Loading...
HomeMy WebLinkAboutA1.01SitePlan_08172021UPDN UPUPDNDNDN DNDNDN DN UPUP1 2 3 4 5 6 7 A B C D E F TRACY AVEVILLARD STREET VISION TRIANGLE POWER/ COMMUNICATION UTILITY BOXES BEALL'S ALLEYWEST ALLEY59' - 2" UTILITY METERS TRASH ACCESS SWITCH GEAR VISION TRIANGLE VISION TRIANGLE HEATED SLAB @ DIAGONAL HATCH, SEE CIVIL DWGS. BASEMENT EASEMENT ON ADJACENT PROPERTY, SEE CIVIL DWGS. LANDSCAPE AREA LANDSCAPE AREA FDC PLANTED BOULEVARD PRIVATE PATIO BALCONY ABOVE BALCONY ABOVE BALCONY ABOVE BALCONY ABOVE LANDSCAPE ELEMENTS, SEE LANDSCAPE DWGS. BALCONY ABOVE PROPERTY LINE PROPERTY LINE BALCONY ABOVE CANOPY ABOVE CANOPY ABOVE CANOPY ABOVE BUILDING EXIT RESIDENTIAL EXIT FITNESS ENTRY BUILDING EXIT MAIN BUILDING ENTRY RESIDENTIAL EXIT BALCONY ABOVE LANDSCAPE AREA LANDSCAPE AREA BIKE WORK- SHOP ENTRY 132' - 8"59' - 4 1/2"83' - 2"5' - 1"14' - 10"LANDSCAPE AREA 143' - 0" 28' - 6"28' - 6"28' - 6"28' - 6"28' - 6"17' - 0"17' - 6"30' - 0"29' - 2"31' - 0"21' - 0"132' - 8"1' - 10"2' - 2"2' - 2 1/2" DECORATIVE SCREEN, 54" AFF. TYP AT VILLARD PATIOS HANDRAIL, TYP AT VILLARD PATIOS CONCRETE WALL - SEE LANDSCAPE RAILING RAILING20% RAMP DNUP10% DNTRASH ACCESS 10' - 0" NO PARKINGNO PARKING NO PARKINGNO PARKINGBIKE PARKING 12" CONCRETE PLANTER WALL AT VISION TRIANGLE PRIVATE PATIO 9' - 4 3/4"12' - 10 3/4"12' - 11"8' - 7 5/8" 8' - 7 5/8"11' - 6"8' - 2 1/2"11' - 6"OVERHEAD GARAGE DOOR GAS METERSELECTRICAL METERSTRASH ROOM 1 PARKING SPACE 36.2' PROVIDED PER CIVIL 24' - 0" MIN 7' - 0"4 PARKING SPACESTYP 7' - 0"24' - 0" MIN, TYP108.8' PROVIDED PER CIVIL96' - 0" MIN.OVERHEAD GARAGE DOOR GAS METERSEXISTING 3-STORY "TOWER" BUILDING EXISTING 1-STORY MEDICAL ARTS BUILDING A PARKING GARAGE ACCESS 24' - 0"3' - 0"7' - 0"7' - 0"3' - 0"7' - 0"3' - 0"7' - 0"3' - 0"4" TYP4" TYPA 4" TYP 4" TYP 3' - 0"7' - 0"3' - 0"7' - 0"5' - 0"20' - 6"A 4' - 8 5/8" A A Project Number: Sheet Number: © 2021 Solomon Cordwell Buenz SITE PLAN NORTH TRACEY AVE BOZEMAN, MT 59715 THE HENRY SPR-A1.01 2021002SCALE:3/32" = 1'-0" 1 SPR SITE PLAN NO. DATE DESCRIPTION 06.08.2021 SITE PERMIT REVIEW A 08.17.2021 SITE PERMIT REVIEW RC1