Loading...
HomeMy WebLinkAboutAS-203BuildingElevationsLEVEL 1 100' -0" LEVEL 2 113' -0" T.O. LOW WALL 129' -0" 12345 T.O. CLERESTORY 134' -0" T.O. STL 127' -2" T.O. STL (HI) 132' -0" 1.52.53.54.5 08.5113 08.3613 08.5114 07.7123 16.000203.4500 03.4500 03.4500 08.5113 07.7005 08.5113 05.7360 05.7360 15.0002 2' - 0"3' - 0"1' - 10"14' - 2"13' - 0"34' - 0"07.7100 EXTERIOR MATERIAL LEGEND METAL PANEL PRECAST 002 BRICK VENEER OVER PRECAST PRECAST 001 CORTEN PANEL ARCH CONCRETE CORTEN OVER PRECAST ARCH STEEL, PAINTED BLACK LEVEL 1 100' -0" LEVEL 2 113' -0" T.O. LOW WALL 129' -0" 56789 T.O. CLERESTORY 134' -0" T.O. STL 127' -2" T.O. STL (HI) 132' -0" 5.56.57.5 8.28.6 AS-550 3 08.5114 08.5114 07.7123 15.0002 08.5114 05.2700 03.450008.5114 08.5113 16.0002 08.3613 05.7360 05.7360 34' - 0"2' - 0"3' - 0"1' - 10"14' - 2"13' - 0"07.7100 10.1415 PROJ. NO. DATE: © DRUMBEAT SCALE: SHEET NUMBER SHEET TITLE: ISSUED FOR: 650 South 500 West Salt Lake City, UT 84101 www.drumbeat.us www.qfactorsolutions.com 7/22/2021 12:35:18 PMBIM 360://Industry Bozeman/20400_Industry Bozeman_A19_Central.rvtAs indicatedTECHNOLOGY BLVDBOZEMAN, MT 5971820400.00 2021-0715 SITE PLAN CD SET BUILDING ELEVATIONS AS-203 INDUSTRY BOZEMAN 1/8" = 1'-0"2 ELEVATION - EAST 02 0'4'8'16' 0'4'8'16' PROJECT FLAGNOTES NO. FLAGNOTE 03.4500 PRECAST CONCRETE PANELS 05.2700 STEEL CANOPY, CUSTOM 05.7360 STEEL RAILING, CUSTOM 07.7005 PRE-WEATHERED CORTEN STEEL ON STANDOFFS 07.7100 PREFINISHED METAL PARAPET CAP 07.7123 DOWNSPOUT 08.3613 OVERHEAD DOOR, GLASS 08.5113 WINDOW, TYP 08.5114 WINDOW, CUSTOM 10.1415 INDUSTRY, METAL SIGN 15.0002 ROOF TOP UNIT, RE: MECH 16.0002 EXT. LIGHT FIXTURE, RE: ELECTRICAL 2 AS-203 1/8" = 1'-0"1 ELEVATION - EAST 01 1 AS-203 7/21/2021