Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
A3.10EastElevation_06082021
Level 1 EL: 0" Level 3 EL: 26' -3 1/4" Level 2 EL: 15' -10" Level 4 EL: 36' -8 1/2" Level 6 EL: 58' -1" Roof EL: 70' -0" Level B1 EL: -12' -0" Level 5 EL: 47' -1 3/4" Level 1 Mezz EL: 5' -8" Grade Level EL: -6' -0" ABCDEF 15' - 10"11' - 11"10' - 11 1/4"10' - 5 1/4"10' - 5 1/4"10' - 5 1/4"10' - 2"5' - 8"6' - 0"6' - 0"21' - 0"31' - 0"29' - 2"30' - 0"17' - 6" 150' MAX 150' MAX FACADE WIDTH PER BMC 38.530.040.C 132' - 0" MECHANICAL SCREEN 30' - 0"30' - 0"30' - 0"28' - 0"14' - 0" FACADE ARTICULATION FOR RESIDENTIAL BUILINDGS PER BMC 38.530.040.C. AT LEAST (3) ARTICULATION FEATURES EVERY 30' MAX -WINDOWS -ENTRIES -WEATHER PROTECTION (CANOPY) -VERTICAL PILASTERS -ARTICULATED DARK BASE MATERIAL -VERTICAL CHANGE IN BUILDING MATERIAL -WINDOWS -ENTRIES -WEATHER PROTECTION (CANOPY) -VERTICAL PILASTERS -ARTICULATED DARK BASE MATERIAL -VERTICAL CHANGE IN BUILDING MATERIAL -WINDOWS -ENTRIES -WEATHER PROTECTION (CANOPY) -VERTICAL PILASTERS -ARTICULATED DARK BASE MATERIAL -VERTICAL CHANGE IN BUILDING MATERIAL -WINDOWS -VERTICAL PILASTERS -ARTICULATED DARK BASE MATERIAL -VERTICAL CHANGE IN BUILDING MATERIAL -WINDOWS -VERTICAL PILASTERS -ARTICULATED DARK BASE MATERIAL -VERTICAL CHANGE IN BUILDING MATERIAL70' - 0" BUILDING HEIGHTBONUS6' - 0"76' - 0" = 70' (BUILDING HEIGHT) + 6' (BONUS)ARTICULATION FEATURES PROVIDED: ARTICULATION FEATURES PROVIDED:ARTICULATION FEATURES PROVIDED: ARTICULATION FEATURES PROVIDED: ARTICULATION FEATURES PROVIDED: WINDOWS, TYP ENTRY, TYP WEATHER PROTECTION (CANOPY), TYP VERTICAL PILASTER, TYP ARTICULATED DARK BASE MATERIAL, TYP VERTICAL CHANGE IN BUILDING MATERIAL A. BRICK E2. BALCONY GLASS, CLEAR D2. LIGHTER STANDING SEAM METAL C2. DARK METAL ACCENT E2. BALCONY GLASS, CLEAR C2. DARK METAL ACCENT C1. DARK METAL FACADE SPR-A3.14 1 B. ENGINEERED STONE E1. VISION GLASS, CLEAR F. BOARD-FORMED CONCRETE G. WOOD PANELING, TYP AT ROOF SOFFIT E1. VISION GLASS, CLEAR G. WOOD PANELING, TYP AT CANOPY SOFFIT EXTERIOR MATERIAL LEGEND A. BRICK B. ENGINEERED STONE C1. DARK METAL FACADE D1. DARK STANDING SEAM METAL C2. DARK METAL ACCENT E1. VISION GLASS, CLEAR E2. BALCONY GLASS, CLEAR F. BOARD-FORM CONCRETE G. WOOD PANELING D2. LIGHTER STANDING SEAM METAL Project Number: Sheet Number: © 2021 Solomon Cordwell Buenz EAST ELEVATION NORTH TRACEY AVE BOZEMAN, MT 59715 THE HENRY SPR-A3.10 2021002 SCALE:1/8" = 1'-0" 1 EAST ELEVATION - TRACY AVE TRANSPARENCY PROVIDED (SQ FT) 36.4% 3,499 TRANSPARENCY REQUIRED (SQ FT) 15.0% 1,443 ELEVATION AREA (SQ FT)- 9,619 FRONTAGE DESIGNATION - RESIDENTIAL BLOCK FRONTAGE STANDARDS TRANSPARENCY TABLE 38.510.030.A AREA OF TRANSPARENCY CALCULATIONS - EAST ELEVATION A A NO. DATE DESCRIPTION 06.08.2021 SITE PERMIT REVIEW A 08.17.2021 SITE PERMIT REVIEW RC1