HomeMy WebLinkAboutA5.02_EastWestElevations_2021_09_13 ELEVATION GENERAL NOTES EXTERIOR ELEVATION LEGEND KEY PLAN D Drown by:n by: RONG�&ERIK
Archlect of Record: Vince Chupka
1. PROVIDE 12"MINIMUM OF SLOPE AWAY FROM WALL ON TOP 6. REFER TO ELECTRICAL DRAWINGS FOR EXTERIOR LIGHT EF EXTERIOR FINISHES SF STOREFRONT Date Plotted:
SURFACE OF WALL PROJECTIONS. FIXTURE LOCATIONS. EF-1 FIBER CEMENT SIDING-PAINT FINISH SF-1 ALUMINUM-FRAMED WINDOW Issue for Pricing/Bitleing:
EF-2 VERTICAL SIDING-PAINT FINISH SF-2 ALUMINUWFRAMED DOOR
2. MOUNT ALL EXTERIOR LIGHT FIXTURES AT T-6"A.F.F.U.N.O. 7. SIGNS SHALL BE INSTALLED BY A LICENSED SIGN EF-3 HORIZONTAL SIDING-PAINTFINISH
CONTRACTOR,UNDER SEPARATE PERMIT. EF4 STONE SIDING-CORNADO M METALS Issue for Permit Application;
3. GRADES AROUND ALL EXTERIOR WALLS OF THE BUILDING(S) M-1 PERFORATED METAL PANELS
SHALLBE6-BINCHES BELOW THE ADJACENT FINISHED 8.ALL GRILLES,VENTS AND LOUVERS SHALL BE PAINTED TO M-2 VERTICAL METAL SIDING Issue for Conanction
FLOOR;GRADE SHALL SLOPE AWAY FROM BUILDING AT A MATCH ADJACENT FIELD COLOR,AS APPROVED BY D DOORS M-3 METAL AWNING-PAINT FINISH
MINIMUM OF 2%. ARCHITECT. D-1 FIBERGLAS FRENCH DOOR
D-2 METAL DOOR R ROOFING Revisions:
4. FLASHING,WATERPROOF MEMBRANES,PROPER CAULKS 9.EXTERIOR WALLS SHALL HAVE NO OPENINGS CLOSER THAN R-1 TPO ROOFING 2� �1
# DATE COMMENTS
AND SEALANTS(AND BACKER RODS,AS REQUIRED)SHALL T-0"FIRE SEPARATION DISTANCE. W WINDOWS R-2 COMPOSITE SHINGLES
BE INSTALLED AROUND ALL WINDOWS,DOORS,ROOF W-1 VINYL WINDOW
OPENINGS,INTERSECTIONS OF HORIZONTAL AND VERTICAL 10.CHANGES IN EXTERIOR MATERIALS,FINISHES AND COLOR MI MISCELLANEOUS
JOINTS OF DISSIMILAR MATERIALS,MATERIAL TRANSITIONS, TO OCCUR AT INSIDE CORNERS,ANY CONFLICTS TO BE MI-1 BUILDING ADDRESS AND SIGNS
TRIMS,ROOF DECKS AND OTHER WEATHER-EXPOSED BROUGHT TO THE ATTENTION OF THE PROJECT ARCHITECT PER DEFERRED SIGNAGE PACKAGE
AREAS.
MI-2 WOOD FRAMED CANOPY WITH NORTH
5. PROVIDEAWATER-TIGHT BUILDING(S),ROOF AND EXTERIOR TPO ROOFING
ENVELOPE WHICH SHEDS WATER PROPERLY. MI-3 WOOD FRAMED CANOPY WITH EXPOSED FRAMING
a 2019 by Humphreys&Partners
Architects,L.P.
All Rights Reserved
The architect al works depicted herein are the
sole property of Humphreys&Partners Architects,
L.P.and may not be constructed or used without
its express written permission.No permission to
modify or reproduce any of the architectural
works,including without limitation the construction
of any building,is expressed or should be implied
from delivery of preliminary drawings or unsealed
construction drawings.Permission to construct
the building depicted in sealed construction
drawings is expressly conditioned on the full and
timely payment of all fees otherwise due
Humphreys 8 P-mers Architects,L.P.and,in the
absence of any written agreement to the contrary,
is limited to a one-mne use on the site indicated
on these plans.
B C T
T
F G
UNIT 82-ALT-1 UNIT 32-3 UNIT At UNIT B2
LEVEL 1 TO LEVEL 10 3 LEVEL 1 TO LEVEL 1 TO
2
EF-3 MI-2 EF-1 EF-2 q M-1 EF-2 1 7
T
EF-3 q R-2 78
A7.83 A7.70 DOWN A7.83
CYLINDER _ —
LIGHT
T.O.PARAPET
_ ROOF
-
785 - - - CVLINDER CVLINDER _ _ - _ _ — TOP PLATE
tw
UJ k
m
q LEVEL-3T,Q,SHEATHIN
�� ,
a - - - - - - - - - O
Uj U)
m
- - - _ - — — LEVEL-2 T.O.SHEATHIN = Q
WINDOW HEAD _
0 I 1 _ _ w J
_ A7.81 Z
❑ A7 -." i J�ri�n ❑ ❑� --- -- -- - ❑❑ - mrn < m
�I _ - - _ _ -00 - - - LEVEL-1 N LLI
LU m c�
2 2 O6 A7.82 A7.80 7
A7.60
W m
w 0
Cy')
n� WEST ELEVATION
These drawings are for
preliminary coordination
only and not to be used
for regulatory approval or
construction.
T
F E T
C B A
UNITA1-A@ 1STLEVEL N Y
UNIT B2 UNIT Bi-1 UNIT Bi-1 UNIT-Ai @ LEVEL 2ND&3RD UNIT B24 O
LEVEL 1 TO LEVEL 1 TO 3 LEVEL 1 TO UP/DOWN LEVEL 1 TO W zz Z
CYLINDER
E-2 R-2 EF-3 EF-1 EF4 + EFJ EF-1 1 EF-2 + q LIGHTS Ell M-1 r EF3 - Z Z¢¢' U
u� A7.7p u.ae A7.B3 ems' � Z Z O
w6
DOWN TO.
a xx� p V O
CYLINDER — — — — — — — — — PARAPET
LIGHT U E
HEAD w 0 q E
❑ POPO
❑ ❑❑ ❑
- - ❑❑❑ 0 ❑❑ ❑ _ # . o 0
-_ - -_ ❑ I I W = � rn �z
00 0
U =�Z
LE EL-3
T.O.SHEATHIN — - L < Q w=
U
_ I WINDOW HEAD — _ C `n co 0
❑ ❑� ❑1:1OWALLPACK�❑ ❑� ❑❑ �r WALLPACK _ 4 C� U a�p
LE - 00o u a _
_ _
- - - LE EL-2 T.O.SHEATHIN _ g Z
> - -. _ — — — — — - - — — - o N
_
a
j ❑ ❑❑ ❑❑ ❑❑ HEI
❑ _ — �VINDOWAEAD - O
co IFF
C:)
LE EL-1
CD
0 1 6
w
A7.65 A7.40
w
SHEET CONTENTS: m
U
EAST&WESTZD
ELEVATIONS U)
E
SHEET NO. _
EAST ELEVATION A5.02
SCALE:1/8"=1'-0" 0
LU
w
LL N 15621