Loading...
HomeMy WebLinkAbout11_ParkingNarrative_06082021PARKING NARRATIVE BLOCK 3.4 THE HENRY SPR SUBMITTAL THE HENRY | BLOCK 3.4 | LOTS 1-6 OF BLOCK 3 OF BEALL’S THIRD ADDITION SECTION 07, PLAT C-44-A PARKING NARRATIVE Building 3.4 includes 44 residential units and 45 below-grade structured parking stalls. Figure 1 shows the base residential parking requirements and calculations for parking reductions for on-street parking and transit availability resulting in a requirement for 34 off-street parking stalls. Figure 2 shows a summary of residential parking required versus off-street parking provided. The 11 stalls above the parking requirement will be used to support other uses in the North Central Master Plan. Figure 2. Building 3.4 Parking Summary Figure 1. Building 3.4 Residential Parking Requirement Four bike parking spaces are required (10% of base parking requirement of 44 stalls before reductions) and 66 are provided. January 25, 2021 | Unified Development Code (UDC) Requirements Parking requirements are contained in Division 38.540 of Article 5 in the Bozeman al Code that is part of the Unified Development Code (UDC). UDC provides several par g reductions that will be utilized for North Central as hown in Figure January 25, 2021 | North Central is designed to be a model for multi modal accessibility through estments in a range of mobility options, including structured parking. The project includes a mix of uses including residential, office, commercial/retail, and restaurant and its location in Downtown Bozeman is accessible via walking, biking, driving, rideshare, and transit. To support the vision for North Central as a pedestrian focused project with a carless alleys and public spaces the project at build out be supported by 100% structured off street parking within buildings to create more open space, a dynamic public realm and a memorable pedestrian experience. Parking will be shared among the different land uses on site to ensure the system is being managed efficiently. North Central have expansive bicycle parking and amenities for residents uding carshare vehicles. Office, retail, and restaurant workers have access to ample and quality bike parking and facilities including and lockers graphic in Figure s elements of the North Central parking and mobility strategy: PARKING NARRATIVE BLOCK 3.4 THE HENRY SPR SUBMITTAL THE HENRY | BLOCK 3.4 | LOTS 1-6 OF BLOCK 3 OF BEALL’S THIRD ADDITION SECTION 07, PLAT C-44-A North Central is designed to be a model for multi-modal accessibility through investments in a range of mobility options, including structured parking. The project has a mix of uses that include residential, office, commercial/retail, and restaurant and its location in Downtown Bozeman is accessible via walking, biking, driving, rideshare, and transit. To support the vision for North Central as a pedestrian focused project with carless alleys and public spaces the project will be supported by 100% structured off-street parking within buildings to create more open space, a dynamic public realm and a memorable pedestrian experience. Parking will be shared among the different land uses on site to ensure the system is being managed efficiently. North Central will have expansive bicycle parking and amenities for residents including carshare vehicles. Office, retail, and restaurant workers will have access to ample and high-quality bike parking and facilities including showers and lockers. The graphic in Figure 1 highlights elements of the North Central parking and mobility strategy: Figure 1. Parking + Mobility Strategy PARKING DEMAND Unified Development Code (UDC) Requirements Parking requirements are contained in Division 38.540 of Article 5 in the Bozeman Municipal Code that is part of the Unified Development Code (UDC). The UDC provides several parking reductions that will be utilized for North Central as shown in Figure 2. Figure 2. Bozeman Municipal Code Parking Reductions Building 3.4, as currently designed, modifies the Master Plan as follows: Figure 4. Parking provided in Phase 2 as indicated in the initial North Central Master Plan Figure 5. Revised data for Building 3.4 resulting in a (2) space reduction in parking demand v. NCMP PARKING DEMAND (cont.) Based on the revisions noted above, Building 3.4 has 12 parking spaces that are allocated to alternate uses by the North Central Master Plan. This is in addition to lowering the parking demand of the building by 4 residential units. PHASE BUILDING/SITE LAND USE NET SQFT/ UNITS PARKING REQUIREMENT EMPLOYEE PARKING BASE RESIDENTIAL RAKING REQUIRED ON-STREET REDUCTION RESIDENTIAL TRANSIT AVAILABILITY RESIDENTIAL CAR SHARE RESIDENTIAL PARKING REQUIRED W/ ON-STREET REDUCTION 2 BUILDING 3.4 RESIDENTIAL 48 1 : 1 N/A 48 6 43 41 35 PHASE BUILDING/SITE LAND USE NET SQFT/ UNITS PARKING REQUIREMENT EMPLOYEE PARKING BASE RESIDENTIAL RAKING REQUIRED ON-STREET REDUCTION RESIDENTIAL TRANSIT AVAILABILITY RESIDENTIAL CAR SHARE RESIDENTIAL PARKING REQUIRED W/ ON-STREET REDUCTION 2 BUILDING 3.4 RESIDENTIAL 44 1 : 1 N/A 44 5 39 37 33 PARKING NARRATIVE BLOCK 3.4 THE HENRY SPR SUBMITTAL THE HENRY | BLOCK 3.4 | LOTS 1-6 OF BLOCK 3 OF BEALL’S THIRD ADDITION SECTION 07, PLAT C-44-A Bike parking is required for residential. A total of 66 bike stalls are provided in Block 3.4 (See Figure 7). Figure 7. Bike Parking LAND USE BASE BIKE PARKING REQUIRED ADDITIONAL BIKE PARKING TOTAL BIKE PARKING RESIDENTIAL 5 (10% of required parking)83 66 PARKING NARRATIVE BLOCK 3.4 THE HENRY SPR SUBMITTAL THE HENRY | BLOCK 3.4 | LOTS 1-6 OF BLOCK 3 OF BEALL’S THIRD ADDITION SECTION 07, PLAT C-44-A OVERALL MASTER PLAN The table below reflects the current North Central MSP submittal parking count at Phase 2. This indicates that the parking for the Master Plan works when the surface lot at the Building 3.4 site is removed and Building 3.4 is constructed during Phase 2. Note that the overall parking demand of Block 3.4 has been reduced from the original master plan, as outlined on the previous page. Thus with Building 3.4 as currently shown, there will be a lower parking demand than initially planned with respect to the overall master plan parking requirement. Figure 6. Initial North Central MSP parking requirements at Block 3.4 Phase 2 PARKING DEMAND (cont.) 45 800' MAXProject Site Bridger Park Downtown Garage PARKING NARRATIVE BLOCK 3.4 THE HENRY SPR SUBMITTAL THE HENRY | BLOCK 3.4 | LOTS 1-6 OF BLOCK 3 OF BEALL’S THIRD ADDITION SECTION 07, PLAT C-44-A PARKING REDUCTION - Available Residential Transit