Loading...
HomeMy WebLinkAbout08 A7East&WestElevationsMAIN T.O. FLOOR 100' -0" SECOND FLOOR 110' -5 7/8" THIRD FLOOR 120' -11 3/4" THIRD T.O. PLATE 130' -0 7/8" 1 3 1 5 6 MAIN T.O. FLOOR 100' -0" SECOND FLOOR 110' -5 7/8" THIRD FLOOR 120' -11 3/4" THIRD T.O. PLATE 130' -0 7/8" UTILITY METERS SCREEN PER 38.520.070.D. 6"&4" CEDAR BOARDS 4X4 POST METER BANK ROOF PROTECTION. 'JAMES HARDIE' FIBER CEMENT LAP BOARD 5" EXPOSURE COLOR: SW 6252 ICE CUBE 'JAMES HARDIE' FIBER CEMENT LAP BOARD 10.75" EXPOSURE COLOR: SW 6994 GREENBLACK 'MALARKEY' WINDSOR ROOF SHINGLES COLOR: MIDNIGHT BLACK CLEAR STAINED RED CEDAR W/ 5" EXPOSURE, TONGUE & GROOVE NICKLE REVEAL 'ANDERSEN' E -SERIES DOORS AND WINDOWS -ALUM. EXTERIOR COLOR: DARK BRONZE 1 3 4 2 OCL VEGA WALL SCONCE -LED DOWNLIGHT ONLY HALF -ROUND COPPER GUTTER AND ROUND DOWNSPOUTS MATERIAL LEGEND 5 6 7 'JAMES HARDIE' FIBER CEMENT BOARD & BATTEN 16" O.C. COLOR: SW 6994 GREENBLACK BIM FILE PATH: SHEET NO.: TITLE: copyright 2020 Cadius Partners, LLC REVISIONS: KEYMAP: PROJECT: PROJECT LOCATION: PREPARED FOR: LOGO: CONSULTANT: PROJECT NUMBER: DRAWN CHECKED TEAM: PHASE: DATE: PROJECT NUMBER: Plo t 23 APEX DRIVE Bozeman | MT | 59718 C:\Users\BlakePreszler\Desktop\Alderson 4\Alderson 5 LTD revised city comments.rvt 10 / 2 9 / 2 0 2 1 9 : 1 1 : 4 2 A M A7 00 08/11/2021 EAST & WEST ELEVATIONS Author Checker ALDERSON V 00 806 W. ALDERSON ST BOZEMAN, MT SITE PLAN SUBMITTAL 3/16" = 1'-0" A7 1 EAST ELEVATION NO. DATE REVISION DESCRIPTION 2 10/22/21 SP1 REV2 3/16" = 1'-0" A7 2 WEST ELEVATION BLOCK FRONTAGE -FACADE TRANPARENCY TOTAL FACADE: 993 SF GLAZING TRANSPARENCY: 152 SF 15% REQUIRED 15% PROVIDED MIN. TRANSPARENCY HEIGHT: 2'6 MAX. TRANSPARENCY HEIGHT: 30' 2