Loading...
HomeMy WebLinkAboutES1.3ElevationPhotometrics_02222021LEVEL - 1 100'-0" LEVEL - 2 112'-0" PARKING GARAGE LEVEL 89'-6" LEVEL - 3 122'-6" LEVEL - 4 133'-0" T.O. PLATE 144'-6" LEVEL - 1 100'-0" LEVEL - 2 112'-0" PARKING GARAGE LEVEL 89'-6" LEVEL - 3 122'-6" LEVEL - 4 133'-0" T.O. PLATE 144'-6" LEVEL - 1 100'-0" LEVEL - 2 112'-0" PARKING GARAGE LEVEL 89'-6" LEVEL - 3 122'-6" LEVEL - 4 133'-0" T.O. PLATE 144'-6" LEVEL - 1 100'-0" LEVEL - 2 112'-0" LEVEL - 3 122'-6" LEVEL - 4 133'-0" T.O. PLATE 144'-6" BIM FILE PATH: SHEET NO.: TITLE: copyright 2018 SMA, P.C. REVISIONS: KEYMAP: HELENA 920 Front Street | Suite 101 Helena | MT | 59601 P| 406/442.4933 www.architects-sma.com ARCHITECT SEAL: PROJECT: PROJECT LOCATION: PREPARED FOR: LOGO: CONSULTANT: PROJECT NUMBER: DRA:N BY: CHECKED BY: TEAM: PHASE: DATE: PROJECT NUMBER:Plot Date:BO=EMAN 109 East Oak Street | Suite 2E Bozeman | MT | 59715 P| 406/219.2216 www.architects-sma.com NO.DATE REVISION DESCRIPTION 6,7(3LAN6U%M,77AL (6 ELEVATION PHOTOMETRICS NORTH PHOTOMETRIC ELEVATION PLAN SCALE:1" = 20'-0" SOUTH PHOTOMETRIC ELEVATION PLAN SCALE:1" = 20'-0" EAST PHOTOMETRIC ELEVATION PLAN SCALE:1" = 20'-0" WEST PHOTOMETRIC ELEVATION PLAN SCALE:1" = 20'-0"