Loading...
HomeMy WebLinkAbout009 Electrical DetailsTTT GENERAL ELECTRICAL NOTES A. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE WITH EACH OTHER AND VERIFY THAT THERE ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT OF MATERIALS. B. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF FLOORS, WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED WORK DEPICTED IN THESE DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR ALL PATCHING OF HOLES TO THE SATISFACTION OF THE ARCHITECT/ENGINEER. NEW MAIN DISCONNECT EXISTING OVERHEAD POWER POLE & NEW POLE-MOUNT TRANSFORMER NEW UNDERGROUND ELECTRICAL NEW BUILDING 1 1 1 3 2 REV. DESCRIPTION DATE REVIEWED BY: DRAWN BY: SHEET DATE SHEET TITLEMONTANASTATE UNIVERSITYMSU-CPDC MONTANA STATE UNIVERSITY BOZEMAN, MONTANA PHONE: 406.994.5413 FAX: 406.994.5665 MMI#0747.075AES BART FARMCITY WATER SERVICE95% CONSTRUCTION DOCUMENTSRPM MJS ELECTRICAL SITE PLAN E1.0 11-11-2021 PPA#20-0116 KEY NOTES:# 1" = 1'-0"1 ELECTRICAL SITE PLAN N 1. SEE ONE-LINE ON SHEET E0.2 FOR FURTHER INFORMATION. 2. SEE SHEET E2.0 FOR ENLARGED ELECTRICAL PLAN FOR NEW BUILDING. 3. EXISTING OVERHEAD POWER POLE TO REMAIN. REMOVE EXISTING TRANSFORMER AND REPLACE WITH NEW TRANSFORMER. RECONNECT EXISTING SECONDARY WIRE TO NEW TRANSFORMER AS REQUIRED. SEE DETAILS ON SHEET E0.2. 1" = 10'-0" 02/01/22 21450 MSU AES Bart Farm Water Service Bldg. MOD