GENERAL ELECTRICAL NOTES
A. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE
WITH EACH OTHER AND VERIFY THAT THERE ARE NO CONFLICTS IN
LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND OTHER ITEMS
THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.
B. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF FLOORS,
WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED WORK
DEPICTED IN THESE DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR
ALL PATCHING OF HOLES TO THE SATISFACTION OF THE
ARCHITECT/ENGINEER.
NEW MAIN DISCONNECT EXISTING OVERHEAD POWER POLE &
NEW POLE-MOUNT TRANSFORMER
NEW UNDERGROUND ELECTRICAL
NEW
BUILDING
1
1
1 3
2
REV. DESCRIPTION DATE
REVIEWED BY:
DRAWN BY:
SHEET
DATE
SHEET TITLEMONTANASTATE UNIVERSITYMSU-CPDC
MONTANA STATE UNIVERSITY
BOZEMAN, MONTANA
PHONE: 406.994.5413
FAX: 406.994.5665
MMI#0747.075AES BART FARMCITY WATER SERVICE95% CONSTRUCTION DOCUMENTSRPM
MJS
ELECTRICAL SITE
PLAN
E1.0
11-11-2021
PPA#20-0116
KEY NOTES:#
1" = 1'-0"1 ELECTRICAL SITE PLAN
N
1. SEE ONE-LINE ON SHEET E0.2 FOR FURTHER INFORMATION.
2. SEE SHEET E2.0 FOR ENLARGED ELECTRICAL PLAN FOR NEW BUILDING.
3. EXISTING OVERHEAD POWER POLE TO REMAIN. REMOVE EXISTING
TRANSFORMER AND REPLACE WITH NEW TRANSFORMER. RECONNECT
EXISTING SECONDARY WIRE TO NEW TRANSFORMER AS REQUIRED. SEE
DETAILS ON SHEET E0.2.
1" = 10'-0"
02/01/22
21450 MSU AES
Bart Farm Water
Service Bldg.
MOD