Loading...
HomeMy WebLinkAbout01 A0.2ArchitecturalSitePlan&DemoPlanW ALDERSON ST S 8 T H A V E AL L E Y ( 1 4 ' ) N UNIT A UNIT B UNIT C UNIT D PROPERTY LINE 131' PR O P E R T Y L I N E 7 5 ' PR O P E R T Y L I N E 7 5 ' WALK 5' - 0" F.F: +100.00'F.F: +100.00' COVERED ENTRY 2 STALL GARAGE 22 ' - 0 " MOUNTABLE CURB SNOW STORAGE AREA 40 ' V ISION T RIA NGL E ALLEY VISION TRIANGLE 7' - 0" 7' - 0" 15' - 0" SI D E W A L K BO U L E V A R D EXISTING STREET TREE TO REMAIN SID E W A L K BO U L E V A R D EXISTING STREET TREE TO REMAIN PROPOSED STREET TREE PER UDC SEC 16.05.330. PROPOSED STREET TREE PER UDC SEC 16.05.330. BOULEVARD SIDEWALK BOUEVARD SIDEWALK PROPERTY LINE 131' DR I V E V I S I O N T R I A N G L E SNOW STORAGE AREA S W UNIT E GRAY INDICATES PRIVATE OUTDOOR SPACE 2 STALL GARAGE 2 STALL GARAGE 20' - 7" 32" HEDGE PLANTINGS AWNING ABOVE RESIDENTIAL ENTRY FACING 8TH AVE UTILITY METERS SCREEN PER 38.520.070.D. STREET LIGHT POWER POLE POWER POLE E G 4' SITE FENCE GRAY INDICATES PRIVATE OUTDOOR SPACE GRAY INDICATES PRIVATE OUTDOOR SPACE GRAY INDICATES PRIVATE OUTDOOR SPACE GRAY INDICATES PRIVATE OUTDOOR SPACE 4' - 1" 2 STALL GARAGE 32" HEDGE PLANTINGS 32" HEDGE PLANTINGS 32" HEDGE PLANTINGS 4' FENCE 4' FENCE 4' FENCE FIRE RISER 2' - 0" 2' - 0" A/C UNITS SCREEN PER 38.520.070.D. 5' - 0 " COVERED ENTRY COVERED ENTRY COVERED ENTRY 7' X 24' PARKING STALL 7' X 24' PARKING STALL 40' - 0" EXISTING "NO PARKING FROM HERE TO CORNER" SIGN 7' X 2 4 ' PA R K I N G S T A L L 40 ' - 0 " EXISTING "NO PARKING FROM HERE TO CORNER" SIGN UTL. EASEMENT 10' - 0" PEDESTRIAN ACCESS SIDEWALK B U F F E R 5 ' - 0 " D R I V E A I S L E 2 4 ' - 0 " 2 2 ' - 0 " 2 2 ' - 0 " 2 2 ' - 0 " 2 ' - 0 " AWNING ABOVE AWNING ABOVE 5 ' - 0 " 20' - 8" 20' - 8" 20' - 6" 9' X 20' STALL 9' X 20' STALL 9' X 20' STALL 9' X 20' STALL 9' X 20' STALL 9' X 20' STALL 9' X 20' STALL 9' X 20' STALL 3 ' - 8 " 3 ' - 8 " R E A R S E T B A C K 2 0 ' - 0 " F R O N T S E T B A C K 1 5 ' - 0 " REAR SETBACK 20' - 0" FRONT SETBACK 15' - 0" 4 ' - 6 " SNOW STORAGE AREA SNOW STORAGE AREA 2 ' - 0 " WALK 5' - 0" WALK 5' - 0" WALK 5' - 0" CLEAR ZONE PER NWE 3' - 0" 3 DEMOLISH ALL EXISTING STRUCTURES IN THEIR ENTIRETY REMOVE EXISTING DRIVES AND WALKS IN THEIR ENTIRETY REPAIR ALL CURB,GUTTER, AND SIDWALKS AS NECESSARY REMOVE ALL EXISTING TREES BIM FILE PATH: SHEET NO.: TITLE: copyright 2020 Cadius Partners, LLC REVISIONS: KEYMAP: PROJECT: PROJECT LOCATION: PREPARED FOR: LOGO: CONSULTANT: PROJECT NUMBER: DRAWN CHECKED TEAM: PHASE: DATE: PROJECT NUMBER: Plo t 23 APEX DRIVE Bozeman | MT | 59718 C:\Users\BlakePreszler\Desktop\Alderson 4\Alderson 5 LTD revised city comments.rvt 12 / 2 3 / 2 0 2 1 7 : 4 9 : 0 8 A M A0.2 00 08/11/2021 ARCHITECTURAL SITE PLAN & DEMO PLAN Author Checker ALDERSON V 00 806 W. ALDERSON ST BOZEMAN, MT SITE PLAN SUBMITTAL 1/8" = 1'-0" A0.2 1 SITE PLAN R-4 FORM & INTENSITY STANDARDS BOZEMAN MUNICODE 2020 - SEC 38.320 AREA SF % OR RATIO LOT AREA 9825 100% BUILDING FOOTPRINT 3207 32% TOTAL FLOOR AREA 9382 95% MAX. ALLOWABLE LOT COVERAGE 4912.5 50% LOT COVERAGE (PROPOSED) 3207 32% MAX. ALLOWABLE FLOOR AREA RATIO 9825 1:1 FLOOR AREA RATIO (PROPOSED) 9382 .95:1 MAX BUILDING HEIGHT(38.320.020.D) 50' >3:12 BUILDING HEIGHT (PROPOSED) 45'-8" 3/12;14/12 BOZEMAN MUNICODE 2020 -TABLE 38.540.050 -1 UNIT A 2-BEDROOM 2 PARKING SPACES UNIT B 2-BEDROOM 2 PARKING SPACES UNIT C 2-BEDROOM 2 PARKING SPACES UNIT D 3-BEDROOM 3 PARKING SPACES UNIT E 1-BEDROOM 1.5 PARKING SPACES TOTAL PARKING REQUIRED: 10.5 PARKING SPACES 8 PARKING SPACES PROVIDED IN GARAGES 3 PARKING SPACES PROVIDED ON STREET TOTAL PARKING PROVIDED: 11 PARKING SPACES PARKING CALCULATIONS A. REFER TO LANDSCAPE DRAWINGS FOR ALL PLANTER AND LANDSCAPED AREAS. B. REFER TO CIVIL DRAWINGS FOR GRADING, DRAINAGE AND ADDITIONAL TOPOGRAPHIC INFORMATION. C. PROVIDE POSITIVE DRAINAGE AWAY FROM ALL STRUCTURES 5% MINIMUM FOR THE FIRST 10 FEET. D. AN APPROVED GRADING & DRAINAGE PLAN SHALL BE KEPT ON SITE AT ALL TIMES. DEVIATIONS FROM THE PLAN MUST BE PRECEDED BY AN APPROVED REVISION. E. REFER TO CIVIL FOR UTILITY INFORMATION. CONTRACTOR TO PROVIDE SOIL COMPACTION TEST RESULTS AS REQUIRED TO THE CITY ENGINEER'S OFFICE. F. COORDINATE WITH ALL UTILITY COMPANIES FOR FINAL LOCATION OF METERS, DEVICES, AND ROUTING. CONTRACTOR TO PROVIDE ALL REQUIRED MATERIAL AND LABOR FOR INSTALLATION OF ALL REQUIRED UTILITIES. G. MAINTAIN A MINIMUM DISTURBANCE OF SITE DURING CONSTRUCTION. H. EXCESS FILL DIRT (IF ANY) TO BE HAULED AWAY OR DISPOSED OF PER THE OWNER'S REQUEST. I. VERIFY WITH THE OWNER THE DEMOLITION OR RELOCATION OF ALL EXISTING LANDSCAPE MATERIALS AND SITE ITEMS PRIOR TO COMMENCEMENT OF NEW CONSTRUCTION. J. CONTRACTOR SHALL FIELD VERIFY ALL SITE ITEMS AND THE COORDINATION OF NEW CONSTRUCTION WITH ZONING SETBACK REQUIREMENTS. NOTIFY ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES. K. VERIFY ALL GRADES IN FIELD. L. SEE ELECTRICAL SHEETS FOR SWITCHING OF EXTERIOR ELECTRICAL. M. SUBGRADE TO BE COMPACTED TO 95% OF MAXIMUM DENSITY WITH CONCRETE SLAB OVER A.B.C. AS SPECIFIED ON THE STRUCTURAL DRAWINGS. N. WATERPROOF ALL ABOVE -GROUND PLANTERS AND RETAINING WALLS. O. ALL MECHANICAL EQUIPMENT SHALL BE SCREENED, WHERE APPLICABLE, A MINIMUM OF 1'-0" HIGHER THAN THE HIGHEST PORTION OF THE EQUIPMENT, AND SHALL MATCH THE ADJACENT BUILDING MATERIAL. P. USE A NATURAL PLACEMENT OF STONES HARVESTED FROM THE SITE AND INTERSPERSE WITH APPROPRIATE VEGETATION. THE STONES SHOULD NOT BE PILED ON THE GROUND BUT INSET INTO THE SOIL SPARINGLY SO THAT THE NET APPEARANCE IS 50% SOIL AND 50% VISIBLE STONE. VISIT DC RANCH SAMPLE YARD FOR BUILT EXAMPLE. Q. PROVIDE 36" GUARDRAILS AT ALL CHANGE IN ELEVATIONS THAT ARE GREATER THAN 30" (R312). GEN. SITE PLAN NOTES BOZEMAN MUNICODE -SEC. 38.520.060 UNIT A -2 BEDROOM PROVIDED : 150 REQ. GROUND LEVEL PRIVATE 509 SF UNIT B -2 BEDROOM PROVIDED : 150 REQ. GROUND LEVEL PRIVATE 184 SF UNIT C -2 BEDROOM PROVIDED : 150 REQ. GROUND LEVEL PRIVATE 184 SF UNIT D -3 BEDROOM PROVIDED : 150 REQ. GROUND LEVEL PRIVATE 487 SF UNIT E -1 BEDROOM PROVIDED : 100 REQ. GROUND LEVEL PRIVATE 319 SF TOTAL REQUIRED = 700 SF TOTAL PROVIDED: 1,683 SF OPEN SPACE CALCULATIONS NO. DATE REVISION DESCRIPTION 2 10/22/21 SP1 REV 2 3 12/10/2021 SP1 REV 3 1" = 60'-0" A0.2 2 DEMO SITE PLAN A. PROTECT TO THE EXTENT POSSIBLE ALL LANDSCAPE AND SITEWORK THAT IS TO REMAIN DURING DEMOLITION AND CONSTRUCTION. B. VERIFY WITH OWNER ALL ITEMS THAT ARE SHOWN ON THE DEMO PLAN TO BE REMOVED PRIOR TO REMOVING OR DEMOLITION. C. PROMPTLY REMOVE ALL MATERIAL AND DEBRIS REMOVED DURING DEMOLITION FROM THE PROPERTY, AND DISPOSE OF THEM IN ACCORDANCE WITH LOCAL ORDINANCES. D. SECURE THE PROPERTY TO THE EXTENT POSSIBLE DURING DEMOLITION. E. IF HAZARDOUS MATERIALS SUCH AS ASBESTOS ARE ENCOUNTERED, CEASE WORK AND IMMEDIATELY NOTIFY THE OWNER AND CONSTRUCTION MANAGER WHO WILL ARRANGE APPROPRIATE MITIGATION. DO NOT COMMENCE WORK UNTIL MITIGATION IS CERTIFIED. DEMO NOTES 2 3 3 2