HomeMy WebLinkAbout21029 Staff Report Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 1 of 34
Application No. 21029 Type Master Site Plan, Certificate of Appropriateness
Project Name North Central Master Site Plan
Summary A master site plan to coordinate site design, phasing, and infrastructure over 5-7 years. The
overall proposed development proposes to construct 493 dwelling units, 26,397 square feet
of retail, 11,000 square feet of restaurant, 43,500 square feet of office, 100 hotel rooms, and
646 off-street parking spaces located in integrated structured parking facilities. The
development is proposed in 4 phases across 9 buildings, four blocks, and includes a total of
4.4 acres of land. The project site is zoned B-3, Downtown District. The 2020 Community
Plan designation is Traditional Core.
Zoning B-3 Growth
Policy
Traditional Core Parcel
Size
194,393 SF
4.4 Acres
Overlay District(s) Neighborhood Conservation Overlay District
Street Address Multiple
Legal Description Tracy’s 3rd Add, S07, T02 S, R06 E, Block B, Lot A, Plat J-198
Beall’s 3rd Add, S07, T02 S, R06 E, Block 3, Lot 1 - 24, Acres 2.963, & Blk 4 Lots 1-10 &
8.5' Tract Adj East Side Plat C-44-A Tracy’s 3rd Add, S07, T02 S, R06 E, Block A, Lot 2 - 3, Acres 1.09063, Amnd Plat C-18-D
Owner Mountain View Building, LLC, Medical Arts Building, LLC, WL-HB 111 Lofts Owner II, LLC, 20 N. Tracy
Ave, Bozeman, MT 59715
Applicant HomeBase Partners, 20 N. Tracy Ave, Bozeman, MT 59715
Representative SMA Architects, 109 E Oak Street, Suite 2E, Bozeman, MT 59715
Staff Planner Danielle Garber Engineer Karl Johnson
Noticing Public Comment Period Site Posted Adjacent
Owners Mailed
Newspaper Legal Ad
11/17/21 – 12/3/21 11/17/21 11/17/21 NA
Advisory Boards Board Date Recommendation
DRC November 3, 2021 None, Adequacy Determination
DRB November 10, 2021 Approval
Recommendation Application is sufficient for approval with conditions and code provisions.
Decision Authority Director of Community Development Date December 17, 2021
Full application: https://weblink.bozeman.net/WebLink/Browse.aspx?id=233806&dbid=0&repo=BOZEMAN
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE
Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 2 of 34
Unresolved Issues: None
PROJECT SUMMARY
The subject properties are within the Neighborhood Conservation Overlay District (NCOD) and located two blocks north
of Main Street on multiple parcels. The subject properties are bound on the east by N. Tracy Ave., the west by N. Grand
Ave., the north by W. Villard St., and the south by W. Lamme St. None of the subject properties is within a historic district.
This master site plan application proposes a phased development to be built out over 5-7 years. The overall development
proposes to construct 493 dwelling units, 26,397 square feet of retail, 11,000 square feet of restaurant, 43,500 square
feet of office, 100 hotel rooms, and 646 off-street parking spaces located in integrated structured parking facilities. The
development is proposed in four (4) phases across nine (9) buildings, covering four (4) blocks, and includes a total of
4.4 acres of land.
When considering the plan review criteria under BMC 38.230.100, the code allows evaluation to be “a more generalized
demonstration of compliance, recognizing that a subsequent site plan will be submitted in the future which will provide
evidence of specific compliance.” Staff reviewed the application as proposed at this time to evaluate conformance of
aspects of required community design, site design, project design, infrastructure, and phasing. Condition of approval 2
requires that “Each phase of this master site plan shall be evaluated independently at the time of development. Aspects
including (but not limited to) water rights or cash in lieu of water rights, required parkland, required parking, grading and
drainage, payback districts, off site infrastructure improvements, and waivers of right to protest will all be evaluated with
each phase at the time of development.” This master site plan does not grant entitlement that would allow the applicant
to proceed with building or demolitions permits on its own, but does provide a general layout, phasing, proposed
infrastructure improvements, and anticipated building heights and programming.
The subject application was submitted February 17, 2021. City staff reviewed this submittal and provided corrections
based on code provisions and adopted standards. This cycle of submittal and review resulted in a total of four revised
application submittals by the applicant. During this adequacy review period the number of residential units, number of
parking spaces, responses to overlay district standards, water, wastewater, and transportation reports, and other
submittal documents and drawings were revised
by the applicant. The project was granted
adequacy on November 16, 2021, meaning it was
sufficient for approval with conditions of approval
and code provisions. The proposed project is
summarized below.
Phase 1
Phase 1 includes an addition to the existing One11
building for 67 new residential units, common
amenities, and associated site improvements. This
site plan and commercial certificate of
appropriateness (CCOA) application was reviewed
by the DRB on June 9, 2021, the motion to
recommend approval failed 3-2 with 3 votes
against, and 2 votes for the recommendation.
Some of the DRB recommended changes were
incorporated, or influenced changes to the design,
and the site plan (#20456) was approved by the Phase 1 Locations
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE
Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 3 of 34
Director on October 22, 2021. Phase 1 also includes the building at Block 4 , known as The Ives. The Ives site plan
(#21165) proposes a mixed-use building with ground floor retail spaces, 99 dwelling units, and 173 parking spaces within
structured parking on three levels of the building. The northwest corner of The Ives is the only area of the master site
plan with adjacency to surrounding residential neighborhoods along an alley, which triggers the zone edge transition
standards in Section 38.320.060. The Ives was reviewed by the DRB on September 8, 2021 and the body recommended
approval to the Director unanimously 5-0. The Ives is still under review with the City and due to the shared parking
proposed by the applicant, cannot be granted final site plan approval until the master site plan is approved. Demolition
of the parking lot at 110 W. Beall, and the building, parking lot, and site improvements at 206 N. Grand is required with
this phase to facilitate the development of One11 2.0, this demolition was approved with the One 11 2.0 site plan and
CCOA. Demolition of the parking lot and site improvements at Block 4 is required to facilitate the construction of The
Ives. This is under review with the Ives SP and CCOA. Conditions of approval related to relocation of the parking spaces
that serve the tenants at the Medical Arts building and the AC Hotel are required prior to any demolition or
commencement of construction. Phase 1 also includes the demolition of the existing Mountain View Care Center
southwest of the corner of North Tracy and West Beall. Demolition approval for the Mountain View Care Center at 205
N. Tracy, which is attached to the historic Bozeman Deaconess Hospital, was approved October 26, 2021. The structure
was built in the 1970’s and was non-eligible for historic status. Subsequent development of the site in the short term will
be site reclamation and conversion to a temporary parking lot with 80 spaces, and the wall adjacent to the old Deaconess
hospital will be filled with brick of similar style to what is existing. A Special Temporary Use Permit (STUP) for the
temporary parking area is in review with the City. The applicant is requesting the temporary parking for 1 year to
accommodate removed parking spaces from Block 4 and Building 3-4. Further development of Mountain View East will
be submitted with Phase 2 for Site Plan and COA review and cannot be constructed until the temporary parking area is
no longer needed following construction of Block 4 (The Ives).
Phase 2
Phase 2 includes Building 3-4, known as The
Henry. The Henry site plan (#21231) proposes a
residential only building with 44 dwelling units, and
45 parking spaces located in a basement
structured parking facility. The Henry was also
reviewed by the DRB on September 8, 2021 and
approval recommended unanimously 5-0. The
Director approved this site plan application on
October 28, 2021 with conditions of approval that
include preventing demolition or construction until
the removed Medical Arts parking spaces are
relocated. Phase 2 includes further development
of the previous Mountain View Care Center
property after expiration of the temporary parking
uses listed above. The proposed building is to be
called Mountain View East, a 6 story building with
3,000 square feet of retail, 6,000 square feet of
restaurant, 43,500 square feet of offices, and 42
residential apartments. Phase 2 Locations
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE
Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 4 of 34
Phase 3
Phase 3 includes Buildings 3-1, 3-2, and 3-3
located along West Beall where the existing 1
story wing of the Medical Arts Building is located.
Building 3-1 proposes 6,000 square feet of
restaurant, 3,000 square feet of retail and 30
residential units above. Building 3-2 proposes
3,000 square feet of retail and 40 residential units
above. Building 3-3 proposes also proposes 3,000
square feet of retail with 46 residential units
above. Phase 3 also includes the Mountain View
West building where the old Deaconess Hospital
currently sits. Mountain View West is proposed to
be a 100-room hotel with associated services. The
existing hospital is a contributing structure, and
the CCOA demolition application is being
reviewed by the City’s Historic Preservation
Planner.
Phase 4
Phase 4 is the final phase in the proposed master
site plan. This phase includes Building 3-5 a 70
unit residential structure. A demolition CCOA
application for the existing Medical Arts tower
building must be reviewed along with the Site
Plan and CCOA design review for the apartment
building.
Please note that all phases also include on- and
off-site infrastructure improvements such as
relocating overhead power and installing new
crosswalks, curb, sidewalk, utility upgrades, new
street lighting, new street trees, and public
landscaping. Subsequent review of site
development for each phase is required in the
form of site plan and CCOA applications, some
including demolition, at the time of development.
Conditions of approval 2, 3, and 4 speak to these
requirements.
Parking is examined in more detail below. Parking
demand is based on currently proposed uses within each building and phase. The applicant is required to refine these
Phase 3 Locations
Phase 4 Locations
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE
Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 5 of 34
calculations with each subsequent site plan application and the City will evaluate proposed off-street parking to ensure
it meets Bozeman Municipal Code standards in place at the time of development.
The relocation of boundary lines and aggregation of lots will be necessary to facilitate construction of the proposed
buildings and site improvements. Condition of approval 7 requires subdivision exemption applications with any
associated easements be submitted and approved with each phase of development.
Administrative Design Review (ADR) has reviewed the design of the proposed master site plan and found the plans do
comply with the standards and intent of NCOD Design Guidelines. The following report reviews how the proposal
complies with Plan Review Criteria, the Growth Policy, Zoning Standards, Engineering Standards, the NCOD Design
Guidelines and the Certificate of Appropriateness criteria (COA) with conditions of approval and code provisions.
Pursuant to section 38.340.020, the Design Review Board (DRB) authority, development applications located within the
overlay district for a project of this size and intensity must be reviewed by the DRB. The DRB is required to make a
recommendation to the Director on this application. The Design Review Board met to review this project at 5:30 p.m. on
Wednesday November 10, 2021 via Webex. City staff and the applicant provided presentations related to applicant’s
proposal and staff review of their proposal. One public comment was provided in support of the project. The board asked
questions of staff and the applicant on several topics, including the sequencing of projects for DRB review, building
programming at the street level, the proposed design variety building to building, the proposed demolition of the Bozeman
Deaconess building, intersection alignment at Lamme and Tracy, the proposed streetscape along Lamme and tree
preservation, the apartment building on Lamme and Willson that is not a part of the project and community engagement
with the building’s residents, construction management and construction impacts, and the proposed raised tree planters
in the public right of way. Discussion among the board members included a desire for applicant to use a variety of
materials and the possibility that the new buildings would feel new and “monotonous” given that they will be built around
the same time, the desire for added inclusivity and workforce housing, recommendations to capitalize on the public areas
so that the spaces feel activated and not empty, the scale of the project around the edges, support for the proposed
“Beall’s alley” and the “festival street” as well as a desire for variety in land scaping, and a desire to preserve the historic
hospital. The motion to recommend approval passed 5-0.
Video of the DRB meeting can be found here: https://bozeman.granicus.com/player/clip/182?view_id=1&redirect=true
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE
Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 6 of 34
FINDINGS OF FACT and APPEAL PROVISIONS CERTIFICATE
A) PURSUANT to Chapter 38, Article 2, Bozeman Municipal Code (BMC), and other applicable sections of Ch.38, BMC,
public notice was given, opportunity to submit comment was provided to affected parties, and a review of the Site Plan
described in this report was conducted. The applicant proposed to the City a Master Site Plan (MSP) and Commercial
Certificate of Appropriateness (CCOA) application to allow the phased construction through subsequent site plan and
CCOA applications, which will include 493 dwelling units, 26,397 square feet of retail, 11,000 square feet of restaurant,
43,500 square feet of office, 100 hotel rooms, and 646 off-street parking spaces located in integrated structured parking
facilities. The purposes of the Site Plan review were to consider all relevant evidence relating to public health, safety,
welfare, and the other purposes of Ch. 38, BMC; to evaluate the proposal against the criteria of Sec. 38.230.100 BMC,
and the standards of Ch. 38, BMC; and to determine whether the application should be approved, conditionally approved,
or denied.
B) It appeared to the Director that all parties and the public wishing to examine the proposed Site Plan and offer comment
were provided the opportunity to do so. After receiving the recommendation of the relevant advisory bodies established
by Ch. 38, Art. 210, BMC, and considering all matters of record presented with the application and during the public
comment period defined by Ch. 38, BMC, the Director has found that the proposed Site Plan would comply with the
requirements of the BMC if certain conditions were imposed. Therefore, being fully advised of all matter s having come
before them regarding this application, the Director makes the following decision.
C) The Site Plan has been found to meet the criteria of Ch. 38, BMC, and is therefore approved, subject to the conditions
listed in this report and the correction of any elements not in conformance with the standards of the Title. The evidence
contained in the submittal materials, advisory body review, public testimony, and this report, justifies the conditions
imposed on this development to ensure that the Site Plan complies with all applicable regulations, and all applicable
criteria of Ch. 38, BMC. On this 20th day of December, 2021, Martin Matsen, Director of Community Development,
approved with conditions this Site Plan for and on behalf of the City of Bozeman as authorized by Sec. 38.200.010, BMC.
D) This Director of Community Development’s project decision may be appealed by filing a documented appeal and
paying an appeal fee to the Planning Division of The Department of Community Development within 10 wor king days
after the date of the final decision as evidenced by the Director’s signature, following the procedures of Sec. 38.250.030,
BMC.
Director of Community development
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE
Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 7 of 34
RECOMMENDED CONDITIONS OF APPROVAL
Please note that these conditions are in addition to any required code provisions identified in this report.
1. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as
conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the
Bozeman Municipal Code or state law.
2. Each phase of this master site plan shall be evaluated independently at the time of development. Aspects
including (but not limited to) water rights or cash in lieu of water rights, required parkland, required parking,
grading and drainage, payback districts, off site infrastructure improvements, and waivers of right to protest will
all be evaluated with each phase at the time of development.
3. A refined phase boundary, detailed construction management plan, and summary of improvements provided in
each phase is required with each subsequent site plan application.
4. The parkland tracking table must be updated with each phase of development.
5. A Public Tree Reimbursement Form will be required for any existing boulevard trees prior to removal. Project
representatives must meet with the Forestry Division to discuss measures for tree preservation/removal with
each subsequent site plan.
6. Public transit route options and stop locations must be considered with each phase of development. HRDC or
the current transit authorities must be contacted and allowed to comment with each phase. If a transit stop is
identified with or adjacent to the development it must be completed prior to final plan approval of that phase.
7. Subdivision exemption applications for lot aggregations and lot line rearrangements can be submitted and
reviewed concurrently with site plan applications for each phase. The amended plat applications must be
approved and recorded prior to final approval of each site development application.
8. Provide draft legal documentation that supports shared infrastructure, such as the stormwater facilities, shared
parking, and shared maintenance across all lots for each phase. Provide draft property owners association
documents or some other legal framework prior to occupancy of any buildings within the master site plan.
9. The Transportation Impact Study (TIS) must be updated prior to site plan approvals within phase 3 to justify the
proposed mid-block crossings.
CODE PROVISIONS
1. BMC 38.230.120. Approval of the final master site plan is effective for five (5) years.
2. BMC 38.560. The purpose of a comprehensive sign plan is to coordinate design, colors, lighting, materials,
mounting, and coordination with building design. A separate comprehensive sign plan is required for each
individual building with more than one commercial space. This will provide diversity in sign design building to
building and contribute to placemaking with a variety of sign types across the development.
3. BMC 38.220.060.A.12.g - Capacity. Indicate the levels of service (before and after development) of existing and
proposed streets and roads, including appropriate intersections, to safely handle any increased traffic. Describe
any anticipated increased maintenance that will be necessary due to increased traffic and who will pay the cost
of maintenance.
a. Trip generation numbers must be provided with each new site plan, comparing the proposed site with
the trip generation identified in the TIS associated with the Master Site Plan.
b. Updated traffic counts at the intersections identified for additional analysis must be collected prior to the
start of construction for the Ives building.
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE
Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 8 of 34
c. The provided TIS has indicated the potential for left turn lanes and reduction of on-street parking on
North Wilson Avenue, should future traffic exceed projections. This street must be reanalyzed prior any
site plan approvals within phase 3. The analysis must address whether the street can safely handle the
increased traffic.
d. The provided TIS has indicated the presence of intersection site sight distance obstructions at Grand
Avenue and Short Street. This intersection must be reanalyzed prior any site plan approvals within
phase 3. The analysis must address whether the intersection can safely handle the increased traffic
due the presence of the obstructions.
e. The provided TIS indicates that stop signs may be warranted and should be analyzed at the
intersections of Villard Street with 4th and 6th Avenues.These intersections must be analyzed prior to
any receiving any site plan approval within phase 2. The analysis must address whether stop signs are
warranted at these intersections.
f. The provided TIS indicates that stop signs may be warrabted abd should be analyzed a the
instersection of Beal Street and Black Avenue. This intersection must be reanalyzed prior any site plan
approval within phase 2. The analysis must address whether stop signs are warranted at this
intersection.
g. The provided TIS indicates that the traffic control in place at the intersection of Villard Street and North
Bozeman Avenue may be inadequate. That intersection must be analyzed for the necessity of afourway
stop or a traffic circle prior to any site plan approvals within Phase 3.
h. The provided TIS did not include trip generation from the AC Hotel project currently under construction.
The parking for the hotel is provided as part of the North Central Master Site Plan. It is anticipated that
the valet parking from the AC Hotel, combined with the other trips generated by the North Central
project, may impact several intersections. The intersections of North Tracy Avenue with Mendenhall
Street and North Tracy Avenue with Lamme Street must be reanalyzed prior to any site plan approval
within Phase 3. This must include traffic counts once the AC Hotel is open or include the trip generation
from AC, including trips associated with the valet parking. Stop sign and signal warrants must be
evaluated as options for traffic calming.
i. The provided TIS indicates that the intersection of North 7th Avenue and PeachStreet/Durston Road
will operate below a Level of Service (LOS) of C with the addition of the site generated traffic. This
intersection must be upgrade prior to occupancy of any building within Phase 4.
4. BMC 38.270.030 – As shown buildings 3-4 and 3-3 sewer will contribute to a downstream sewer constriction.
The downstream sewer main located within Tracy Ave from W Peach St to W Cottonwood St is a 6-inch Vitrified
Clay Pipe (Facility ID: F0310_F0311). This sewer does not meet current city standards. The sewer main must be
improved to an 8 inch sewer main meeting current city standards.
a. The improvements must be in place prior to building permit approval unless concurrent construction
(BMC 38.270.030.D) is approved. Concurrent construction must be requested with respective site plan
applications.
ADVISORY COMMENTS
1. DSSP Plans and Specification Review Policy – Plans, specifications, and submittals for public infrastructure
improvements (street improvements, including street lighting, new fire hydrants, and stormwater facilities) must be
submitted to the City Engineering Department (engsubmittals@bozeman.net) for infrastructure review.
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE
Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 9 of 34
2. DSSP Fire Service Line Standard – Plans for all fire service lines must be submitted to the City Engineering
Department (engsubmittals@bozeman.net) for review.
3. Montana Post-Construction Storm Water BMP Design Guidance Manual The applicant must demonstrate that
seasonal high groundwater will not impact the function or maintenance of the proposed facilities. Industry guidance
recommends a three-foot minimum separation from the bottom of the proposed facility to the underlying groundwater
table. The applicant must provide local seasonal high groundwater elevations to support the proposed design.
4. BMC 40.04.500 Requirement To Control and Reduce Stormwater Pollutants A stormwater drainage/treatment
grading plan and maintenance plan for a system designed to treat the first 0.5 inch of stormwater to remove solids,
silt, oils, grease, and other pollutants must be provided to and approved when the Site Plan application are
submitted. The plan must demonstrate adequate site drainage (including sufficient spot elevations), storm water
detention/retention basin details (including basin sizing and discharge calculations, and discharge structure details),
storm water discharge destination, and a storm water maintenance plan. The approved stormwater maintenance plan
must be incorporated into the Owners Association Documents and a copy must be submitted prior to Site Plan
approval.
5. BMC 38.540.020 The applicant must identify snow storage areas on the Site Plan for the parking area. Snow removal
storage areas must be sufficient to store snow accumulation on site. Such areas shall not cause unsafe ingress or
egress to the parking areas, shall not cause snow to be deposited on public rights-of-way, shall not include areas
provided for required parking access and spaces, and shall not be placed in such a manner as to damage
landscaping.
6. A cleanout in the landscaped right-of-way shall be provided to allow proper maintenance for storm lines with bends.
7. The inlet on corner of Villard Street and North Tracy Avenue must be replaced to connect directly north into a new
manhole. The existing inlet pipe must be properly abandoned. Both items must be addressed with an infrastructure
submittal.
8. Individual site plans must identify overflow paths that demonstrate that no structures will be flooded during a 100-year
storm event.
9. DSSP II.C.3 Basins serving multiple lots shall be located in common open space owned by a Homeowners or
Property Owners Association. Locating a basin within an easement on a lot will not be permitted unless approved by
the governing body.
a. As shown on the provided plans, the City is in general agreement on the overall location of the proposed
stormwater facilities and that a separate drainage easement will need to be provided where facilities serve
multiple lots.
10. BMC 38.410.130.A.1 Water rights The applicant must contact Griffin Nielsen with the City Engineering Department to
obtain a determination of cash-in-lieu of water rights (CILWR). CILWR must be paid prior to respective site plan
approvals.
11. BMC 38.270.030.C Whenever any building lots or building sites are created inside the city limits, municipal water
distribution systems, municipal sanitary sewer collection systems, streets, and stormwater collection, treatment, and
detention or retention systems must be provided to the lot or site. Each building site must utilize and be connected to
both the municipal water distribution and municipal sanitary sewer collection systems. Subject to the provisions of
subsection C.1 of this section, these improvements must be designed, constructed, and installed according to the
standards and criteria as adopted by the city and approved by the review authority prior to the issuance of any
building permits, except when concurrent construction is an identified purpose of the initial project review and
approved pursuant to the criteria established in subsection D of this section.
The possibilities of satisfying this requirement will vary depending on the availability of supporting infrastructure and
desired timing of necessary improvements. The applicant must request to allow concurrent construction of public
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE
Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 10 of 34
infrastructure and private improvements with the site plan submittal if it is desired. A concurrent construction request
after site plan approval will require a modification application and review. The applicant is encouraged to meet with
city staff to discuss how to fulfill concurrent construction requirements if it is desired. The applicant must request
concurrent construction by providing a concurrent construction plan describing when improvements will be completed
(including public infrastructure, private development, and utility services) and how the Completion of Improvements
requirements have been met.
12. DSSP V.A.6.H The applicant must abandon any unused water service stubs at the main.
13. The sanitary sewer service to Block A, Lot 2A is shown running through Block A, Lot 3A. This must be moved to run
straight into the right of way or an easement must be provided were it is located in the adjacent property.
14. Existing water wells are shown in the existing plan. If wells are to be abandoned they must be abandoned in
accordance with DEQ requirements.
15. Change of street widths may require adjustment of location of manholes, inlets, curb stops, hydrants and valve
boxes.
16. DSSP XII Mid-Block Crosswalks A streetlight shall be located one half to one mounting height in front of the
crosswalk on both sides of the street for all mid-block crossings.
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE
Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 11 of 34
Figure 1: Current Zoning & Vicinity Map
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE
Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 12 of 34
Figure 2: Existing Conditions
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE
Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 13 of 34
Figure 3: Proposed Architectural Site Plan Full Build Out
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE
Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 14 of 34
Figure 4: Proposed Civil Site Plan Full Build Out
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE
Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 15 of 34
Figure 5: Utility and Service Area Plan
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE
Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 16 of 34
Figure 6: Common Open Space
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE
Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 17 of 34
Figures 7: Site Design Aerial Perspective Looking SE Towards Main.
Figures 8: Site Design Street Perspective Looking NE
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE
Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 18 of 34
ANALYSIS AND FINDINGS
Analysis and resulting recommendations are based on the entirety of the application materials, municipal codes, standards,
plans, public comment, and all other materials available during the review period. Collectively this information is the record
of the review. The analysis in this report is a summary of the completed review.
Plan Review, Section 38.230.100, BMC
In considering applications for plan approval under this title, the Director of Community Development shall consider the
following:
1. Conformance to and consistency with the City’s adopted growth policy
38.100.040 B
Meets Code?
Growth Policy Land Use Traditional Core Yes
Zoning B-3, Downtown Business District Yes
Comments: The uses are allowed within the zoning district. The property is within the City’s municipal service
area. The project is an infill redevelopment at urban density. The community plan encourages the City to look
inward by prioritizing infill. Theme 3 of the Community Plan focuses on “A City bolstered by downtown and
complementary districts.” The importance of this theme is summarized the following way:
“Concentrated development makes sense for our pocketbooks and overall health. When it comes to promoting a
walkable, bikeable, safe, affordable, and energy-efficient community, density and design matter. Preventing sprawl
and increasing resource efficiency depend on an intensity of urban life found in our commercial centers.”
Staff finds that the project does contribute to the goals of the growth policy including the following:
The traditional core of Bozeman is Downtown. This area exemplifies high quality urban design
including an active streetscape supported by a mix of uses on multiple floors, a high level of
walkability, and a rich architectural and local character. Additionally, essential government services
and flexible spaces for events and festivals support opportunities for civic and social engagement.
The intensity of development in this district is high with a Floor Area Ratio (FAR) well over 1. As
Bozeman grows, continued evolution is necessary for long-term resilience. Challenges do exist,
particularly around keeping local identity intact, balancing growth sensitively, and welcoming more
transportation modes and residents. Underdevelopment and a lack of flexibility can threaten the
viability of the land use designation. Future development should be intense while providing areas of
transition to adjacent neighborhoods and preserving the character of the Main Street Historic
District through context-sensitive development. This project meets the definition of the Traditional
Core by providing residential development intensity in the B-3 district to help support a vibrant
downtown in an underutilized transition area between commercial and residential areas. Infill is
prioritized in the 2020 Community Plan to prevent sprawl and increase resource efficiency.
Goal DCD-2: Encourage growth throughout the City, while enhancing the pattern of community
development oriented on centers of employment and activity. Support an increase in development
intensity within developed areas. This project meets the stated development intensity desired for the
traditional core because it offers a mix of residential, retail, office, and restaurants that will
contribute to the products and services available in the downtown core and bring people, either
residents or those visiting the downtown area, to keep these businesses viable, all oriented around
the downtown commercial center.
Goal M-1.1: Prioritize mixed-use land use patterns. Encourage and enable the development of
housing, jobs, and services in close proximity to one another. As stated above this project proposes
to provide housing in close proximity to jobs and services within the existing mixed-use land
patterns of the City’s core.
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE
Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 19 of 34
Goal N-1: Support well-planned, walkable neighborhoods. This project proposes to construct a focal
point development with functions, activities, and facilities that can be sustained over time. Services
for residents are proposed within the development such as retail, restaurants, and lodging, as well
as opportunities for open spaces and pedestrian/bike only paths between and around buildings.
The proposed development is within walking distance of all downtown businesses and amenities.
2. Conformance to this chapter, including the cessation of any current
violations 38.200.160
Meets Code?
Current Violations None Yes
Comments: No current violations exist.
3. Conformance with all other applicable laws, ordinances, and regulations
38.100.080
Meets Code?
Conflicts None Yes
Condominium ownership NA NA
Comments: The proposed uses of the site are consistent with the allowed uses of the B-3 district including
residential, office, retail, and restaurant. No specific conflicts have been identified. Additional steps will be
required, including but not limited to completion of conditions of approval and code provisions, review of
infrastructure and completion of off-site infrastructure as needed per phase, review and approval of all
subsequent site plans, certificates of appropriateness, final demolition review and approval, and approval of
building permits. The Building Division of the Department of Community Development will review the
requirements of the International Building Code for compliance at the time of each building permit
application.
4. Conformance with Plan Review for applicable permit types as specified in
article 2 Section 38.230
Meets Code?
Site Plan & Certificate of Appropriateness (COA) Yes
Comments: The site plan and COA criteria are met with this project where applicable at the master site
plan level. The proposal is compatible and sensitive to the immediate environment of the site and the
adjacent neighborhoods as described in Section 13 below, and throughout this document.
5. Conformance with zoning provisions of article 3 38.320.100 Meets Code?
Permitted uses 38.310 Commercial, Mixed Use, Apartments and
Apartment Buildings. Varies per site.
Yes
Form and intensity standards 38.320 Yes
Zoning
B-3 Setbacks
(feet)
Structures Parking /
Loading
Yes
Front Block Frontage:
Mixed-
Storefront &
Mixed-
Landscaped
Block Frontages
Block Frontage:
Mixed-
Storefront &
Mixed-
Landscaped
Block Frontages
Rear 0 0
Side 0 0
Alley 5’ 5’
Comments: The proposed setbacks meet all B-3 zone district standards. The proposed building
footprints respond to two different block frontage designations requested by the applicant. Mixed-
Storefront and Mixed-Landscaped. See more on block frontages below. B-3 does not require rear or side
setbacks, but does require 5-foot alley setbacks. Only one dedicated north-south oriented 14-foot alley
exists adjacent to the master site plan to the west of Block 4 (The Ives). A 5-foot alley setback is
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE
Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 20 of 34
proposed, and the building is drawn 8-feet from the property line to accommodate an 8-foot utility
easement. The originally platted north-south oriented alley through Block 3 was vacated in 1970 under
ordinance #902. The applicant does not propose dedicated alleys with the lot rearrangement of Block 3,
but proposes common access easements. One east-west oriented 30-foot wide access easement called
“Beall’s alley” in the plans will provide a mid-block connection between North Willson and North Tracy. As
well as a 20-foot north-south oriented, and a 24-foot north-south oriented access easement on either side
of Beall’s alley connecting West Beall and West Villard streets. No additional setbacks from these
easements are proposed. See more on proposed easements and amended plats below.
Relationship to adjacent properties standards 38.520.030 (light and air access and
privacy) and angled setback plane 38.360.030
NA
Applicable zone specific or overlay standards 38.330-340 Yes
Building Height Requirements 38.320.010-.060 Yes
Lot coverage Varies Allowed 100%
Height Varies Allowed 70’ Yes
Comments: The proposed buildings must meet B-3 height and lot coverage standards in effect at the time of
site plan review for each building and amended plat application with allowable encroachments.
Zone edge transitions are detailed in Section 38.320.060 and provide for additional setbacks and height
setbacks where higher and lower intensity zoning districts are adjacent. The only applicable areas where
the B-3 zoned subject property is directly adjacent to a lower density district is the northwest corner
where the Ives building shares an alleyway with R-4 zoning. For this adjacency, a five-foot setback for the
building is required, and starting at a height of 38-feet a 45-degree angle away from the rear property line
requires the building to setback away from the adjacent district. Zone edge transitions are not applicable
where the zoning transition is separated by a street. The below image shows an example of zone edge
transitions.
Overlay District Standards (NCOD) 38.340 Yes
Comments: See Section 13 below for NCOD analysis
General land use standards and requirements 38.350 Yes
Comments: The project will be required to meet all applicable standards of 38.350, including permitted
height encroachments, which allows parapet walls extending no more than 4-feet above the limiting
height of the building in effect at the time of application.
Applicable supplemental use criteria 38.360 NA
Supplemental uses/type None NA
Comments: No supplemental uses are applicable to this project at this time.
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE
Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 21 of 34
Wireless facilities 38.370 NA
Affordable Housing 38.380.010 NA NA
Affordable housing plan NA
Comments: NA
6a(1). Conformance with the community design provisions of article 4:
Transportation facilities and access 38.400
Meets Code?
Street vision Yes Yes
Secondary access Yes
Traffic Impact Study /
LOS
Yes Transportation
grid adequate to
serve site
Yes Yes
Comments: A TIS was fully evaluated by the Engineering Division and it has been found to meet City
standards for trip generation and level of service analysis. Additional analysis of local street impacts was
requested and provided. 11 new vehicular drive accesses are proposed across the full build to access
service areas or structured and surface parking. A deviation has been requested and approved from
engineering for drive access spacing for the parking garage entrance to Block 4 (The Ives) where it is
closest to the Villard intersection with the alley and this departure is supported by the City Engineer.
Engineering review of transportation deviations is based on traffic volumes, turning movements, traffic
controls, site design, sign distances, and location and alignment of other access points. The public right-
of-way design also adds a traffic-calming circle at the Lamme and N. Grand intersection. Two mid-block
crossings are proposed on Willson and Beall. A condition of approval requires the applicant to provide
updated data that further justies the need for these crossings when uses and pedestrian traffic volumes
are known with Phase 3. Additional conditions of approval are included requiring the TIS be updated with
future individual phases. Updates to the TIS will be required to verify trip generation, update traffic
counts, and identify further mitigation measures for impacts to the transportation system. The provided
TIS indicates that the intersection of North 7th Avenue and PeachStreet/Durston Road will operate below
a LOS of C with the addition of the site-generated traffic. A condition of approval is that this intersection
will need to be upgraded prior to occupancy of Phase 4. The TIS also indicates that the intersections of
Babcock Street with South Rouse Avenue and South 8th Avenue will operate below a LOS C with future
development. The impact of this development is not considered a significant enough proportion of the
volumes at those intersections to warrant improvements be made by the developer. Additionally those
intersections are considered fully built out and therefore eligible for a waiver under BMC Sec.
38.400.060.4a.
Street dedication NA Yes
Drive access locations and widths Yes
Number of drive accesses 11 Yes
Street easements NA
Special Improvement Districts No Yes
Comments: See above comments regarding transportation and drive accesses.
Parking requirements of 38.540
Required parking nonresidential 167 Yes
Required parking residential 379
Reductions nonresidential – B-3 Varies by Use
Reductions – parking structure 15%
Reductions – transit availability 10%
Provided parking off street 646
On street parking 53
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE
Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 22 of 34
Comments: The provided parking plan accounts for known uses and gross floor area sizes at this time for
residential and non-residential off-street parking requirements. This plan will be updated and refined at
the time of site plan application submittal for each subsequent phase and building according to the BMC
parking requirments at the time of submittal. The following table shows required residential and non-
residential parking after reductions, as well as provided off-street parking.
Phase 1 parking for One 11 and The Ives is to be provided within structured parking and in a
surface parking lot. Reductions utilized include an on-street residential reduction, B-3 reductions,
availability of commercial transit, and availability of the public parking structure where applicable.
The non-residential requirement for Block 4 includes the 80 parking stalls provided by agreement
to the AC Hotel on Mendenhall Street. The parking agreement to provide the 80 stalls for the AC
Hotel pre-dates this application. The applicant has provided a draft agreement temporarily
relocating those 80 stalls, and the parking required for the remaining tenants in the Medical Arts
Building, to the temporary parking lot proposed at the Mountain View East site until Block 4 is
constructed when the AC Hotel required parking will return to Block 4 pursuant to the terms of the
original parking agreement.
Phase 2 parking for the Henry and Mountain View East is to be provided entirely within structured
parking. The Mountain View East site will rely on 84 SID 565 parking stalls previously purchased
and on file for the parcels. Reductions utilized include an on-street residential reduction,
residential car share, B-3 reductions, availability of commercial transit, and availability of the public
parking structure.
Phase 3 parking for Mountain View West and Buildings 3-1, 3-2, and 3-3 is to be provided within
structured parking in the 4 buildings, and via 56 SID stalls previously purchased for the Mountain
View West parcel. Reductions utilized include an on-street residential reduction, residential car
share, additional bike parking reduction, B-3 reductions, availability of commercial transit, and
availability of the public parking structure.
Phase 4 parking is to be provided within structured parking. Reductions utilized include an on-
street residential reduction, and residential care share.
Bicycle parking for over 150 bicycles is proposed across the entire development and will exceed
standards.
6a(2). Conformance with the community design provisions of article 4:
Pedestrian and vehicular ingress and egress 38.400
Meets Code?
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE
Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 23 of 34
Design of the pedestrian and vehicular circulation systems assure that pedestrians
and vehicles can move safely and easily both within the site and between properties
and activities within the neighborhood area.
Yes
Vehicle accesses to site 11 Vehicle/loading, 2 Pedestrian Only Yes
Pedestrian access location(s) Yes
Site vision triangles Yes
Fire lanes, curbs, signage and striping Yes
Non-automotive transportation and circulation systems, design features to enhance
convenience and safety across parking lots and streets, including, but not limited to
paving patterns, grade differences, landscaping and lighting
Yes
Crosswalks Yes
Curb ramps Yes
Pedestrian lighting Yes
Comments: The buildings will connect to the public pedestrian system along their street frontages. New drive
accesses will be utilized to access structured parking within buildings, as well as for solid waste pick up, and
for loading and unloading areas where required. The proposed streetscapes along the storefront block
frontages on N. Willson and W. Beall are proposed to be redesigned to include custom 5’ x 10’ raised planters
around boulevard trees and permeable pavers. Traffic calming corner treatments on the corners of Beall street
will have landscaped annual beds and enhanced paving. The storefront treatment will wrap around the corner
of Beall Street and Tracy Avenue to the northeast side of Block 3, and also to the east side and south sides of
Mountain View East. Landscaped block frontage without the planters and with boulevard grasses will define
the streetscape along the north end of Block 3 along Villard Street. Custom streetlights will be utilized to further
define the district as a transition area between downtown and the older adjacent residential neighborhoods.
The City’s Engineering and Forestry Divisions have reviewed these plans for compliance with adopted
standards.
Interior pedestrian and loading only paths through Block 3 and between the Mountain View buildings can be
accessed via pedestrian-only access points on North Willson and North Tracy..
Adequate connection and integration of the pedestrian and vehicular transportation
systems to the systems in adjacent development and the general community
Yes
Access easements 5 of varying widths. Yes
Dedication of right-of-way or easements necessary for pedestrian, shared use
pathway and similar transportation facilities
NA
Comments: 5 public access easements are proposed to facilitate pedestrian circulation through the
master site plan. These easements vary in width from 20-feet to 36-feet.
6a(3) Loading and Unloading areas Meets Code?
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE
Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 24 of 34
Loading and unloading area requirements 38.540.080 Yes
Loading and unloading Yes Yes
First Berth (min. 70 feet
length, 12 feet in width and
14 feet in height)
Yes Yes
Additional Berths (min. 45
feet length)
NA NA
Comments: Only one off-street loading berth is required for the proposed hotel at Mountain View West. The
applicant proposes to utilize the pedestrian easement to the east of the hotel for these purposes. The
proposed area will meet the dimensional requirements detailed above. This will be evaluated in more detail
with the review of the site plan for this building in phase 3.
6b Community design and element provisions 38.410 Meets Code?
Lot and block standards 38.410.040 Yes
Rights of way for pedestrians alternative block delineation NA
Comments: NA
Provisions for utilities including efficient public services and utilities 38.410.050-060 Yes
Municipal infrastructure requirements Yes
Easements (City and public utility rights-of-way etc.) Yes
Water, sewer, and stormwater Yes
Other utilities (electric, natural gas, communications) Yes
CIL of water Yes
Comments: General infrastructure requirements for transportation and utility service has been evaluated by
the City’s Engineering Department with this application, including water and sewer demand, and traffic
impacts. New infrastructure for each phase will be evaluated at the time of each development application,
including infrastructure review of plans for items like change of street widths requiring adjustment of location
of manholes, inlets, and curb stops, new street lighting, new fire hydrants, storm mains, downstream sewer
lines, and fire service lines. Many of these requirements are listed in the code provisions and advisory
comments above.
Site Surface Drainage and stormwater control 38.410.080 Yes
Location, design and capacity Yes
Landscaping per 38.410.080.H NA
Comments: Reviewed by the Engineering Department. All stormwater facilities are to be underground
infiltration chambers.
Grading 38.410.080 Yes
Maximum 1:4 slope requirements met NA
Comments: Grading reviewed by the Engineering Department.
6c. Park and recreation requirements 38.420 Meets Code?
Enhancement of natural environment NA
Wildlife habitat or feeding area preservation NA
Maintenance of public park or public open space access NA
Park/Recreational area design NA
Parkland Cash-in-lieu for maximum known density not to exceed
12 units/acre (ac.).
Yes
To be calculated with each development application.
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE
Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 25 of 34
Cash donation in-lieu(CIL) To be calculated with each
development application.
Yes
Improvements in-lieu NA NA
Comments: The Bozeman Municipal Code requires CIL of parkland to be provided for residential
development in the B-3 district. Each subsequent development application will be required to submit a
CIL of parkland calculation and payment prior to approval.
7a-c. Conformance with the project design provisions of Article 5,
Compatibility, Design and Arrangement
Meets Code?
Compatibility with, and sensitivity to, the immediate environment of the site and the
adjacent neighborhoods and other approved development relative to architectural
design, building mass, neighborhood identity, landscaping, historical character,
orientation of buildings on the site and visual integration.
Yes
Block Frontage Standards 38.510 Yes
Comments: Compatibility within this section refers to provisions within Article 5 for block frontages, site
planning and design elements, building design, landscaping, and other sections. The intent of these
design standards includes ensuring that new developments within existing neighborhoods are compatible
with, and enhance the character of Bozeman’s neighborhoods. Compatibility may be achieved by
meeting or exceeding the the project design standards in this section. The applicant has proposed an
arrangement of block frontage designs that will create a mixture of storefront and landscaped
streetscapes to improve the pedestrian experience, while being sensitive to adjacent development. This
is achieved by focusing high traffic uses such as retail and restaurants away from adjacent residential
neighborhoods which is reflected in the site, landscaping, and building design as it is known at this time.
These commercial areas will be directly connect to the the downtown commercial district via Willson and
Tracy Avenues. This area north of downown between Main Street and the proposed project along these
streets is currently characterized by administrative and professional buildings, hotels, multi-household
residential, health services, and commercial parking lots. Where directly adjacent to lower density
residential development and not separated by a street, the applicant will be required to utilize the zone
edge transition standards as described above. Enhancement of the immediate environment of the site
and adjacent neighborhoods is found to be achieved by adding a mixed-use district complementary to the
existing B-3 district where it sits, and removal of non-compliant site design including large swaths of
underutilized surface parking lots. By concealing parking within structures, adding storefronts, enhancing
the sidewalk design, adding public landscaping including street trees, and meeting density objecives of
the downtown core, the application meets the community design framework outlined in this section as
proposed. Documents and drawings showing that each proposed building is meeting the required
standards for the Mixed-Storefront and Mixed-Landscaped frontages designated in future applications is
required. Currently known design elements include ground level uses, building placement, building
entrances, sidewalk width, and landscaping are provided with this application and meet minimum
standards. Block frontage requirements specific to building design such as façade transparency, and
weather protection will be evaluated with each subsequent application.
Structured parking facility development standards 38.510.030.M Yes
Comments: The structured parking will be required to be completely wrapped with active residential or
commercial uses meeting the minimum depths required where parking is proposed to be provided above
ground. Other requirements of this section appear to be met including, street level openings and parking
entrances with the current site plan. Full compliance will be evaluated with each subsequent application.
Site Planning and Design Elements 38.520 Yes
Design and arrangement of the elements of the plan (e.g., buildings, circulation, open
space and landscaping, etc.) so that activities are integrated with the organizational
scheme of the community, neighborhood, and other approved development and produce
an efficient, functionally organized and cohesive development.
Yes
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE
Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 26 of 34
Relationship to adjacent properties 38.520.030 NA
Non-motorized circulation and design 38.520.040 Yes
Vehicular circulation and parking 38.520.050 NA
Comments: Non-motorized circulation is present around and within the proposed master site plan. Access
easements, interior landscaping, public art, pedestrian lighting, open space, and patios are proposed with
this master site plan and are intended to promote an active, connected neighborhood, and vibrant street-
level experience. These elements will also be evaluated with future applications for compliance with this
plan and municipal standards at the time of application.
Design and arrangement of elements of the plan (e.g., buildings circulation, open
space and landscaping, etc.) in harmony with the existing natural topography, natural
water bodies and water courses, existing vegetation, and to contribute to the overall
aesthetic quality of the site configuration
NA
Comments: NA, urban design and conditions.
Building Design 38.530 NA
Comments: NA. Building design is not being evaluated with this plan. Conceptual perspective drawings
have been provided. Building design is to be evaluated in detail with each subsequent application.
Diversity in building design is expected to add character to the district and meet NCOD subchapter 4B
design guidelines. Subsequent buildings will be expected to meet required standards for massing and
articulation to achieve an appropriate perceived scale and add visual interest. High quality building details
and building materials will also be required.
7d. Conformance with the project design provisions of Article 5, Landscaping
including the enhancement of buildings, appearance of vehicular use, open
space and pedestrian area and the preservation of replacement of natural
vegetation
Meets Code?
Submittal requirements for landscape plans 38.220.100 Yes
Mandatory landscaping 38.550.050 Yes
Yard NA
Additional screening NA
Parking lot screening Yes – One11 2.0 (Phase 1)
Interior parking lot landscape Yes – One11 2.0 (Phase 1)
Off-street loading spaces screening NA
Street frontage Yes
Street median island NA
Acceptable landscape materials NA
Protection of landscape areas NA
Irrigation: plan, water source, system
type
NA
Trees for residential adjacency Yes
City rights-of-way and parks Yes
Tree plantings for boulevard ROW, drought-resistant seed Yes, where
applicable
Public ROW boulevard strips Yes
Irrigation and maintenance provisions for ROW Yes
State ROW landscaping NA
Additional NA NA
Fencing and walls NA NA
Comments: Only public landscaping details have been provided with this application with the proposed
streetscape design. Specific tree species, plantings, and irrigation will be evaluated with subsequent
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE
Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 27 of 34
development applications. A tree preservation plan has been provided and the applicant is required to
coordinate with the City’s Forestry Department on any public tree removal and reimbursement. 5 of the 6
mature trees that exist adjacent to the Bozeman Deaconess structure and the proposed Mountain View
West structure are proposed to be preserved. The only surface parking proposed has been reviewed with
the One11 2.0 site and has been found to meet code for landscape screening and interior parking lot
landscaping.
Site planning and design required 38.520 Yes
Pedestrian area landscaping, including pathways and internal circulation 38.520.040 NA
Internal roadway landscaping 38.520.050 NA
Open space landscaping 38.520.060 NA
Service area and mechanical equipment landscaping and screening 38.520.070 NA
Open space NA
Comments: Interior landscaping has not yet been provided for this plan. The applicant will be required to
meet any applicable landscaping requirements for pedestrian areas, building foundations, and open space at
the application for future development.
7e. Conformance with the project design provisions of Article 5, Open Space Meets Code?
Open Space Section 38.520.060 NA
Total required NA NA
Total provided NA NA
Comments: Common open space areas have been delineated within pedestrian access easements and
adjacent to and within future buildings. Condition of approval 8 requires a legal framework be provided to
facilitate funding and maintenance of these spaces when shared between parcels. The amount of
residential and commercial open space, and the configuration and design of that space will be evaluated
with future development against the adopted standards in place at the time of application.
7f. Conformance with the project design provisions of Article 5, Lighting
38.570
Meets Code?
Building-mounted lighting (cutoff and temperature) NA
Site lighting (supports, cutoff and temperature) Yes
Minimum light trespass at property line NA
Comments: Custom street lights have been provided with this application. Engineering supports the
custom luminaires and custom pole height for the proposed street lighting within the public right of way.
Planning staff supports the use of common lighting within the master site plan.
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE
Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 28 of 34
7g. Conformance with the project design provisions of Article 5, Signage
38.560
Meets Code?
Allowed (sq. ft.)/building NA NA
Proposed (sq. ft.) NA
Comments: No signage is proposed at this time. Comprehensive sign plans will be required for buildings
with two or more commercial spaces. A sign permit is required prior to the construction of any new
signage.
8a-c. Conformance with environmental and open space objectives in articles 4-
6 Meets Code?
Enhancement of natural environment: Integrated stormwater, LID, removal of
inappropriate fill
NA
Grading Yes
On-site retention/detention Yes
Comments: Reviewed by Engineering Department.
Drainage design Yes
Stormwater maintenance plan 38.410.030.A Yes
Stormwater feature: landscaping amenity, native species, curvilinear, 75% live
vegetation
NA
Comments: No above ground stormwater facilities proposed.
Watercourse and wetland protections and associated wildlife habitats NA
If the development is adjacent to an existing or approved public park or public open
space area, have provisions been made in the plan to avoid interfering with public
access to and use of that area
NA
Comments: NA
9. Conformance with the natural resource protection provisions of articles 4-6 Meets Code?
Watercourse setback 38.410.100 NA
Watercourse setback planting plan NA
Floodplain regulations 38.600 NA
Wetland regulations 38.610 NA
Comments: NA
10. Other related matters, including relevant comment from affected parties
38.220
Meets Code?
Public Comment Yes
Comments: Public notice was conducted and is detailed on page 1 of this report. 1 letter of public
comment was received outside the public notice period. 16 letters of public comment were received
within the public notice period and are summarized by topic below:
No affordable housing plan. House Bill 259 passed by the 2021 Montana State Legislature
prohibits price limited affordable housing, or inclusionary zoning ordinances to be enforced
locally. This renders the City of Bozeman’s affordable housing ordinance under BMC 38.380
unenforceable. The Bozeman Municipal Code does not have any other mandatory affordable
housing provisions.
Parking and traffic concerns. The traffic impact study or TIS received by the applicant was
reviewed by the City’s transportation engineer and found to meet adopted standards and code
requirements at the time of review. Staff reviewed the proposed parking and mobility plan for
compliance with standards. Both the traffic impacts and required off-street parking spaces will be
continuously reviewed as subsequent plans within this master site plan are submitted for
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE
Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 29 of 34
development. See the conditions of approval list for TIS capacity and level of service
requirements that will be evaluated as the project is developed.
Compatibility with the existing environment. The proposed master site plan is within the B-3
zoning district and adjacent to residential zoning districts to the east, west and north. The
applicant has proposed a development that meets B-3 zoning and density standards, as well as
all applicable project design stanards in the BMC. See Section 13 below for Certificate of
Appropriateness criteria in the neighborhood conservation overlay district and Section 5 above
for form and intensity and zone edge transition standards. See Section 7a for project design
requirements.
Demolition and preservation of historic structures and adjacency to the North Tracy
Historic District. See Section 13 below for Certificate of Appropriateness criteria in the
neighborhood conservation overlay district.
Shadows and energy bills for adjacent structures. This is not a review criteria found in the
BMC. Therefore, staff has no metric for impacts in this area and the concerns raised do not
impact staff’s analysis of the application’s compliance with code requirements.
Parkland requirements. Cash-in-lieu of parkland to satisfy residential parkland requirements is
required in B-3 zoning; see Section 6C of this report.
An attached matrix details the public comment by individual commenter.
11. If the development includes multiple lots that are interdependent for
circulation or other means of addressing requirement of this title, whether the
lots are either: Configured so that the sale of individual lots will not alter the
approved configuration or use of the property or cause the development to
become nonconforming OR Are the subject of reciprocal and perpetual
easements or other agreements to which the City is a party so that the sale of
individual lots will not cause one or more elements of the development to
become nonconforming. 38.410.060
Meets Code?
Subdivision exemption Required for lot aggregation and boundary
realignment
Yes
Required Easements Yes, by individual development and phasing Yes
Reciprocal access and
shared parking easement
Yes To be provided with
future development
review.
Yes
Mutual access easement and
agreement
Yes To be provided with
future development
review
Yes
Comments: Separate subdivision exemption applications are required as phases develop. A legal
framework for shared access, utilities, stormwater, and other amenities will be provided prior to
occupancy of any new buildings within this plan. All future amended plats must be reviewed, approved,
and recorded prior to final site plan approval for each building.
12. Phasing of development 38.230.020.B including buildings and
infrastructure
Meets Code?
Phasing No # of phases 4 Yes
Comments: See the summary at the beginning of this report for a description of phasing. Each phase of this
master site plan shall be evaluated independently at the time of development. Aspects including (but not
limited to) water rights or cash in lieu of water rights, required parkland, grading and drainage, payback
districts, off site infrastructure improvements, and waivers of right to protest will all be evaluated with each
phase at the time of development.
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE
Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 30 of 34
13. Standards for certificate of appropriateness and Conformance with the
NCOD Guidelines 38.340.050
Meets Code?
Certificate of appropriateness standards Yes
Secretary of the Interiors Standards for new construction NA
Architectural appearance NA
Proportion of doors and windows NA
Relationship of building masses and spaces Yes
Roof shape Yes
Scale Yes
Directional expression, with regard to the dominant horizontal or vertical expression
of surrounding structures
NA
Architectural details NA
Concealment of non-period appurtenances, such as mechanical equipment Yes
Materials and color schemes NA
Comments: The proposed project is located within the NCOD. This means that the project must adhere to
a higher level of design, focus on the relationship of the surrounding area, and maintain a level of integrity
and character that makes up the NCOD. Individual buildings are not evaluated with this application;
however, aspects of the plans where applicable (such as general known mass, scale, and mechanical
and service area locations) have been evaluated for compliance:
Relationships of masses and spaces. Mass is described as the physical size and bulk of a
structure. While individual buildings are not evaluated with this plan the overall layout shows
buildings of varying footprints, orientations, and heights between 4 and 6 stories connected by
publically accessible open spaces that permeate blocks. Building heights and programmed
uses may vary as different phases of the master site plan are submitted for review over the next
5 to 7 years. Building height does not alone contribute to the perceived mass of a structure or
block. As seen currently within the downtown area and the B-3 zone, buildings with adequate
façade articiulation including the use of welcoming building entries, windows, structural
expression, and changes in material can all serve to reduce how a structure is viewed from the
street level and from adjacent properties. The bulk of any building reviewed within city limits is
subject to BMC massing and articulation standards to achieve an appropriate perceived scale
and add visual interest, as well as the use of building details, building materials, and treatment
of any blank walls. As buildings within this plan are submitted for review, staff will evaluate both
the building design standards within the Bozeman Municipal Code and the design requirements
of Chapter 4B of design guidelines for the NCOD to ensure that the buidlings will enhance the
existing B-3 zone and adjacent downtown neighborhoods.
Roof shape. The primary use of flat roof forms is a desired design element of the B-3 district.
Scale. Scale is described as the size of a structure as it appears to the pedestrian. As
described above with masses and spaces, individual building design is not reviewed with this
plan. The applicant has provided a cohesive public streetscape to differentiate the district from
both downtown and nearby lower density residential uses that will provide a transition between
those neighborhoods. Buildings will be required to design active commercial storefronts or,
where facing lower density neighborhoods, active residential uses. New buildings will be
required to be designed with a clear order and comprehensive composition on all elevations.
This is usually expressed with a 15-foot floor-to-floor height for the first level to activate the
pedestrian experience, middle floors to add a comprehensive composition, and a cap at the roof
or parapet.
Concealment of mechanical equipment. This application provides design guidelines for
locations of service areas away from primary street frontages and adjacent residential uses.
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE
Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 31 of 34
Introduction Yes
Comments: The introduction to the 2006 Design Guidelines for Historic Preservation contains an
overview of preservation goals within the Neighborhood Conservation Overlay District (NCOD), as well as
an outline of the Certificate of Appropriateness design review system. Preservation principles and goals
are not applicable to the proposed project except at the original Bozeman Deaconess Hospital at 15 W.
Lamme. While this application shows demolition of the Deaconess Hospital and redevelopment over the
site, this application does not provide entitlement for that demolition. A separate demolition application
has been submitted to the City and is under review by the City’s preservation planner where demolition
criteria as detailed below will be evaluated. Aside from preservation principles, the introduction provides a
guide based on type of work proposed. This master site plan proposes new construction within the
NCOD, but outside of any historic district. According to this chapter the new construction must be
evaluated against the design guidelines for all properties in Chapter 2, as well as those for specific
character areas in Chapter 4B. In 2015 subchapter 4B was added to the guidelines by resolution 4598 to
guide properties zoned B-3 (Central Business District) that serve as a transition between the Main Street
Historic District and residentially zoned neighborhoods. Those areas are shown in the map below, which
shows the B-3 district extents as a red line as it was in 2015 in relation to historic districts.
Chapter 2: Guidelines for all properties Yes
Comments: Applicable standards from Chapter 2 are met including site design, enclosed parking, and
street patterns related to properties zoned B-3. The proposed streetscape and lighting will add variety to
the district, with permeable pavers, and raised planters for street trees to soften the pedestrian
experience and distinguish the built environment from the downtown core. This chapter states that any
new development should include street trees and that the historic urban design character for street tree
placement should be considered. The existing sites within this proposed development largely do not
contain any street trees or public landscaping. This project does propose to add street trees along all
street frontages within planters where storefronts are proposed, and within grass boulevards along West
Villard and North Tracy where the existing street pattern is primarily residential. In terms of interior
landscaping design, the guidelines state to preserve and maintain mature trees and significant vegetation
within all corridors. The large mature trees fronting the Deaconess Hospital along West Lamme St. are
proposed to be preserved with this plan. Chapter 2 states that the visual impact of surface parking should
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE
Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 32 of 34
be minimized. The proposed plan would place the majority of all parking within structured parking that is
wrapped with commercial or residential active uses. Chapter 2 provides guidelines for utilities and service
areas and states to orient service entrances, waste disposal areas and other similar uses toward service
lanes and away from major streets. The proposed plan guides the location of utility meters and trash
approaches to be primarily adjacent to alleys, interior driveways, or internal to the site.
Chapter 4b: Guidelines for commercial areas outside of Main Street Historic District Yes
Comments: Subchapter 4B provides guidelines for the B-3 commercial character area. This chapter
states the “downtown district is planned for continued intensification over time with building additions as
well as new construction replacing dilapidated and underutilized older structures on underdeveloped
properties.” This chapter provides guidelines to meet these goals that are described below:
Mass and Scale. Mass and scale are both described above under the general criteria review.
This section states, “Varied mass and scale along a streetscape and block is inevitable and can
contribute to a more interesting urban pattern that continues to evolve over time.” There are
three guidelines to achieve desired mass and scale in this area 1) Provide density to meet the
goals of the Downtown Bozeman Improvement Plan (DBIP), 2) Innovative development and
diversity of design is encouraged, and 3) A new building should exhibit clear order and
comprehensive composition on all elevations. The DBIP states that density is needed to
reinforce downtown as the city center through new buildings, considerable height, and a diverse
mix of uses. This submittal meets that goal by providing a mixture of uses including retail,
restaurant, office, and housing at the urban densities permitted in the B-3 zoning district.
Individual building design is not reviewed with this application but new buildings will be reviewed
against these mass and scale standards as they are submitted over the next 5 years.
Building Quality – This is not applicable to the master site plan review, but is a requirement for
subsequent development moving forward.
Building Roof Form – Flat roof forms are primarily shown within the conceptual drawings and
buildings submitted for review to date. Roof forms will be evaluated with subsequent
development applications.
Site Design – This section states, “All sites in downtown should be designed to make the
experience of pedestrians and bicyclists safe, comfortable and visually appealing. This section
provides two primary guidelines to achieve this objective, 1) Create strong connections between
downtown’s sub-districts, and between downtown and the surrounding neighborhoods, and 2)
Public spaces should be made active through programming or utilizing opportunities with
adjacent uses that promote vitality and safety. This proposed project achieves these goals by
designing a custom streetscape that echoes the storefront design of downtown but provides a
softer alternative with permeable pavers and raised planters along Willson, W. Beall, and
portions of Tracy and Lamme, and more traditional green boulevard strips along W. Villard, and
portions of Tracy, and Lamme. This design is strengthened by an alternative public lighting
system that includes alternative luminaires, pole heights, and incorporates lower bollard lighting
at publically accessible pedestrian paths through blocks and adjacent to public and private open
space areas. The proposed project is one block north of Mendenhall Street, and two blocks
north of Main Street with direct pedestrian connections along the sidewalk network via Willson
and Tracy.
Parking Facilities. The primary goal of this section is to minimize visual impacts of parking.
Concealed structured parking is proposed throughout the project to minimize impacts.
Street Patterns – This section states, “Historic settlement patterns seen in street and alley plans
often contribute to the distinct character of the downtown and therefore they should be
preserved. These street plans influence the manner in which primary structures are sited and
they also shape the manner in which landscape features may occur on the site.” “Alleys” are
proposed via access and utility easements through Block 3 and between the Mountain View
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE
Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 33 of 34
buildings to facilitate access to service areas and required loading and unloading zones. The
streetscape, as discussed above proposes a variety of street paving designs and planting strips
with street trees.
Landscape Design. This section states “plant beds near and around building foundations and
along walkways are encouraged. Some sites may containing plantings that have historic
significance and should be retained, to the extent feasible. Some mature trees may also
contribute to the historic landscape and should be preserved.” Internal landscaping plans are not
yet known and will be evaluated against these standards as buildings are proposed within the
plan. Public landscaping is discussed above and will meet the standards of this section. A tree
preservation plan has been provided and the applicant is required to coordinate with the City’s
Forestry Department on any public tree removal and reimbursement. 5 of the 6 mature trees that
exist adjacent to the Bozeman Deaconess structure and the proposed Mountain View West
structure are proposed to be preserved.
Utilities and Service Areas. The proposed plan guides the location of utility meters and trash
approaches to be primarily adjacent to alleys, interior driveways, or internal to the site.
Site Furniture. The locations and design of specific site furniture like benches, bike parking, and
trash receptacles is not known at this time and will be evaluated with review of subsequent
development proposals. The lighting proposed is to be uniform across the development and is
discussed above.
Appendices Yes
Comments: The appendices contain a variety of information including the Secretary of Interior’s (SOI)
Standards for Rehabilitation, interpretation of terms, benefits of historic preservation, a historic overview
of the City of Bozeman, architectural styles, and definitions. The SOI standards do not apply to this
proposed review, no rehabilitation is currently proposed. Applicable terms for interpretation for this review
are Context, Contributing Property, Non-Contributing Property, and Non-historic.
Contributing Property. A building that is identified as having significance and contributing to the
character of a designated historic district is considered a “contributor.” These typically appear on
an official survey of historic resources, but in some cases, significance may be determined at the
time that an application for approval is submitted. Preservation of key defining features is the
goal. The only contributing property within this proposed plan is the Bozeman Deaconess
hospital at 15 W. Lamme. This property is discussed in more detail below.
Non-contributing Property. A building found within a designated historic district, but which does
not contribute to the significance of the district, is in this category. This may be a newer building
that has not taken on significance, or it may be an older one that has been so substantially
altered that it lacks integrity as a historic resource. The objective is to assure that, if altered or
scraped, the result would be compatible with the historic context, but preservation of features on
the building itself is not a consideration. All but one building located within this proposed
development are considered non-contributing.
Non-historic. Recent buildings and those 50 years old or older which have lost their integrity are
considered “non-historic.” These buildings do retain property value, but do not possess the
significance and/or physical integrity necessary to be considered a historic resource. This is now
often referred to as non-eligible.
Context is interpreted as those properties and structures adjacent to, and within the same block
as, the proposed project. The site covers all of or portions of four city blocks, abuts the edges of
the B-3 zoning district, and is adjacent to six street frontages. The built context includes the
newly constructed One11 building to be included within this master site plan, 301 N. Willson
(non-eligible, constructed after 2000) is located off Beall adjacent to the project, and 122 W.
Lamme (individually listed Brandenburg House) to the south. 17 W. Lamme is located adjacent
to the proposed Mountain View West development, a 4-story 1940’s brick addition to the original
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE
Staff Report
North Central Master Site Plan Review
Application 21029
December 17, 2021
Page 34 of 34
Bozeman Deaconess Hospital that is currently used for public housing and is not proposed to be
altered by this master site plan. A variety of commercial and residential buildings is located to
the west and south. To the northeast along Villard and Beall is the North Tracy Historic District.
While not directly abutting the district, the vicinity and area is characterized by lower density
bungalow homes to the north and east. This application proposes to build at B-3 densities up to
the edge of the zoning district, but has provided an arrangement of softer streetscapes with
boulevard planting strips and residential uses to better relate to the context along West Villard
and North Tracy Avenue. Within the City’s available regulatory standards for zone edge
transitions the height setback adjustments for multi-story buildings in B-3 adjacent to R-2 only
apply when the two zoning districts share a property line or alley, no such angled setback is
required if separated by a street. The northeast corner of the proposed project is adjacent to R-2
along Tracy and Villard, but the districts are separated by a street so no height setback is
required.
15. NCOD Demolition 38.340.080-110 Review of Demolition of a non-historic,
historic, and unsafe structure or site
Meets Code?
Historic Structure per 38.700.090 Yes NA
Comments: Demolition of non-contributing structures will be made with each subsequent development
application either concurrently or as standalone applications. There is one historic structure proposed to
be demolished with this plan and that is the original Bozeman Deaconess Hospital at 15 W. Lamme. In
2014, a Montana Historic Structures inventory was completed for the building. The inventory lists the
construction period as the 1920’s and the architect as Fred Willson. The building has not operated as a
hospital since the 1980’s. The west wing, built in 1944 is currently operated as housing units. The east
wing, built in 1971 was converted to senior nursing care. The east wing has received demolition approval
from Community Development, and the west wing is not a part of this application. The hospital itself is
associated with Bozeman’s Progressive Phase lasting from 1913 to 1929 and it was the first substantial
community operated hospital to serve the growing Gallatin County population at that time. The property
retains elements of historic materials, workmanship, design, setting, feeling and association to justify its
recommendation as a contributing element and a historic property. On October 6, 2021, a letter from Ben
Abbey, Interim Chief Building Official, was provided to the applicant. This letter details his determination
that this building is an unsafe structure due to structural conditions and poses a dangerous condition to
the public. The building owner was ordered to immediately secure the building, including boarding up
windows and securing all ingress and egress access points to prevent the occupancy of the structure. A
demolition application for this structure is in review by the City’s Historic Preservation Planner and criteria
within this section will be evaluated at the time of application in accordance with BMC requirements..
DocuSign Envelope ID: A58D5D7E-D560-4576-AE67-BA222C7334FE