Loading...
HomeMy WebLinkAbout22013 Application Summary BOZEMANMT Community Development DEVELOPMENT REVIEW APPLICATION Please remember to obtain owner signature on this form prior to uploading with the rest of your submittal.(Digital signature acceptable.) PROJECT INFORMATION Project Name: North Park Tract 4-B Mass grading Project Type(s): Site Plan SP Street Address: West of the North 7th railroad overpass and South of the railroad tracks. Section 36,Township 01 S, Range 05E,C.O.S.2153A,Parcel Tract 4-B; P.M.M.,Gallatin County,MT Legal Description: The mass grading proposed within Tract 4-B would allow for about 55,000 cubic yards of material to be generated.This material will be used as fill for Description of Project: the proposed railroad siding along the existing main rail line.Red Wing Drive would be used as a haul road after the abandonment of the existing road easement within the MRL right-of-way. Current Zoning: M-2 Manufacturing and Industrial District Existing Use: Undeveloped Proposed Use: Commercial, Industrial Gross Lot Area: 413175 Number of Buildings: rNumberofNewBuildingsl Type and Number of Dwellings: 0 Building Size(SF): 0 Non-Residential Building Size(SF): 0 Building Height(ft): 0 Affordable Housing (Y/N): rAffordableHousingl Departure/Deviation Request(Y/N): No PROPERTY OWNER Company Name: Bozeman Trax Partners LLC Name: CaseyTippens Full Address: 5148 US 89,Livingston,MT 59047 Email: ctippens(d)-gmail.com Phone: (601)467-8300 APPLICANT Company Name: Allied Engineering Services Name: Eric Foss Full Address: 32 Discovery Drive,Bozeman,Montana 59718 Email: efoss(aD-alliedengineering.com Phone: (406)582-0221 REPRESENTA Company Name: Allied Engineering Services Name: Eric Foss Full Address: 32 Discovery Drive , Bozeman, Montana 59718 Email: efoss(a-)alliedengineering.com Phone: (406)582-0221 CERTIFICATIONS AND SIGNATURES Applicant signature is captured electronically at time of application submittal.This application(PDF)must also be signed by the property owner(s)for all application types before the submittal will be accepted.The only exception to this is an informal review application that may be signed by the applicant(s)only.The applicant(s)and property owner(s)submit this application for review under the terms and provisions of the Bozeman Municipal Code. It is further indicated that anywork undertaken to complete a development approved by the City of Bozeman shall be in conformance with the requirements of the Bozeman Municipal Code and any special conditions established by the approval authority. I acknowledge that the City has an Impact Fee Program and impact fees may be assessed for my project.Further, I agree to grant City personnel and other review agency representative's access to the subject site during the course of the review process(Section 38.200.050, BMC). I(We)hereby certify that the above information is true and correct to the best of my(our)knowledge. Certification of Completion and Compliance-I understand that conditions of approval may be applied to the application and that I will comply with any conditions of approval or make necessary corrections to the application materials in order to complywith municipal code provisions. Statement of Intent to Construct According to the Final Plan-I acknowledge that construction not in compliance with the approved final plan may result in delays of pccupancy or costs to correct noncompliance. Property Owner Signature: Ala- Printed Name: CaseyTippens CONTACT US Alfred M.Stiff Professional Building phone 406-582-2260 20 East Olive Street fax 406-582-2263 Bozemn,MT59715 planning@bozeman.net www.bozeman.net/planni ng