Loading...
HomeMy WebLinkAbout1 - Attachment C - Site Plan, Renderings, and Schematic Floorplan Design2 2 3 3 DD GG 4 4 5 5 20' - 0"60' - 0"49' - 8" 20' - 0"21' - 0" 18' - 0" 21' - 0" 10' - 0" 22' - 0" 17' - 8" 1 1 7 7 9 9 HH JJ CC 6 6 8 8 FF KK10' - 0" 5' - 0"77' - 0"8' - 0" 11' - 4" 2' - 8" BB 428 SF PHYSICAL FITNESS 207 SF HOSE STORAGE 122 SF SCBA 110 SF FILL EE AA LADDER TRUCK 47'-1" L X 10'-4" W 12'-0" H ENGINE 33'-11" L X 10'-0" W X X 12'-0" H MEDIC/ AMBULANCE (FUTURE) 24'-0" L X 10'-0" W X 9'-6" H QUICK RESPONSE VEHICLE (3/4 TON TRUCK) 22'-0" L X 8'-0" W X 6'-8" H 317 SF DAY ROOM 520 SF KITCHEN/DINING 80 SF SLEEP 1 80 SF SLEEP 2 80 SF SLEEP 3 80 SF SLEEP 4 80 SF SLEEP 5 80 SF SLEEP 6 113 SF AID ROOM 38 SF VEST 228 SF LOBBY 79 SF IT 122 SF OFFICE 323 SF FF WORK AREA 75 SF RR 81 SF AIR LOCK 84 SF EMS STORAGE 4702 SF APPARATUS BAY 111 SF CORRIDOR 587 SF CORRIDOR 169 SF CORRIDOR 96 SF WATER 149 SF STAIR 1 WASH ALCOVE 159 SF LAUNDRY 86 SF TOILET / SHOWER 86 SF TOILET / SHOWER 86 SF TOILET / SHOWER 86 SF TOILET / SHOWER 48 SF VEST 119 SF DECON 175 SF CLEANING 217 SF BUNKER GEAR 114' - 0"129' - 8" 61 SF CUST 319 SF SHOP I I 128 SF OFFICE 83 SF RR 91 SF STORAGE HOTEL OFFICE SUITE - APPROX 425 SF 80'-0" preferred COPYRIGHT 2021PRELIMINARY DRAWINGSNOT FOR CONSTRUCTION12/3/2021 8:15:35 AMA1.0 SCHEMATIC DESIGN ISSUE DATE 2105CITY OF BOZEMANFIRE STATION 2TBD KAGY BLVD, BOZEMAN, MONTANA 59715FIRST FLOOR PLAN1/8" = 1'-0"A1.0 1 FIRST FLOOR PLAN NORTH 11,500 SF ISSUE DATE DESCRIP. Date 1 Revision 1 2 2 3 3 DD GG 4 4 5 5 1 1 7 7 9 9 HH JJ CC 6 6 8 8 FF KK BB EE AA 212 SF STAIR 122 SF STORAGE OPEN TO BELOW OPEN TO BELOW 192 SF MEZZ OPEN TO BELOW 141 SF ELECT STEEL GUARDRAIL ROOF ACCESS PLAZA GREEN ROOF 1089 SF MECH 262 SF STORAGE 425 SF MECH 194 SF IT 94 SF ELECT I I COPYRIGHT 2021PRELIMINARY DRAWINGSNOT FOR CONSTRUCTION12/3/2021 8:15:35 AMA1.1 SCHEMATIC DESIGN ISSUE DATE 2105CITY OF BOZEMANFIRE STATION 2TBD KAGY BLVD, BOZEMAN, MONTANA 59715SECOND FLOOR PLAN1/8" = 1'-0"A1.1 1 SECOND FLOOR NORTH WEST FLOOR AREA -SF EAST FLOOR AREA -SF TOTAL SECOND FLOOR:3,000 SF FIRST FLOOR AREA 11,500 SF TOTAL BUILDING AREA:14,500 SF (NOT INCLUDING HOTEL SUITE) ISSUE DATE DESCRIP.