVATIONS U) E SHEET NO. _ EAST ELEVATION A5.02 SCALE:1/8"=1'-0" 0 LU w LL N 15621