COMMISSION RESOLUTION NO. 3254
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN,
MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT
WITH JTL GROUP, INC.
WHEREAS, the City Commission did, on the 23rd day of June 1997, authorize
award of the bid for Schedule I of the improvements to South Third Avenue between Kagy
Boulevard and Goldenstein Lane to JTL Group, Inc.; and
WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such
alterations or modifications of the specifications and/or plans of the contract be made by
resolution; and
WHEREAS, it has become necessary in the prosecution of the work to make
alterations or modifications to the specifications and/or plans of the contract.
NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of
Bozeman, Montana, that the proposed modifications and/or alterations to the contract
between the City of Bozeman, a municipal corporation, and JTL Group, Inc., as contained
in Change Order Nos. 1 and 2, attached hereto, be and the same are hereby approved; and
the City Manager is hereby authorized and directed to execute the contract change orders
for and on behalf of the City; and the Clerk of the Commission is authorized and directed to
attest such signature.
PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana,
at a regular session thereof held on the 17th day of August 1998.
/L/~~
ATTEST: ~D M. STIFF, Mayor
(2ut :J ~
ROBIN L. SULLIVAN
Clerk of the Commission
APPROVED AS TO FORM:
'l
/1
~ , I i;Z
/6uc. ./ l; -Wd/J
P UL J. LiJ~ v .
City Attorrt y
~._-- ___.______.....n...._
___nu _....__.. ----...
"
CONTRACT CHANGE OR ORDER FOR EXTRA WORK CITY OF BOZEMAN
OFFICE OF THE CITY ENGINEER
BOZEMAN, MONTANA
.
TO: JTL Group, Inc.
DATE: 1/5/98
P.O. Box 9
ORDER NO: 1
Belgrade, MT 59714
PROJECT NO: STPE 1209(1)
It has been determine~ necessary and in the best interests of the Owner
to modify certain portions of the Project above and the Contract.
and in accordance with Section nine of the General Conditions,
The following changes are hereby agreed to as follows:
SOUTH 3RD AVENUE AND PATH IMPROVEMENTS (STPE 1209(1))
SCHEDULE I - STREET AND INTERSECTION IMPROVEMENTS
ITEM
UNIT QUANTITY DOLLAR
NO. DESCRIPTION UNIT PRICE
INCREASE DECREASE INCREASE DECREASE
110 Use cast in place pin down median curb LF ($2.00)
1800 ($3,600.00)
110 Additional median curb installed LF
$6.00 56 $336.00
194 Use 3" concrete instead of 4" for medians SF ($0.15)
2262.5 ($339.38)
194 Additional concrete sidewalk median installed SF $1.95
2472.5 $4,821.38
Subtotals: $5,157.38 ($3,939.38)
Net Change: $1,218.00
Net Change in Contract Time'" +0 Days Total Net Chanae in Contract Amount:
$1 ,218.00
REASON FOR CHANGE: Changes relative to the above items are mostly due to normal variations in quantity estimates and actual construction
requirements.
The Change(s) above listed is/are hereby accepted:
Contractor:
E'9i'''~"9' ""NO""' ~
~ M#/h1&L
By: By: . '. vr~~-\- J~c-{
TITLE
NAME ITLE
APPROVED: CITY OF BOZEMAN
By: ~-~ OWNER
~ City Manaqer
NAME TITLE
.---
CONTRACT CHANGE OR ORDER FOR EXTRA WORK CITY OF BOZEMAN
OFFICE OF THE CITY ENGINEER
BOZEMAN, MONTANA
TO: JTL Group, Inc.
DATE: 1/5/98
P.O. Box 9
ORDER NO: ~
Belgrade, MT 59714
PROJECT NO: STPE 1209(1)
It has been determined necessary and in the best interests of the Owner
to modify certain portions of the Project above and the Contract,
and in accordance with Section nine of the General Conditions,
The following changes are hereby agreed to as follows:
SOUTH 3RD AVENUE AND PATH IMPROVEMENTS (STPE 1209(1)}
SCHEDULE I - STREET AND INTERSECTION IMPROVEMENTS
ITEM
UNIT QUANTITY DOLLAR
NO. DESCRIPTION UNIT
PRICE INCREASE DECREASE INCREASE
DECREASE
113 Change from 36" Inlet to 48" MH/lnlet EA $1400.00
0 $317.69
114 Require 2 New 4' x 48" MH Extensions EA $700.00
0 $506.00
122 Require 1 - 36" Barrel End 3 -12" Barrels EA $350.00
0 $280.60
123 Install 10" Tapping Tee instead of 6" EA $1400.00
0 $524.10
136 Use Pressure Pipe to Allow Less than 18" Separation LF $45.00
0 $270.86
190 Install New Fence LF
$1.25 578 $722.50
Install Retaining Wall at Graf & S. 3'" LS $1673.48
$1673.88
Replace City Supplied Valve on Hydrant LS $600.00
$600.00
Apply Tack Coat 2nd & 3rd Lifts on Kagy
$3375.00
and 2nd Lift on 3'"
GAL $1.25 2700
Install Valve Stem Extensions at City's Request EA $100.00
4 $400.00
129 Additional Traffic Control at City's Request LS $4764.73
$4764.73
Additional Permanent Traffic Control Signs LS $2744.50
$2744.50
Remove Old Ditch near Arnold at City's Request LS $1076.25
$1076.25
Subtotals: $17,256.11
($0.00)
Net Change: $17 ,256.11
Net Change in Contract Time'" +0 Davs Total Net ChanQe in Contract Amount:
$17,256.11
REASON FOR CHANGE: Changes relative to the above items are mostly due to normal variations in quantity estimates and actual construction
requirements.
The Change(s) above listed is/are hereby accepted:
COOIffi"~ JTL ~ro~.d E"',eer. r.:""tnn I=nginpprino /{ !,:, In/Pj/iniJ
{'=~ NAME \1-~cvt-E;1 '
By: ~~ J:t!J7t!2..T /ftf44~t/lL. By: iNA~~-- i - --~
N E ,TITLE
LE
.
APPROVED: CITY OF BOZEMAN
-=-4~ OWNER
- . Ci ty Manaqer
By: - ---
NAME' TITLE