HomeMy WebLinkAbout21- Amendment 1 to PSA - Sanderson Stewart - Fowler Avenue Connection - Huffine Lane to Oak Street Project First Amendment to Professional Services Agreement for the Fowler Ave Connection Project Page 1 of 2 FIRST AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT THIS FIRST AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT FOR THE Fowler Avenue Connection – Huffine Lane to Oak Street Project dated August 17, 2021 (the “Agreement”) is made and entered into this 7th day of December, 2021, by and between the CITY OF BOZEMAN, MONTANA, a self-governing municipal corporation organized and existing under its Charter and the laws of the State of Montana, 121 North Rouse Street, Bozeman, Montana, with a mailing address of PO Box 1230, Bozeman, MT 59771, hereinafter referred to as “City,” Sanderson Stewart, hereinafter referred to as “Contractor.” In consideration of the mutual covenants and agreements herein contained, the receipt and sufficiency whereof being hereby acknowledged, the parties hereto agree to amend the Agreement as follows: 1. Scope of services, rate schedules, and budget for design services are outlined in Attachment “Exhibit A - Scope of Work.” 2. Agreement still valid. All remaining terms and provisions of the Agreement remain valid. **** END OF AGREEMENT EXCEPT FOR SIGNATURES **** DocuSign Envelope ID: 19A057C4-3895-4E0F-B042-B4C2339FD6FD First Amendment to Professional Services Agreement for the Fowler Ave Connection Project Page 2 of 2 IN WITNESS WHEREOF, the parties hereto have executed this instrument the day and year first above written. CITY OF BOZEMAN, MONTANA SANDERSON STEWART By________________________________ By_____________________________ Jeff Mihelich, City Manager Print Name: Danielle Scharf, P.E. Title: Principal APPROVED AS TO FORM By_______________________________ Greg Sullivan, Bozeman City Attorney DocuSign Envelope ID: 19A057C4-3895-4E0F-B042-B4C2339FD6FD Exhibit A Fowler Avenue Connection – Huffine Lane to Oak Street Amendment No. 1 Scope of Work – Widening of Fowler Avenue South of Huffine Lane 11/10/21 Sanderson Stewart is pleased to provide this Scope of Work to add the widening of Fowler Avenue, south of Huffine Lane, to the Fowler Avenue Connection project. MDT completed a Protected Left-Turn Phase Study on August 5, 2019. The findings of that study indicated there were significant queue lengths on Fowler Avenue for northbound left turns that cause lane starvation for the through movement. Therefore, the City of Bozeman Engineering Division has requested that an additional dual left turn lane on Fowler Avenue be added to the pre-design services. The original Scope of Work for this project will cover the analysis and conceptual design of the additional left-turn lane. However, an amendment is needed for the additional survey, geotechnical analysis, and wetland delineation on the south side of Huffine. Project Scope: Phase 1 – Topographic Survey This phase will include project management and a survey of the additional area from Huffine Lane to Technology Boulevard into the Fowler Avenue Connection project. Additional topographic survey, measure downs, right of way research, Lidar scanning, and data processing will be needed. Phase 2 – Geotechnical Analysis This phase will include one additional soil boring near the southwest corner of Huffine Lane and Fowler Ave. This work will include one additional 20-foot penetration test boring and laboratory tests including moisture content, classification, consolidation, and/or corrosion tests. See the attached Scope of Work from SK Geotechnical for additional information. Phase 3 – Environmental Surveys This phase will address the additional Scope of Work elements in the southwest corner of Huffine Lane and Fowler Avenue going south to Technology Boulevard. Based on preliminary research, this area contains the West Gallatin Canal and known wetlands, which increases the field and reporting effort for delineating the wetlands. This will also likely have permitting implications depending on potential impacts. See the attached Scope of Work from Weston Solutions for additional information. DocuSign Envelope ID: 19A057C4-3895-4E0F-B042-B4C2339FD6FD Fowler Avenue Connection - Pre-Design Amendment 1 11/10/2021 Labor Category Total Plan Hours Total Plan Bill Amt Phase: Topographic Survey Task: Project Management Principal 2.00 440.00$ Senior Engineer I 2.00 330.00$ Associate/Sr Principal Land Surveyor 4.00 640.00$ Task: Survey & Scanning Control Staff Surveyor II 6.00 660.00$ Associate/Sr Principal Land Surveyor 1.00 160.00$ Task: Topographic Survey, ROW & Measure Downs Staff Surveyor II 16.00 1,760.00$ Task: Lidar Scanning Staff Surveyor II 5.00 550.00$ Task: Scan Registry Staff Surveyor II 2.00 220.00$ License Fee 700.00$ Task: Data Processing Associate/Sr Designer II 12.00 1,440.00$ Task: Travel Staff Surveyor II 4.00 440.00$ Total for Topographic Survey 54.00 7,340.00$ Phase: Geotechnical Analysis SK Goetechnical 2,500.00$ Total for Geotechnical Analysis 2,500.00$ Phase: Environmental Surveys Weston Solutions 4,180.79$ Total for Environmental Surveys 4,180.79$ Total for Fowler Avenue Amendment 1 14,020.79$ Page 1 of 1 DocuSign Envelope ID: 19A057C4-3895-4E0F-B042-B4C2339FD6FD October 19, 2021 Proposal P-20111-S1 Ms. Danielle Scharf, PE Sanderson Stewart Via Email: dscharf@sandersonstewart.com Dear Danielle: Re: Supplemental Request No. 1, Additional Boring near SW Corner of Huffine Lane and Fowler Avenue, Proposed Fowler Avenue Connection, Main Street to Oak Street, Bozeman, Montana As you requested, we are providing this supplemental request to complete an additional soil boring near the southwest corner of Huffine Lane and Fowler Avenue where widening of the south leg of the intersection is planned to provide a center turn lane. This will be completed in accordance with this letter and our agreement with you dated August 31, 2021. Scope of Additional Services As requested, we will complete one additional soil boring near the southwest corner of Huffine Lane and Fowler Avenue. Prior to mobilizing, our field engineer will stake the planned boring location and call for utility locates. During our same mobilization for the original borings, we propose to complete one 20- foot penetration test boring. The boring will be extended to the proposed depth, or auger refusal, whichever is encountered first. The depth to groundwater will also be recorded. The samples will be returned to our laboratory for additional laboratory testing. Potential laboratory tests may consist of moisture content, classification, consolidation and/or corrosion. The results of the additional boring and laboratory tests will be incorporated into our geotechnical report. Cost of Services We will furnish the additional services for a lump sum of $2,500. This will raise our contract amount from $29,750 to $32,250. If this is acceptable, please provide a supplement to our existing agreement. General We appreciate the opportunity to provide these services. If you have any questions, please contact us at your convenience. Sincerely, Cory G. Rice, PE Senior Engineer 2511 Holman Avenue P. O. Box 80190 Billings, Montana 59108-0190 p: 406.652.3930; f: 406.652.3944 www.skgeotechnical.com DocuSign Envelope ID: 19A057C4-3895-4E0F-B042-B4C2339FD6FD Weston Solutions, Inc. 805 N. Last Chance Gulch Helena, MT 59601 406-646-2401 www.westonsolutions.com October 25, 2021 Danielle Scharf, P.E. Sanderson Stewart 106 E. Babcock Bozeman, MT 59715 Project No.: 15572.012.001 Re: City of Bozeman Fowler Avenue Connection from Main Street to Oak Street Resource Review, Wetland Delineation and Mitigation Alternatives Contract Modification Request – MOD01 Dear Danielle: Weston Solutions, Inc. (WESTON) is providing this contract modification request to address additional scope work elements that have been requested by city of Bozeman for the Fowler Avenue Connection from Main Street to Oak Street project in Bozeman, Montana. This scope of services covers additional analyses and effort required to complete the Baseline Environmental Surveys and Final Environmental Permits. Field work is anticipated for this additional effort. The proposed modifications are as follows: Baseline Environmental Reviews and Final Environmental Permits WESTON’s original assumption was to perform the baseline environmental reviews and final environmental permits for Fowler Avenue, from north of the intersection of Main Street through Oak Street. The city of Bozeman requested an additional parcel of property located at the southwest quadrant of Huffine Lane and Fowler Avenue intersection, to extend to the Intersection of Fowler Avenue and Technology Way. Based on preliminary research of information sources (e.g., historical irrigation survey maps, city of Bozeman’s GIS portal, and Montana State Library’s Digital Atlas), this additional area contains the West Gallatin Canal and known wetlands, which increases the field and reporting effort for delineating the wetlands. This will also likely have permitting implications depending on potential impacts. Rights-of-entry were unable to be obtained for all private identified properties for the first mobilization of the wetland survey. WESTON is proposing to add an additional field mobilization to complete the wetland survey for the additional project area and to capture those properties that are awaiting approved rights-of-entry. Additional budget is requested to account for the additional field mobilization. WESTON assumes the following to complete these assessments: • Upon authorization, Sanderson Stewart will provide WESTON survey area boundaries that accurately depict the survey area including project area access. Sanderson Stewart will provide written rights-of-entry for identified properties. • WESTON will have safe and timely access to the survey property. WESTON will only survey areas with explicit permission for WESTON access. As detailed in the attached cost estimate, the total cost for this proposed MOD01 effort is $4,180.79. Please don’t hesitate to contact me if you have any questions or would like to discuss this scope of services in detail. We look forward to continuing our work with you on this project. DocuSign Envelope ID: 19A057C4-3895-4E0F-B042-B4C2339FD6FD 2 Very truly yours, Weston Solutions, Inc. Mindy McCarthy Project Manager Enclosure cc: Mark Bell, P.G. Katie Mittmann DocuSign Envelope ID: 19A057C4-3895-4E0F-B042-B4C2339FD6FD Hours % of total Rate Extension 2 7%38.08 76.16 GIS Analyst-Beckley 2 7%30.17 60.34 Wetland Specialist - Mittmann 23 79%39.00 897.00 2 7%37.51 75.02 0 0%23.32 0.00 0 0%48.05 0.00 29 LABOR SUBTOTAL $1,108.52 1.537 OVERHEAD SUBTOTAL $1,703.80 $2,812.32 Lump Sum 0.00 Hours 0 Per Hour 0.00 Title commitments Parcels 0 Per Parcel 0.00 Vehicle Rental Days 1 Per Day $60 60.00 Miles 0 Per Mile $0.575 0.00 Gasoline 1 Per Trip $60 60.00 Days 1 Per Day $225 225.00 Days 1 Per Day $61 61.00 Days (First/Last Travel Day)Per Day $46 0.00 Per Trip $150 0.00 1 Per Day $105 105.00 Roundtrip 1 Per Trip $500 500.00 Days 1 Per Day $20 20 $1,031.00 R/W Appraisals, Negotiation & Acquisition Soils/Geotechnical Survey/Report/Testing Cultural Resource Studies/Report Noise Study Traffic Study/Report Biological Resources Studies/Report Surveys Subsurface Utility Engineering (Phase lI) Hazardous Materials (Initial Site Assessment) Landscaping PlansElectrical/Lighting Signalization etcAerial Photography/MappingOtherDrilling Contractor $0.00 Total Labor/ Overhead 2,812.32Total Direct NonLabor 1,031.00Total Outside Services & Subcontracts 0.00Profit (12% of Total Labor Costs)337.48 $4,180.79 TOTAL DIRECT NONLABOR TOTAL OUTSIDE SERVICES AND SUBCONTRACTS TOTAL ESTIMATED COST PROJECT: Fowler Avenue Connection from Main Street to Oak Street - MOD01 Estimate Prepared By: Weston Solutions, Inc. 10/21/2021 OUTSIDE SERVICES AND SUBCONTRACTS COST SUMMARY Field Supplies ( flags, etc.) GPS Unit GENERAL OVERHEAD @ Computer Mileage Lodging Meals DIRECT NONLABOR Miscellaneous (Blueline prints, Meals RECAPITULATION TOTAL HOURS Project Manager - McCarthy Financial Analyst - Lewis Project Scientist - Towarnicki QA/QC Review - Thunstrom Airport Parking Airfare TOTAL LABOR/OVERHEAD DocuSign Envelope ID: 19A057C4-3895-4E0F-B042-B4C2339FD6FD Tasks Total Hours Project Manager GIS Analyst Wetland Specialist Project Scientist QAQC Reviewer Financial Analyst Field Review, wetland assessment 20 20 GIS Wetland Maps 2 2 Mitigation Alternative Research 1 1 Draft Report 0 Final Report 0 QA/QC of Deliverables 0 SUBTOTAL (HOURS)23 0 2 21 0 0 0 Prepare Joint Application for CWA404 2 2 QA/QC of Deliverables 0 SUBTOTAL (HOURS)2 0 0 2 0 0 0 Contract Administration Contract Execution 2 1 1 Invoicing 2 1 1 Project Management 0 0 SUBTOTAL (HOURS)4 2 0 0 0 0 2 TOTAL SURVEY PHASE HOURS 29 2 2 23 0 0 2 Final Environmental Matters and Permits Estimate Prepared By: Weston Solutions, Inc.10/21/2021PROJECT: Fowler Avenue Connection from Main Street to Oak Street - MOD01 Biological Resources and Initial Environmental Asessment Revised 10/10/14 Page 1 of 2 DocuSign Envelope ID: 19A057C4-3895-4E0F-B042-B4C2339FD6FD