Loading...
HomeMy WebLinkAboutCoverSheet_02222021PROPERTY OWNER: DELANEY & COMPANY, INC. 101 EAST MAIN SUITE D BOZEMAN, MONTANA 59715 406.586-3132 APPLICANT NORTHEAST BOZEMAN VENTURE, LLC 503 SOUTH WILSON AVE. BOZEMAN, MT 59715 949-842-4499 619-459-3911 ARCHITECTS: SMA ARCHITECTS P.C. 920 FRONT STREET | SUITE 101 BOZEMA, MT 59718 P: 406.442.4933 F: 406.442.4936 CHARLEY FRANKLIN, AIA, NCARB ARCHITECTS: INTRINSIK ARCHITECTURE, INC 111 NORTH TRACY AVENUE BOZEMAN MT 59715 P: 406.582.8988 RYAN KRUGER, AICP CFM ENGINEERS: CIVIL: C&H ENGINEERING 1091 STONERIDGE DR. BOZEMAN, MT 59718 P: 406.587-1115 TIM STAUB STRUCTURAL: DCI ENGINEERS 1060 FOWLER AVE. STE. 202 BOZEMAN, MT 59718 P: 406.556.8600 MATT HUBBARD MECHANICAL: CONSULTING DESIGN SOLUTIONS, INC. 7540 CHURCHILL ROAD MANHATTAN, MT 59741 P: 406.282.7082 CHRIS DOYLE, PE ELECTRICAL: CONSULTING DESIGN SOLUTIONS, INC. 7540 CHURCHILL ROAD MANHATTAN, MT 59741 P: 406.282.7082 TANNER WHITLOCK, PE PLUMBING: CONSULTING DESIGN SOLUTIONS, INC. 7540 CHURCHILL ROAD MANHATTAN, MT 59741 P: 406.282.7082 CHRIS DOYLE, PE PROJECT TEAM 1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS TAKE PRECEDENCE. 2. DRAWINGS HAVE BEEN PREPARED ON AN ORIGINAL SHEET SIZE OF 24"X36"AND IN COLOR. 3. HORIZONTAL DIMENSIONS SHOWN INDICATE FACE OF (F.O.) CONCRETE, F.O. STUD, CENTERLINE OF COLUMN GRIDLINE, OR F.O. FINISH (INTERIOR), U.N.O.; VERTICAL DIMENSIONS INDICATE TOP OF (T.O.) SLAB, T.O. SUBFLOOR, OR T.O. FRAMING, U.N.O. 4. INFORMATION REGARDING EXISTING SITE CONDITIONS USED TO PREPARE THESE DRAWINGS HAS BEEN PROVIDED BY OTHERS. CONTRACTOR TO FIELD VERIFY EXISTING SITE CONDITIONS PRIOR TO COMMENCING CONSTRUCTION. PROVIDE WRITTEN NOTIFICATION TO THE ARCHITECT OF ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE DRAWINGS. THE ARCHITECT WILL ISSUE A WRITTEN DIRECTIVE IF FURTHER CLARIFICATION IS REQUIRED. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS, DATUM, LEVELS AND CONDITIONS PERTAINING TO THE WORK PRIOR TO COMMENCING CONSTRUCTION. PROVIDE WRITTEN NOTIFICATION TO THE ARCHITECT OF ANY DISCREPANCIES WITH THE DOCUMENTS. THE ARCHITECT WILL ISSUE A WRITTEN DIRECTIVE IF FURTHER CLARIFICATION IS REQUIRED. SHEET NOTES 1. - ALTERNATES BIM FILE PATH: SHEET NO.: TITLE: COPYRIGHT 2021 SMA, P.C. REVISIONS: KEYMAP: HELENA 920 Front Street | Suite 101 Helena | MT | 59601 P| 406/442.4933 www.architects-sma.com ARCHITECT SEAL: PROJECT: PROJECT LOCATION: PREPARED FOR: LOGO: CONSULTANT: PROJECT NUMBER: DRAWN BY: CHECKED BY: TEAM: PHASE: DATE: PROJECT NUMBER:Plot Date:PROJECT ADDRESS BOZEMAN 109 East Oak Street | Suite 2E Bozeman | MT | 59715 P| 406/219.2216 www.architects-sma.com NOT FOR CONSTRUCTION C:\Users\BenK\Documents\2037-Village Lot 5_R20_benkLB8QA.rvt 2/22/2021 10:00:42 PM-COV- 2037 02.22.2021 COVER SHEET AUTHOR CHECKER PALISADE @ THE VILLAGES DOWNTOWN 2037 130 VILLAGE CROSSING WAY BOZEMAN MT, 59718 SITE PLAN MODIFICATION PALISADE @ THE VILLAGES DOWNTOWN SITE PLAN MODIFICATION | 02.22.2021 SMA #2037 130 VILLAGE CROSSING WAY BOZEMAN MT, 59718 PALISADE @ THE VILLAGES DOWNTOWN ARCHITECTURAL DRAWINGS A0.00 PROJECT MATRIX AND TRANSPARENCY CALCS A0.01 PERSPECTIVES A0.10 ARCH SITE PLAN A2.00 LEVEL 0 PARKING GARAGE A2.01 ENLARGED PLANS AND DETAILS A2.02 LEVEL 1 FLOOR PLAN A2.03 LEVEL 2 FLOOR PLAN A2.04 LEVEL 3 FLOOR PLAN A3.00 EXTERIOR ELEVATIONS A3.01 EXTERIOR ELEVATIONS A4.00 MATERIALS / PRODUCT DATA SHEET INDEX CIVIL DRAWINGS C1.0 COVER C2.0 SITE PLAN C3.0 UTILITY PLAN C4.0 SITE GRADING AND DRAINAGE PLAN C5.0 CIVIL DETAILS C5.1 CIVIL DETAILS C5.2 CIVIL DETAILS LANDSCAPE DRAWINGS L 000 SITE PLAN L 003 OVERALL LANDSCAPE PLAN L 200 NOTES AND SCHEDULES L 300 ROOF DECK HARDSCAPE PLAN L 301 LANDSCAPE PLAN ENLARGEMENT L 302 LANDSCAPE PLAN ENLARGEMENT L 500 LANDSCAPE DETAILS L 501 LANDSCAPE DETAILS L 502 IRRIGATION PLAN L 700 IRRIGATION DETAILS L 701 IRRIGATION DETAILS STRUCTURAL DRAWINGS N N VICINITY MAP SITE MAP MECHANICAL DRAWINGS ELECTRICAL DRAWINGS ES1.0 GARAGE SITE PLAN ES1.1 MAIN LEVEL SITE PLAN ES1.2 PHOTOMETRIC SITE PLAN ES1.3 ELEVATION PHOTOMETRICS ES1.4 LIGHTING CUT SHEETS ES1.5 LIGHTING CUT SHEETS PROJECT SITE EAST MAIN STREET 1-90 INTERSTATE PROJECT SITE VILLAGE CROSSING BOULEVARD VILLAGE CROSSING WAY NO. DATE REVISION DESCRIPTION