HomeMy WebLinkAboutResolution 3253 Change Order No. 1 for sludge lagoon rehabilitation n .._ _~...... _~ .,~" COMMISSION RESOLUTION NO. 3253 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH WILLIAMS PLUMBING AND HEATING. WHEREAS, the City Commission did, on the 15th day of September 1997, authorize award of the bid for the sludge lagoon expansion/rehabilitation at the Wastewater Treatment Plant to Williams Plumbing and Heating; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. '-- NOW, THEREFORE, BE IT RESOLveD by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Williams Plumbing and Heating, as contained in Change Order No.1, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change orders for and on behalf of the City; and the Clerk of the Commission is authorized and directed to attest such signature. PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 3rd day of August 1998. ~~~ ALF .' D M. STIFF, Mayor ~- ATTEST: OJ: ;/ ~ ROBIN L. SULLIVAN Clerk of the Commission APPROVED AS TO FORM: /' -~ ~:+ ,/ /Y Lt. ' -~ .Lt{JE! P'AUL J. L E City Attorney ._~"_.-- --- CHANGE ORDER ,.:.l ~j \..; ..'~ C :~: 'I:]8 (Instructions on following page) No. One (1) PROJECT: Citv of Bozeman Slude:e Lae:oon Rehabilitation/Exp ansion DA TE OF ISSUANCE: Julv I. 1998 EFFECTIVE DATE: OWNER: Citv of Bozeman OWNER's Contract No. CONTRACTOR: Williams Plumbing & Heatine: ENGINEER Morrison-Maierle. Inc. You are directed to make the following changes in the Contract Documents. Description: See Exhibit "A" Reason for Change Order: See Exhibit "A" Attachments: (List documents supporting change) CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price Original Contract Times Substantial Completion: $ 599,000.00 Ready for final payment: Days or dates Net changes from previous Change Orders No. ~ to No. ~ Net change from previous Change Orders No. _ to No. - $ 0.00 days Contract Price Prior to this Change Order Contract Time, Prior to this Change Order Substantial Completion: $ 599.000.00 Ready for final payment: Days or dates Net Increase (aeere8:3e) of this Change Order Net Increase (decrease) of this Change Order $ 8.212.73 $ Contract Price with all approved Change Orders Contract Times with all approved Change Orders Substantial Completion: $ 607,212.73 Ready for final payment: Days or dates APPROVED: ACCEPTED: BY: 9'I. ~ ~~\ BY:~)yVJY~ ~ Contractor (Authorized Signature) Owner (Authorized Signature) Date: 7-1-1'~ Date: August 3, 1998 Date: EJCDC No. 191O-8-B (1990 Edition) Prepared by the Engineers Jonit Contract Documents Committee and endorsed by The Associated General Contractors of America. ..-....-....-.-.-.----- ----.----. ____no ...__.. CHANGE ORDER INSTRUCTIONS A. GENERAL INFORMATION This document was developed to provide a uniform format for handling contract changes that affect Contract Price or Contract Times. Changes that have been initiated by a Work Change Directive must be incorporated into a subsequent Change Order if they affect Contract Price or Times. Changes that Affect Contract Price or Contract Times should be promptly covered by a Change Order. The practice of accumulating change order items to reduce the administrative burden may lead to unnecessary disputes. If Milestones have been listed any effect of a Change Order thereon should be addressed. For supplemental instructions and minor changes not involving a change in the Contract Price or Contract Times, a Field Order may be used. B. COMPLETING THE CHANGE ORDER FORM Engineer initiates the form, including a description of the changes involved and attachments based upon documents and proposals submitted by Contractor, or requests from Owner, or both. Once Engineer has completed and signed the form, all copies should be sent to Contractor for approval. After approval by Contractor, all copies should be sent to Owner for approval. Engineer should make distribution of executed copies after approval by Owner. If a change only applies to Contract Price or to Contract Times, cross out the part of the tabulation that does not apply. B:\MPW\CHG-ORD.FRM 8/0 l/96 -. .- ..--..----- SLUDGE LAGOONS REHABILITATION/EXPANSION PROJECT CITY OF BOZEMAN CONTRACT CHANGE ORDER NO.1 EXHIBIT A 1. DESCRIPTION: Additional length of ductile iron pipe to be installed. Design: Quantity: 5,147 LF Re-design: Quantity: 5,773 LF Difference: Quantity: 626 LF Installation cost per lineal foot of ductile iron pipe = $ 25.20 (See Williams Plumbing & Heating breakdown of bid item number 109) JUSTIFICATION: Re-design of pipe layout, to move valve boxes out of liner and to be able to install pipe without removing existing east lagoon out of service. Contract Price Increase = $15,775.20 2. DESCRIPTION: Pipe price difference between flanged 8-inch ductile iron pipe and push on 8-inch ductile iron pipe. Flanged: Quantity: 5,147 LF Price: $8.87/LF Amount: $45,653.89 Push-on: Quantity: 5,147 LF Price: $7.97/LF Amount: $41,021.59 Difference Amount: $ 4,632.30 JUSTIFICATION: Installation of push-on joint ductile iron pipe other than flanged joint ductile iron pipe as was bid. Contract Price Decrease = $ 4,632.30 3. DESCRIPTION: Labor price difference between flanged 8-inch ductile iron pipe and push on 8-inch ductile iron pipe with two(2) men conducting installation. Flanged: Quantity: 171.7 HR Price: $24/HR/Man Amount: $8,241.60 Push-on: Quantity: 160 HR Price: $24/HR/Man Amount: $7,680.00 Difference Amount: $ 561.60 JUSTIFICATION: Installation of push-on joint ductile iron pipe other than flanged joint ductile iron pipe as was bid. Contract Price Decrease = $ 561.60 4. DESCRIPTION: Repair perforated drain pipe damaged while installing 4-inch vent piping in new lagoon. Costs: $485.69 (See Williams Plumbing & Heating request for proposal #2) JUSTIFICATION: Drain pipe was higher than plans indicated. Need to maintain integrity of underground drain system. Contract Price Increase = $485.69 5. DESCRI PTION: Install new yard hydrant. Costs: $100.00 JUSTIFICATION: Replace existing rusted out yard hydrant. Contract Price Increase = $100.00 6. DESCRIPTION: Replace single manhole cleanouts with combination manhole cleanouts. Single: Quantity: 8 @ $127.50 each for total of $1,020.00 Combination:Quantity: 4 @ $133.50 each for total of $534.00 Difference: Amount: $486.00 (See copy of Anderson Precast & Supply invoice # 11119 for prices) JUSTIFICATION: Cleanouts located too close together to place each cleanout in a single manhole. Contract Price Decrease = $486.00 7. DESCRIPTION: Fill drainage ditch between new lagoon and I.P. bed number 18. Costs: $1,295.13 (See Williams Plumbing & Heating request for proposal #3) JUSTIFICATION: For the mowing purposes. Contract Price Increase = $1,295.13 __n_____ ____ _ ____ __..____n________________ ___________________________ __ _.u_____.....___ ~- __ __. ._._ ___ ._._._n_____.._ ___._ ---..-.."... ___..u_...._._ 8. DESCRIPTION: Install 3 foot wide concrete steps on north slope of rehabilitated lagoon from pump building to top of slope. Costs: $441.60 (See Williams Plumbing & Heating request for proposal #4) JUSTIFICATION: Replace the concrete steps that were to be undisturbed according to original plans. Contract Price Increase = $441.60 9. DESCRIPTION: Add two (2) clean-outs to the piping system. Costs: $2,195.01 (See Williams Plumbing & Heating request for proposal #5) JUSTIFICATION: To accommodate the redesign of the piping system. Contract Price Increase = $2,195.01 10. DESCRIPTION: Delete gravel from the top of new lagoon. Costs: $6,400.00 (See fax from Williams Plumbing & Heating) JUSTIFICATION: To keep gravel from falling into the lagoon and being sucked into the pumps. Contract Price Decrease = $6,400.00 TOTAL AMOUNT OF CHANGE ORDER No.1 =$8,212.73 (Increase in contract amount) WilLIAMS PLUMBING & HEATING BREAKDOWN OF BID ITEM NUMBER 109 (Install new 8-inch ductile iron suction and recirculation piping...) AS BID - PER WILLIAMS PLUMBING & HEATING MATERIALS TAKE-OFF COST DESCRIPTION QUANTITY UNIT MATERIAL SUBCONTRACT LABOR EQUIPMENT ESTIMA TE PIPING MATERIALS 4560 LF $8.87 $0.00 $0.00 $0.00 $40,447.20 VALVE BOXES 24 EA $75.00 $0.00 $0.00 $0.00 $1,800.00 CLEANOUTS 54 EA $135.00 $0.00 $0.00 $0.00 $7,290.00 PIPING 1 LS $81,771.45 $0.00 $0.00 $0.00 $81,771.45 BEDDING 507 CY $8.00 $0.00 $0.00 $0.00 $4,056.00 CONCRETE TRUST 76 EA $65.00 $0.00 $0.00 $0.00 $4,940.00 LABOR 152 HR $0.00 $0.00 $172.00 $0.00 $26,144.00 EQUIPMENT 152 HR $0.00 $0.00 $0.00 $295.00 $44,840.00 TOT AL= $211,288.65 AS BID ~ PER ENGINEEHING MATERIALS TAKE-OFF COST DESCRIPTION QUANTITY UNIT MATERIAL SUBCONTRACT LABOR EQUIPMENT ESTIMA TE PIPING MATERIALS 5104 LF $8.87 $0.00 $0.00 $0.00 $45,272.48 VALVE BOXES 24 EA $75.00 $0.00 $0.00 $0.00 $1,800.00 CLEANOUTS 54 EA $135.00 $0.00 $0.00 $0.00 $7,290.00 PIPING 1 LS $81,771.45 $0.00 $0.00 $0.00 $81,771.45 BEDDI NG 567 CY $8.00 $0.00 $0.00 $0.00 $4,536.00 CONCRETE TRUST 76 EA $65.00 $0.00 $0.00 $0.00 $4,940.00 LABOR HR $0.00 $172.00 - $0.00 $29,240.00 170 $0.00 EQUIPMENT 170 HR $0.00 $0.00 $0.00 $295.00 $50,150.00 TOTAL= $224,999.93 DIFFERENCE IN TOTALS $224,999.93 $211,288.65 $13,711.28 DIFFERENCE IN LINEAL FOOTAGE 5104 4560 544 INSTAllATION COST PER LINEAL FOOT OF PIPE $13,711.28/544 ~ $25.20 I NOTE: This unit price was arrived at using the contractor's and engineer's material take-offs for the lump sum Bid Item NO.1 09. The estimated take-offs are different from the design and re-design quantities. H:\417\028\06\CHANGE 1'wB3 - doc#excellad min/bzmn Ig n. xis BOZEMAN SLUDGE LAGOON REHAB Wage & Burden Schedule I I LABORER LABORER LABORER Description % FOREMAN OPERATOR GROUP 4 GROUP 3 GROUP 2 Base Rate 19.74 16.74 15.15 14.43 14.29 Fringes 2.37 4.37 3.80 3.80 3.80 TOTAL WAGES 22.11 21.11 18.95 18.23 . 18.09 State U.C. 2.00% 0.44 0.42 0.38 0.36 0.36 Fed U.C. 0.80% 0.18 0.17 0.15 0.15 0.14 Worl, Compo 14.59% 3.23 3.08 2.76 2.66 2.64 OFL T Tax 0.50% 0.11 0.11 0.09 0.09 0.09 FICA 7.65% 1.69 1.61 1.45 1.39 1.38 Liability 4.08% 0.90 0.86 0.77 0.74 0.74 TOTAL $ 28.66 $ 27.36 $ 24.56 $ 23.63 $ 23.45 - . ~ ---..--- . __ _.___n......__.._.__.... H\WINDOWS\EXCEL5\1996\ML 1028.xLS BOZEMAN SLUDGE LAGOON CHANGE ORDER NO 2 JOB LOCATION: BOZEMAN, Montana CONTRACTOR: WILLIAMS PLUMBING & HEATING, INC. Engineer: Morrison & Maierle ADDRESS: 2131 INDUSTRIAL DRIVE BOZEMAN, MT 59715 PHONE: (406) 587-0969 main office DATE: 11-04-97 DAY MONDAY WORK REQUESTED BY: CITY & ENGINEER ::j,:\,"(L'" DJ,;$,~RIPTIONQI;:;W~R~IQ .....-...--., ,.. ...." .....-. ---- .,.- ".. ..-. ,. ,. - - .---.""..... '8" Perferated Drain was higher than shown on plans--Broke while installing 4" vent pipe ._._..._......__ __..__ .. __..._ .__.___n._..'''..__....' ______.___..__._ Jif?.... ;1;';:.iMATERIAL xEA"CH........ " "i!/j,IVJP\..!NI.ii,';ii::::':, PVC Replacenent pipe TOTAL MATERIAL G.'Ii:8EQH9,lJ~SS:;R~Q::Fm:1ii!$.::.: itpit;:: .9i~:'~.~ 4-Nov 0.00 1.00 $ 28.66 4-Nov 0.00 4.00 $ 27.36 4-Nov 0.00 4.00 $ 24.56 $ i,j::;i:.EQlJIPMENT,::';:";'il:l":. ' Samsung 130 w/bucket VEHICLE @ $0.35 PER MILE Note: Mobilization costs as incurred. Note: 15% to be applied to work orders for overhead and 63.35 WILLIAMS PLUMBING & HEATING SIGNATURE: DATE: City of Bozeman REPRESENT A TIVE SIGNATURE: DATE: - __..__.n.___.____.."._.__ -"._-,-_._------ WORK ORDER 17979 PHONE DA?r/?,RD;~,. . ~ - ".1 , /. .' 2131 Industrial Drive ORDER TAKEN BY CUSTOMER'S ORDER NUMBER BOZEMAN, MONT ANA 59715 DT&M OCTM o CTK ~ CTK EXTRA o WHY (406) 587~O969 L/1 I I /::;; JOB SITE IF DIFFERENT FROM BILL TO: &,~ ! OCCUPANT NAME BILL TO: - I.' '/ 1_\' i I~,_ ("" ,,"""'-" J ,I' ," ( JOB SITE ADDRESS STARTING DATE . . . MATERIAL . . . DESCRIPTION OF PROBLEM (' / i I I ,./,,(, ../ _,', ", i ~t 1[, ,..'/ <' r . t..~' ~ i f,t'! J ~.~, (, (. i I' ,t ,,' i I I , / ,,;,.r(..J ' ,"",i , "i(; / I ' J k-[\" (. ,/ (".., ;/....,;... (,'( I' r'!c,. //, .... ( " ~~. ,t( r I ~/ .(il'" <~ , ,'," ,'/,,' , ,II ,I", I / , I j DESCRIPTION OF WORK DONE , ' .-' ,'--[, .... t' (' c' 1.."7:.,, I......i"f' (, / nf" . 't, C " J ; '. f/,." .~:' "t"'~/ CODE aTY OTHER CHARGES AMOUNT ::- ... "':'; < / , ! (. 1\ r:" 'f .J NAME/LApOR DATE ~ . . . . ./' . !.-/ ,.' t..! ': I..,. i,' , I, (0 .. ,c ' , .'Ii f/ (/ ,~-) .- /I!/~/ I }"~, :.,...., Z TOTAL LABOR TOTAL MATERIALS DATE COMPLETED TOTAL MATERIALS TOTAL OTHER Work Ordered by '%anf(~ou TAX Signature TOTAL TERMS - NET 10TH OF MONTH. A FINANCE CHARGE OF 1 %% PER MONTH WILL BE ADDED TO PAST DUE AMOUNTS. THIS IS AN ANNUAL RATE OF 15%. . '-, '. '. '. .-- .. . e J \ V Business 406~586-5087 Fax 406~586.60l5 ( j:\ .j I 5851 E. Baxter Lane. Bozeman, MT 59715 \!; '? -( is l'cJ"e '[: \\~N 1 7 1997 ....-1/ ( Iv', ; (,'fll'V\~ 'rhU~~/J~ B I ..... ^. __.,.,,'.r ,....___. _., .'",'" __...._ ,.,.~ ,--_._-_.~" ",- _~w.......--~.'-~,~-.--'~....~-."-- ^"'~-----'-'~'--~ ----,--.',..-~~ i L L T -.--...,. -....-... ._ _____ ._.~," ._.__.._ .".,._....._...._., ". .. _-"""'_ .".,__.._~,~~____..~,,,,_____~.~,~___..,~.__.,~r'_'__'_",.-.----- .~~,~---^'._....-------.... 0 -- ... ----.-..,.-.---." ~,._---,..~ -...-.---." "-~.,.,,._--'-' ...,....--- .'.'." -_.~~."'--~,~,-~- .-.,-.; ---, ..... ......-....... __..... ".____.,_.~,., __~_.,',...,_ ,_._~. ..._ on _._,~._,_,,' _._.. _ ---." -_.,'-~,-------------------~.~ j , I I ,. /1' / . .. -. ~ / c u v' <2.....:t-S . ...___.._ _ .~. .._...._. ..._ _..__.._...... ~__.,_I.____._____..____.._,___.___H ..,--. -.__.---~. .-, . ,_'''-:' _ ~ iT'~ j , f) U~ V ;~~_J - /;~. . I "', ~ ,- .. _~?~...~~..-~-!ij~; ~7ji~~~~~~;~i.~::---- --j:~~~~~ ~-.?!irl-52 I ....,,~. N. ,..-,. I/~ ....... < 1 'r~<' ~4~~,~:?-(~)};~~~;.~~:~~ ,,:='.:,~-;,< ~,~~H'_____ .'.-:.i~~ ~...,... ----~~;~O-.- ~...- ". ;---, - ~ -." .'''i-' -.. ,...,.- ,.... ._.__.~~"._-_._.,."-_._.,- 1"~"---'" ,",n_.. .-...&-..-.--- -_...,.~,--~.~~~ .. .....~.'... , , 1_.-.:.....1"'-0 . u_ ...._..._.r~_'..' _~^....~___~''''___ ..~"., _..". .....--. ..'n__ __..,_ -- -.-..- ,._._n_."...,'"_'_'_."_ :~~_:ff:<:c~-"~~~u~=~ _. , : I ..__u. r :j . /_ n nT n~_nnn_- I I ~ .. ------ ..--_.- ---------- %/ ! i "Cnn' nn.,_n~ - - y n'_'__ i .____ _'.~.-----~ _~=~~ _-~,-_-: _ -~--l-- d'_ -- -- i I I _ . .---.- -----CJP' TOTAL ! i MATERIALS , TOTAL j .~-- MILEAGE I hereby acknowledge receipt of the above described service/materials. j X/I -- ...........--......,.- TOTAL ,; . -, i . - - -..".".-.... ----.---.... ------.--...---- MAY-04-1998 18:57 FROM TO 5871175 P.03 . ! ~ : , ! , ~_ f , . i f I I: " , j ". ~ . I . H:\WINOQWS\EXCEl5\1996\ML.1928.xL$ . ,!: .' ','BcizEM~N:SLUDGE LAGOON \ REQUEST!fOR P~OPO~A~;' : : ' ;' #~, ':';: ' ,; : . ,JOB LOCATION:. BOZEMAN. Montana' : ' " ~ j . : ' , " ~ ~: '. 1 C;o,NTRA;CTOR: WJLLlA~$ PLUMBING &.HEATlNG, INC. : Ehgine~ft: Morris'M & Maierl~ . ; A~DRES~: 21~11NDUSTRIA1:- DRIVE :: ' : i: ;"',: I , 'BPZE~N. MT 59115 ,,', ':, " i . . ~ I' . j . I .' ~ t ' PHONE:: (406) 5~7~69 m~in office : ":: : I . . ;i . \ '1 DATE: 4.Mav DAY MONDAY WORK REQUESTED BY: CITY Of, BOZE~AN E,xrRA: ; !, ' :',..::; " i"!, DcSCHJPTION OF WORK DONE :: 11, .. !; , ~FILl \N AREA.BElWEEN TH~ ~EW DIKE & I. P. BED No 18 .:': . : i; ; 'i'" J I '. . . 1 I, I, I 'I" (i.' : _, ! . . :: . \ '. ;, . . ',::'.: '.~ ; t: '1 I, " .' , ,,' ' "" . .~. . I, ':.' ,.... . , ,I ...:;,,- ,......""""'="T.--="L"'.'~-_."'";_..-,;,~-';~. -'--;;C;;,";;:=- ,'.:,;;;0,:-_".,;,,"" ..---- ."'':::~''!'-''=::~"';''F'=~--,..;:,,'' . A ~,~:"-:+--.---- , :' MA ERIA. ,. . . . ,Qlf.: ,EP,....H'; !'1i("'J,,jl~ " DIRT FROM TEMP DIKE REMOVAL : EST400 CY '!: N/C ,,: ' ; " , 0:00 . ; , . ,: '; !: : Q:OO TOTAL MA:rERIAL;;. ":"'.., ; : i, 0:00 I f.MPLOYEENAMg ~ I : LODGING REG HOURS REG RA. TE, OT HOiJRS .;! OT, RATE i; AMOUNT r , Larry PowcrS 'spr' 0.00 2.00 $ 28,66:' !! S : . " '41.45, '. : . : 57:32 Clyde,D~vls apr : ,0.00 8.00 5 27.36:.. . i; $ , . ~8.21: , 2.18T88 Mike Willson ~pr 0.00 4.00 $ 27,36 ': $ " :38~~1 . . :. 109'.44 I $ TOTAli LABOR:.. ,.~! ; ! 385,64 I EQUIPMENT I REG HOURS HOUR':: HOU~S : RATE :AMOUNT! EOS05 , Tractor CAT Loader 950r 8.00 $ 66.57: ,. $ ,,53.26 " 532.56; E0961 CATD5C Dozer 6~wav 4.00 $ 52.00 $ '4,1.6Q 202.00, VEHICLE @ $0.35 PER MILE S 0.35, , " ' ,,' '. -c- I . 0,00, TOTAL,EaUIPMENT::: :. $.; , ,740.56 f ,!! :.; I,;; "" : SUB ToTAL i1.125;20 I " ~, . I ;. , ' . I Note:' ~obi!ization costs as incurred. Note: 15% to be applied to work orde<.3 for ove~~ad and profit. ' , I I 168:93 I '. : IGRANO TOTAt..: " ' ' . ! 1.295113 . ; ~ ; . . -. . I ~ . WIlL1AMSPLUMBING & HsATiNG SIGNATURE: ____1: . ; :' DATE: i. i . i . .: . . ii ' " ( " . . I City ofi3ozeman . ' ' : i . :', : : I .!. . . .. REPRE~Em ATIVE SIGNA TU~: . i: " !: DATE.: ".;' , ! :' :: .' ;' !' , : ' . ,,'; ~ : : : , , ~ , I !! i, j . . ~ 1 ; : . .. ,'I , '!: ,', : \i :; !; . , ~ i I :! t , " i, I ! I I ' : - __.______.___ i . MAY-04-1998 18:56 FROM -, Iv 5871176 P.82 , i I i', ,-. ", i , I I ; ,I I Ii' . ',' . . !' i " H;\WIND~WS\EXCE~5\19$6\ML 1028.xLS i Ii, ' BOZEMiAN,SLUDGE LAG06N REQUEST1~ORPROPO$AL. '! '. 'i; #4: :. i:. .' , ; , JOB LqCA TICN: eOZE:M~, M~nta.r.:a : ::: !' , ,': !:' : ': CONtRACTOR: WILLIAMS PLUMBING &. HEATING, INC. EngineM: Morrison & M~\enl~, " . . . " I . . " . I . ADDRESS: . 2131 INDUSTRI.A:L DRIVE . i : i ' eqzEMA,N, MT 59715 !: i ' , i PHO~E:: . (406) 587..0969 rriain office ; ~ : , . i , : .1' " . ,. Ii ' . '. . . DATE: i 4-May, ,DAY MONDAY WORK REQUSSTED BY: CITY 9~ BOZEf1^AN EXTRA ! 1 ~: ' . .' : . iDE$CR'PjIONOF WO~KDONE . . - Ii , !, .'. .: i, JINST All CONCREre STEP$ BACK ON SLOPE ' 1 ii, '. ,', '. ',' . ' ;' . . . I . . :. 1 8' 101de-L>P -tk. '3: I s2",?c . ji:, ,. ..' ... - _ . .---- -' o----'-'~-._,..;=->,..:""""........=.--="'.".....,.. --......;=--=".,-,.,,"~-''''''-:',..:}- .,,,-,.,; ;;: '. ,-,.!,,:...~- , MATERIAL ." , .. an;: . : EACr+ i AMDu:rr, '. CONCRETE MATERIAL 36X3X10" -l?1.? i: 3.6 65 :. 234.00 FORMING f\;1AJERLALS ' 1-"5 !! 1.. i 1:Sp . .' 1Sq.OO , 'rOT AL r.1ATERIAL 364.00 EMPLOYEE NAME'I LODGING REG HOURS R~G RATE,OT H\?URS ,OT RATE; ;: . AMOUNr larrypowers MAY 0.00 2.00$ 28.66 .' $: ,'.41.415 '. " 57.32: Clyde Davis MAY 0,00 4,00 $ 27.36. . i, $1'. : 38.2,1 ..' . I 109.441 E~!.!:L'?y . . MAY 0.00 8.00 $ 24:56:. :: ~;'" 34.$$ ;.. : , i:' 196.4&. Dave Hpy . MAY 0.00 8.00 $ 24.56 I! S ',34.39 ; 19~L48 i $ . . TOTAL: LABOR ;$ $ ArVC--;'-- i EOU"iPMENT I REG HOURS HOUR HOl,JRS.: RATE ;.' / j AMOUNT E1013: $amsung 130 wlbuc1<:et . 4.00 S 62.00 !. S . 50.00 . ;. 243:00 VEHICLE @ 50.35PER Mll~ S 0.35 !i : ; :. ' . v 0,00 TOTAL EQUIPMENT:.-. :: .$': Me " . ,. ' .'1 I., ,.-. , " SUn tOTAL . : I'," 3&4.00 1 . . Note: ry,obilization costs as incurred- Note: 15% to be applied to work orders for ove~ead an~pr~fit:: i 57.60 Ii ., . : 'GRA~O TO~~L: ,:' : i' : 441.E30 .' . ,11 ( i WILLIAMS pLUMBING &. HEA. TlNG S!GNATU ;'.E: j i I . . DATE: ' . . : :., .!:.i . ;:~. Cityof:B~zerr)an. , : i; : ,. :;, REPR:ESE:NTATIYE,SI~NATURE:: i:: D~TE::: ~ 1 : ~ : ! I I ; . ~ j : I , I ! i " : t I. I : i i i i Ii" , t ,i ~ I ' 'i , ' !: I _' I' : I , ' ! i Ii. I I " i .. j I I I. i 1 J ( " I I. . : I ! : . I : , , i, MAY~04-1998 18:57 FROM TO 5S?11ro P.8~ i I I .' " I :' I ' I L : I . . H:\WINDOWS\EXCEL5\1998\M1l1028,XLS I,; - I, ' , ,I, , . : , BOZEMAN :SLUDGE LAGOON REQUi::ST iFOR PROPOSAL . , ' I : ' . . . i ~ : " '#5', .. '. '" ;', j . . " I . i ; , ~ i . . I l , :JOB L'f^ TION: BO~EM~~.~ohtanai: , CONTRAFTOR: :WI~UA",~ PLUMBING, & HEATING. INC. :Engineeff Morrisqn & Marerl~; ! :ADDRESj= ,~1~1IN~USTRlAtDR).ve : I: ; ,.' !,': BO?..:EMAN~ MT 59115 ;::; , . . I ' 'I I . PHONE:' ',(4()6)587-b969,m~in office : !' ' , i DATE:! 4-May. ~AY MONDAV WORK REQUESTED BV:;C;rv O~iBOZ~MAN EX~;.L ; .....;.. ; :: I! . ',:: ~:: . , - D~SCRIPTI,O~ OF woRK DONE " ' :: ,,: " :' ! ,I ", , :ADD CUEANOUTS'(2) TWO TO,THE PLANED QUANITY !: I " , " . , ; " I I,' . 'I '. I: : I I ' " I':' ;' :: :: ':',' i !.' ' :. > ' Ii, ". __ . ..,_ - ....__'"U~" ~; '" ; : : .: i ,MATERIAL , -" QTY.lT ,,' EACH'" AMOUNT ~ 8" X 4" 'lfvt(E EA II 2 : . :1$ . : l :390,00 '4"45BEND' "E:A 'I! :2', , .,6~, ;: ,; 122_00 "'T--.~t-.,.-::-;-- ." ' ',' , -,~'-- 4 Mi::,~ALUG:... EA' Ii 6 ' ,',1,6 , : ,:; ~6,OO 4"DlPIPE LF ,!:18 , 5,9,5 ", "~, 107.10 4" MJ CAP EA:: 2 ~S;~ ,. 51.00' . INSULAT.10N EA! i 2 " ':: 42 ' ::,' 84.00 ,18"RCPifOPSW/CITOP, EA i! 2,127]5 " i 255,001 , BEDDING ROCK CY : : i: 5 , ~, IQ :' 45.0\), I 10TAL M~feRIAL, ;:: , ' ' : \1150;10 I ,EMPLOYEE NAME: T L.ODGING REG HOURS REG 'RATE , OTHOORS O'TR;h.TEi: AMOUNT:;: LarryPo-,\;ers MAY 0,00 2.00 S 28.66: 'Ii S,' A"i.45: " "i 57.j32, CtydeDavis MAY 0.00 4.00 $ 27.36;, --r S ' :38,2~: ,09,;';4 ~~HoY MAY 0,00 6.00 $ 24.56: \. $ , ;34,39: ! 147.36 JIMKc::E~NER MAY 0,00 8.00$ 24.56', !: $ ,34.39: ,,;196.4B i $ lOTALiLABOR. :., $; $, ,: 510,60 ; EQUIPMENT ; I REG HOURS HOUR : : HOU~S ,:' RATE, I' " AMOUNT 51013 : Samsung 130w/bucket 4.00 $ 62,OC, I, S :50,00: . i 248:00 : vEHICLE @$O.35 PER MILE $ 035 I' , , ' ; 0;00 ; : TOTAl..; EQUlPMEN'r:, 1; $ ':, '. : ~ 248.00 ~ . j! ~ : I " : SUB TtiTAL ' .' ,': j : i [1.908.70 Note: 'M~bili~ation ~sts as jncurred. ' Note: 15% to be applied to work orderS (or:overhMad and profit. ': : \ '; 286,~1 I " .IGRANf.jTOTA'L~ ,:',,~' ~ ,;i,195,01 I ~ ',. " ' - , - ' , . , ' I: .. , W]LLlA~$ PLl:IMBIN~ &HEATI~G SIGNATURE: !' DATE:' ~, ;, J ,: I ' City of ~o:r.eman ' . ! : ; : ' : i REPRE,$ENTATIVE SiGNATURE: ;,: :' DATE: :': ;' " . !.!, .. -i, " I ,,-,' I i ' ; i. 1-' 1 ' r L ' . r i : j. . i ~ . I ' . " i I I ~ . I " I'; ; : I ' I: . I ' : ~ \: " " I' \' .' ; " \. ',f;, . . I' : - , . - .----- - - - .......,.- -.., .~ MAY-12-199S 10:55 FROM TO 5871176 P.01 I '! ,; i I I I . i : ;, ! : Ii" ': I WILLIAt;4S P~UMBI'NG ^ND~EA TI~G, INR" . . PO BOX 10 ,! ,'i ; , i 2131 !INDU$TRIAL D*_VE Iii ' : BOZEMAN,MT 597:71~OOlO Iii I I 1] 1 ! I ; I ! 'I ' ! I : . I I ',; I ,I I , , I: I : J , J ! j \ , 'I i I 1 : I ' :, . ' I I j , : i " I 'I i' :~' ;, 1:' , I I! . , ate ,~ .,~ :" ! ! r'fumber opages:i~ h~.ding: tO~~~ sheet, ' :' I I : i 1fard Copy 'to. Folio,,,'! :~) es ~. 0 :; i': ! I /\ 'I,., , f ' , I '" i , : ' i, I I! I " i -. ---L,_ ' ,I " I Pjhone:S~ 7 -07 ?---I Phone:! '(4Q6):Sg!",09~9 i '!!' , ~ ti U"2 h' , 1 :', .,': i ! I F~X Phone: I, -' .' Fax Phone:' ! (406) 587.pS~ 9 ; I : I QC: .j ~ D~~gent 0 For your review DReply tt-SAP i Ii. ! l I ! ' j I ~: "'" Jj L<x>Jc.e-d Ur ~ , d on P, J ~ ;;;Js:i Lue'1>~J -tl G (~ 4 ~ c4 e 8 ~ lP~ : if :,;> r&- f '~i , ,J; ! r;y' ~0/4Co~ . yea 1~iBLd :;~rVl1 -, I . : : ! I "i ; I: I . . : I ' . ii" I ' ~: t~c~~~.J~ 5+olJ'~c. G;jJJ'n~! ic;t- ~IAJ"1i , , ' / I)', i): ~~~ -? i :! /) J) . ' . /; : " I 1-' , - ~ Ore.. -r~ R>?s,~ ~ : NbcJ 1 , I. 'I : G~. I 1 I j I : I i I , ' Y1 vv..,~ ;; ; j ! , I ,} ; , ! : i Ii :1' : i \ , " , i :' " , ,!'. , , " .... Ii. " I, 1 , i ~-r: . '. . I ,I, 'i DoC#G;\WINrio\1fS~WPWI~OCUM~ikrit~'X~,~Pd:') i ::::r : ! .., if ' , i. I.' : J . , - . I : \ . t . ..,........__1 ..... oF-i..