Loading...
HomeMy WebLinkAboutSD WTP Drawings for CIP W112Sample Origin Sample Destination 96-TW P-1102A 96-TW P-1102B P-7503A Filtrate Conduit Terminal Structure Cap for Future Filtrate Conduit Terminal Structure List of Samples Sample Origin Sample Destination 42-TW (in Yard) P-4030 42-TW (in Yard) Cap for Future P-1102B Laboratory Sink 42-TW (Upstream of Filtrate Box)Laboratory Sink P-1901 Laboratory Sink P-1901 Laboratory Sink 42-SW (Downstream of Strainers)Laboratory Sink Cap for Future Laboratory Sink Cap for Future Laboratory Sink Cap for Future Laboratory Sink 4-SVW (Downstream of 24-Inch Contact Pipe) AE/AIT-6201 List of Samples 1.  THE BASIS OF DESIGN FOR THIS HEAT TRACE WAS TYCO THERMAL CONTROLS.   ONLY MANUFACTURERS  LISTED IN SPECIFICATION SECTION 16125 ARE PERMITTED TO PROVIDE HEAT TRACE PRODUCTS ON THIS  PROJECT.  2. DRAWING LAYOUT IS INTENDED TO BE GENERAL AND CONTRACTOR SHALL MODIFY AS REQUIRED TO  PROVIDE A COMPLETE AND OPERATIONAL SYSTEM.  CONTRACTOR SHALL DESIGN THE HEAT TRACE  SYSTEM AND VERIFY THAT WATTAGE LOADS AND CIRCUIT BREAKERS IN MINI‐POWER CENTER ARE  APPROPRIATELY SIZED.  3. THERE ARE SIX DRYING BED HEAT TRACE CONNECTION POINTS (I.E., BEDS 1/3, 5/7, 9, 2/4, 6/8 AND 10),  AND ONE HEAT TRACE CONNECTION POINT FOR THE 12” OVERFLOW TRENCH LINE TO THE MANHOLE ON  THE NORTH SIDE OF THE DRYING BEDS.  IT IS INTENDED THAT BEDS 1/3, 5/7 AND 9 ARE FED BY ONE  CONTROLLER CIRCUIT;  BEDS 2/4, 6/8 AND 10 ARE FED BY A SECOND CONTROLLER CIRCUIT; AND THE 12”  OVERFLOW TRENCH LINE IS FED BY A THIRD CONTROLLER CIRCUIT.  A FOURTH CONTROLLER CIRCUIT  SHALL BE RESERVED FOR THE FUTURE.  1.  FURNISH AND INSTALL OUTLET BOX ON POST FACING SOUTH.  THIS IS TYPICAL FOR 7.  2. REFER TO SHEET 000E80, DETAIL 1 FOR ROUTING OF TWO HEAT TRACE CABLES OUTSIDE PIPE AS SHOWN.   CONNECT 240V POWER WITH POWER CONNECTION KIT FOR TWO CABLES.  3. PROVIDE QUALZITE HANDHOLES WITH OPEN BOTTOM WITH “ELECTRIC” COVER LOGO AND PROVISIONS FOR  CONDUIT KNOCKOUTS. SIZE HANDHOLE AT 13 X 24 X 18, MODEL NO. PG1324BA18‐CA, OR APPROVED EQUAL.  4. LOCATE HANDHOLE AS APPROPRIATE FOR FUTURE POWER FEED TO HEAT TRACE AND RECEPTACLE FOR FUTURE  DRYING BEDS.  5. PROVIDE 1‐1/2” CONDUIT WITH 2#6AWG AND 1#10G AS SOURCE POWER TO MINI‐POWER CENTER AND 4#14AWG  TO PLANT CONTROL PANEL (PCP) FOR COMMON TROUBLE ALARM (CTA) FROM HEAT TRACE CONTROLLER.  6. PROVIDE TYCO THERMAL CONTROLS TYPE 8XL2‐CT (2 CABLES EXTERNAL IN CONDUIT) FOR 6 PIPING LOCATIONS  AND TYPE GM2‐XT (ONE CABLE INTERNAL) FOR 12” DRAIN LINE, OR APPROVED EQUAL.  7. COIL AND TAPE FUTURE CABLES IN THESE TWO HANDHOLES.  8. PROVIDE 2‐1/2” CONDUIT WITH 12#8AWG, 4#14 (CTA TO PCP) AND 1#10G.  ROUTE 240V CIRCUITS VIA  CONTROLLER TO 3 HEAT TRACE CIRCUITS PLUS 1 FUTURE HEAT TRACE CIRCUIT (COIL UP AND TAPE WIRE ENDS IN  NOTED HANDHOLES FOR FUTURE HEAT TRACE), AND ROUTE  (3) 120V CIRCUITS TO GFI RECEPTACLES AS SHOWN  ON PLAN AND FUTURE GFI RECEPTACLES (COIL UP AND TAPE WIRE ENDS IN NOTED HANDHOLES FOR FUTURE  RECEPTS).  9. PROVIDE (2) 4” GALVANIZED STEEL PIPES AS A SUPPORT STRUCTURE NEAR FENCE AS COORDINATED WITH OWNER  SPACED 6’‐0” APART WITH TWO HORIZONTAL STAINLESS STEEL STRUTS BOLTED TO PIPES AND CENTERED AT  APPROXIMATELY 5’‐0” ABOVE GRADE FOR SUPPORTING A 15 KVA MINI‐POWER CENTER AND 4‐CIRCUIT TYCO  THERMAL CONTROLS HEAT TRACE CONTROLLER.  EMBED 4” PIPES IN 12” DIAMETER REINFORCED CONCRETE  FOUNDATION 36” DEEP.  10. DRYING BEDS #9 AND #10 ARE BID ITEM B2.  FOR BID ITEM B2, MOVE HANDHOLES SOUTH OF BEDS #9 AND #10  NORTH TO REPLACE NEAREST JUNCTION (J), AND PROVIDE FOR FUTURE CONNECTIONS TO BEDS #9 10, AND  ADDITIONAL FUTURE BEDS TO THE SOUTH.  BID ITEM B2 ELIMINATES TWO OF THE SIX HEAT TRACE CONNECTION  POINTS.  11. REFER TO HEAT TRACE BLOCK DIAGRAM ON SHEET 000E80.  PANELBOARD NO:Mini-Power Center (15kVA) VOLTAGE:240/120 BUS RATING (A):60 ENCLOSURE:NEMA 3R PHASE:1 MAIN OC DEVICE:60/2 MOUNTING:SURFACE WIRE:3+GND INTERRUPTING RATING (KA):10 LOCATION:LAGOON LIFT STATION 200% NEUTRAL:NO SERVICE ENTRANCE LABEL:NO CKT CKT NO. DESCRIPTION LTS REC MECH MISC AMPS P AMPS P LTS REC MECH MISC DESCRIPTION NO. 1 600 20 2 A 20 2 600 20 2 3 600 B 600 4 5 GFI Receptacles 720 20 1 A 20 2 75 20 6 7 GFI Receptacles 540 20 1 B 75 8 9 GFI Receptacles (future) 360 20 1 A 20 2 600 10 11 Spare 20 1 B 600 12 13 Space A Space 14 15 Space B Space 16 17 Space A Space 18 19 Space B Space 20 LTS REC MECH MISC CONNECTED LOAD (KVA) 0.0 1.6 3.8 0.0 240 LINE-TO-LINE VOLTS PHASE A (KVA) 3 DEMAND FACTOR 1.25 NEC 1.00 1.00 23 CONNECTED AMPS PHASE B (KVA) 2 DESIGN LOAD (KVA) 0.0 1.6 3.8 0.0 27 DESIGN AMPS --- SPARE 20% 1.1 5.4 --- 6.5 TOTAL Future Beds PHASE BALANCE LOAD SUMMARY CONNECTED LOAD (VA) OCP OCP CONNECTED LOAD (VA) Trace Beds 1/3, 5/7, 9 Trace Beds 2/4, 6/8, 10 Overflow Trench Trace DESCRIPTION (LEGEND) 1NAMEPLATE (POLYALUMINUM CHLORIDE / FILL STATION) 2NAMEPLATE (BULK STORAGE TANK / T‐7401A) 3CIRCULAR BARGRAPH TANK VOLUME DISPLAY (0 ‐ 6,500 GALLONS) 4NAMEPLATE (BULK STORAGE TANK / T‐7401B) 5CIRCULAR BARGRAPH TANK VOLUME DISPLAY (0 ‐ 6,500 GALLONS) 6AMBER PILOT LIGHT (TANK LEVEL / LOW ALARM) 7AMBER PILOT LIGHT (TANK LEVEL / HIGH ALARM) 8NAMEPLATE (TANK / CONTAINMENT) 9AMBER PILOT LIGHT (SUMP LEVEL / HIGH ALARM) 10 NOT USED 11 NOT USED 12 NOT USED 1NAMEPLATE (FLUORIDE / LOADOUT AND FILL STATION) 2NAMEPLATE (BULK STORAGE TANK / T‐7201) 3CIRCULAR BARGRAPH TANK VOLUME DISPLAY (0 ‐ 6,500 GALLONS) 4NAMEPLATE (DAY TANK / T‐7503) 5CIRCULAR BARGRAPH TANK VOLUME DISPLAY (0 ‐ 900 GALLONS) 6AMBER PILOT LIGHT (TANK LEVEL / LOW ALARM) 7AMBER PILOT LIGHT (TANK LEVEL / HIGH ALARM) 8NAMEPLATE (TANK / CONTAINMENT) 9AMBER PILOT LIGHT (SUMP LEVEL / HIGH ALARM) 10 NOT USED 11 NOT USED 12 NOT USED 1NAMEPLATE (FLUORIDE / TRANSFER PUMP STATION) 2NAMEPLATE (BULK STORAGE TANK / T‐7201) 3CIRCULAR BARGRAPH TANK VOLUME DISPLAY (0 ‐ 6,500 GALLONS) 4NAMEPLATE (DAY TANK / T‐7503) 5CIRCULAR BARGRAPH TANK VOLUME DISPLAY (0 ‐ 900 GALLONS) 6AMBER PILOT LIGHT (TANK LEVEL / LOW ALARM) 7AMBER PILOT LIGHT (TANK LEVEL / HIGH ALARM) 8NAMEPLATE (TANK / CONTAINMENT) 9AMBER PILOT LIGHT (SUMP LEVEL / HIGH ALARM) 10 NAMEPLATE (PUMP / CONTAINMENT) 11 NOT USED 12 NOT USED 1 NAMEPLATE (NEUTRALIZATION TANK AND CHEMICAL SPILL TANK /  LOADOUT STATION) 2NAMEPLATE (NEUTRALIZATION TANK / T‐5601) 3CIRCULAR BARGRAPH TANK VOLUME DISPLAY (0 ‐ 11,500 GALLONS) 4NAMEPLATE (CHEMICAL SPILL TANK / T‐5660) 5CIRCULAR BARGRAPH TANK VOLUME DISPLAY (0 ‐ 7,300 GALLONS) 6AMBER PILOT LIGHT (TANK LEVEL / LOW ALARM) 7AMBER PILOT LIGHT (TANK LEVEL / HIGH ALARM) 8NOT USED 9NOT USED 10 NOT USED 11 NOT USED 12 NOT USEDLCP‐7201BITEM LCP‐7401ALCP‐7201ALCP‐5601