HomeMy WebLinkAboutResolution 3265 change Order 4,5,7 and 8 for Professional Bldg.
COMMISSION RESOLUTION NO. 3265
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN,
MONTANA, APPROVING AL TERATION/MODIFICATION OF CONTRACT
WITH WALKER CONSTRUCTION, INC., BOZEMAN, MONTANA.
WHEREAS, the City Commission did, on the 18th day of May 1998, authorize award
of the bid for the renovation of the Professional Building to Walker Construction, Inc.,
Bozeman, Montana; and
WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such
alterations or modifications of the specifications and/or plans of the contract be made by
resolution; and
WHEREAS, it has become necessary in the prosecution of the work to make
alterations or modifications to the specifications and/or plans of the contract.
NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of
Bozeman, Montana, that the proposed modifications and/or alterations to the contract
between the City of Bozeman, a municipal corporation, and Walker Construction, Inc., as
contained in Change Order Nos. 4, 5, 7 and 8, attached hereto, be and the same are hereby
approved; and the City Manager is hereby authorized and directed to execute the contract
change orders for and on behalf of the City; and the Clerk of the Commission is authorized
and directed to attest such signature.
PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana,
at a regular session thereof held on the 21 st day of September 1998.
~~~
ATTEST: ALF M. STIFF,,rMayor
()J; ;/~
ROBIN L. SULLIVAN
Clerk of the Commission
-
- .----.
---". -
_ ,M. _' '_',' ~ _ _ _ ~ - . ~ ~ ,-----_._~, ... -- --
-' ~ --,- I r-1'~"'" U'-
01) I Q;J I 'HI U:O~ FAX 1 400 sse J~21 WALKER CONSTInTCT
~OO1
~m~1!
PROnCT~ CbaD;e Order li4
BO'Utn.n ProfHlio"..' BuiJdins
20 E. Olive D.te: 07/29191
Bozeman, Mt. ~'71S
Owner: Contr.attor:
City of Bo.:em.... Walke... COD3tfUdion InC':_
P 0 Bos '40 2203 L.a Avenue, Suite
B
Boztmal1. Mt. 59715 Bozeman, Mt. 59715
. Demo Xi Remodel Buement Hallway
$1815.00
lncludes: Demo. materials. tap eI tHi\i.nt. light! I!Jwitch. plumbing. c~ilifl i:.l abOT
. Handrail. replace both stairways wielea!' fir
1780.00
Includes: Remodel, hardwa:re. polY\Jretbane,labor
.. Wmdow hardware I,lp-grade
200.00
Sub- Tow:
$3795.00
10% Mcrkup
379. so
Sub-Tow
S417450
IJ% Bond
- 62.62
TOTA.L FOR CHANGE OlWER #4; $4237.12
-----------,-_.- .-. -.,-.----
03JJ1;f1,,, 1 " ; ().s F.\! 1 408 ~S6 J~27 'if ALKER CO~ SIRC(.'1'
~OO3
~HANGE ORDER
PROJECT: Chante Order Revi.ted #~
Bo~m.n Prort5sional Building
20 E. Olive Date: 08/31198
BonmAn, Mt. !971'
OWl} t1"~ Contract<<H";
City of Bmemaa Walker Construction Inc..
pobOX 640 22()3 Le~ Avenue, Suite B
B07.tmaa, Mt. 5971 S Bonman, Mt. 59715
As Per Drawing5 provided by Bayliss ArCru.tCl;t$;
FuITJsh & install (5) emergency lighu as per Curry Electric
Furni,h & imtall (4) exit lights a.s per CUrl)' Electric $5170.00
R~plkin to walls ~
Sub Total:
$ 5220.00
1.5% Bond
18.30
] 0% Markup
529,83
TOT..o\L FOR CRAL'{GE ORDER 1/5: $ ~S28.13
.,.j..
.-.
--..-"...-
--- IH1.;U::" U.:.
UHI~~~~ MI\~!I~'~~'~
U..J/ '..J..L'" :..:, ~":.J...,- ...~~_I. ':;"'i.". \1 ~ '"tr~~-:,~_,,_~_I~.~V 000 ..JO. J WAI.JU'.;J(. <';UN~THlJcr ..
. ~ IQJ 001
CRANGE ORD@
PROJECT: Change Order #7
BQZemaD ProftlsionaJ }luildht~
20 E. Oli,,~ Date; 09/01/98
BoztftUan, Mt, S971!
Owner: Contractor:
City of BozemRD Walker COrtrt/"'lIttioa lite.
pobox 640 2203 Lea Anoue, Suite B
Boz.m.a, Mt. !971!i Bozeman, Mt. 597lS
~
Removal of sink in basement room:
MAteriab $ SQ.OO
Tape & pa.int 150.00
Plumbing /Demo 150.00
L.bor 230.00
SlJb TotsJ~ $580.00
10% Markup 53.00
1.5% Bond 2..U
TOTAL FOR CHANGE ORDER #7: $647.!7
',..:1 ,-'..l.' #)1..). j,..;....>";' r ."\~II.. ~ .. 'J v ,}.,. \J V.y .... j
r"."i,j""t,,c.n ",\_J~",)J.^""\::4 ltJOO~
,..., 'I \. ~'. '.,
.
CHANG-EO~ER.
-- .. -
PROJECT~ Chanit O'rder #3
Bo'%1tnHan pTQfenional Building
20 'E. 01ive Date: 09/0!J'98
B.,w;em:tn. Mt. 59715
Owner: Contractor~
City of 8o~eman Wltlkcr Construction me.
pobox 640 2203 Le~ Avenue. Suite B
Buztman, Mt. 59715 Boztman, Mt. 59715
Fire Ala.nn Re]ay for E1ev3tor Return System:
Curry & SOn!! ~
(Supply & ic:rt~.n relay to I.Box in elevator)
Sub T otat: $ 475.00
10% Markup 47.50
1,5% Bond 2M
TOTAL FOR CHANGE ORDER #S; $ :530.34
O\VNER: CONTRACTOR:
~,~,..,,_., ,. .
~. -,.-.,.-.,...."'.-..--
'''''''.','',